| Owner | Filings | Most Recent |
|---|---|---|
| OGU PRESS, INC. | 4 | 03/22/2026 |
| B29-35 WEST 119 STREET HDFC | 1 | 03/21/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 01/30/2017 | $2.4M | — | — → — | $261/sf building |
| Firm | Filings | Most Recent |
|---|---|---|
| HT ASSOCIATES | 4 | 06/25/2025 |
| POLY ENGINEER PC | 1 | 04/03/2025 |
| YOU GAO | 1 | 01/16/2025 |
| MCCRAY ARCHITECT P.C. | 2 | 03/08/2023 |
| Representative | Filings | Most Recent |
|---|---|---|
| YBL NY | 4 | 03/21/2026 |
| HAOTIAN & ASSOCIATES INC. | 4 | 03/21/2026 |
| AN TONG FAN | 2 | 03/21/2026 |
| INDESIGN STUDIO | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| M. INT'L ENGINEERING PLLC | General Contractor | 3 | 03/21/2026 |
| BENJAMIN DREBIN | Electrical | 2 | 03/21/2026 |
| KJK ELECTRIC INC | Electrical | 1 | 03/21/2026 |
| KJK ELECTRIC INC | Electrical | 1 | 03/22/2026 |
| SMOOT, ALEXANDER | Electrical | 1 | 03/21/2026 |
| ZHENG LI | Electrical | 1 | 03/21/2026 |
| ALL AMERICAN CONSTRUCTION | General Contractor | 1 | 07/08/2026 |
| SAFEPIPE PLUMBING INC | Plumbing | 1 | 07/08/2026 |
| NEPTUNE SIGNS AWNINGS | Scaffold | 1 | 07/08/2026 |
| CRAWLEY, STEVEN | Electrical | 1 | 03/21/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| FLUSHING ENGINEERING SERV | 4373 | 4 | 06/25/2025 |
| YOU GAO | 9407 | 1 | 01/16/2025 |
| M. INT'L ENGINEERING PLLC | 3129 | 2 | 03/08/2023 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Sign | Signed-off | DESTHERS, JOSEPH | 04/21/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | ALL AMERICAN CONSTRUCTION | 12/20/2024 |
| DOB NOW | Plumbing | Signed-off | BELLEROSE PLBG & HTG | 12/20/2024 |
| DOB NOW | General Construction | Permit Issued | M. INT'L ENGINEERING PLLC | 03/15/2023 |
| BIS | OT | ISSUED | LOYOLA PAINTING & CONST | 02/09/2018 |
| BIS | OT | ISSUED | HHI TECH INC | 12/15/2017 |
| BIS | PL | ISSUED | CAPE PLUMBING INC | 12/12/2017 |
| BIS | OT | ISSUED | LOYOLA PAINTING & CONST | 10/27/2017 |
| BIS | FP | ISSUED | MASTER FIRE SYSTEMS, INC | 08/26/2014 |
| BIS | FP | ISSUED | MASTER FIRE SYSTEMS, INC | 06/11/2009 |
| BIS | PL | ISSUED | O.C. PLUMBING & HEATING INC. | 03/04/2004 |
| BIS | — | ISSUED | RIJO WELDING INC | 04/08/2002 |
| BIS | FP | ISSUED | MASTER FIRE SYSTEMS, INC | 10/13/1998 |
| BIS | PL | ISSUED | CAPE PLUMBING INC | 10/13/1998 |
| BIS | OT | ISSUED | EASTWING CONTRACTING CO. | 01/28/1998 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 06/25/2025 | Permit Issued | ALL AMERICAN CONSTRUCTION | Refrigeration Systems, Ventilation Systems | Ventilation Trane TRANE - NTXMSM60A182AA 66,000 BTU · Condensing Unit ×1 TRANE - TPEFYP024MH144A 27,000 BTU · Ahu ×1 TRANE - TPEFYP036MH144A 40,000 BTU · Ahu ×1 Aaon AAON - RQ-006-8-V-FB09-352 1,050 CFM · Makeup Air ×1 Captiveaire CAPTIVEAIRE - DU85HFA 1,260 CFM · Kitchen Exhaust ×1 Refrigeration Turbo Air TURBO AIR ADR112AE 14,763 BTU · Refrigeration Unit ×1 TURBO AIR TS010MR404A2-T 1,503 CFM · Condensing Unit ×1 |
| 04/03/2025 | — | — | Ventilation Systems | Ventilation Captiveaire NCA16FA 3,600 CFM · Exhaust Fan ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/25/2025 | Signed-off | BELLEROSE PLBG & HTG | Gas, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 02/10/2025 | Permit Issued | KJK ELECTRIC INC | General Wiring |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 06/27/2025 | Tenant Protection Plan Compliance | — | special |
| 06/27/2025 | HVAC-R and service water heating equipment | KY FU | energy_progress |
| 06/27/2025 | HVAC-R and service water piping design and insulation | KY FU | energy_progress |
| 06/27/2025 | HVAC-R and service water heating system controls | KY FU | energy_progress |
| 06/27/2025 | Maintenance information | KY FU | energy_progress |
| 06/27/2025 | Energy Code Compliance Inspections | KY FU | progress |
| 06/27/2025 | Fire-Resistant Penetrations and Joints | KY FU | special |
| 06/25/2025 | Tenant Protection Plan Compliance | — | special |
| 06/24/2025 | Energy Code Compliance Inspections | KY FU | progress |
| 06/24/2025 | HVAC-R and service water piping design and insulation | KY FU | energy_progress |
| 06/24/2025 | HVAC-R and service water heating equipment | KY FU | energy_progress |
| 06/24/2025 | Maintenance information | KY FU | energy_progress |
| 06/24/2025 | Fire-Resistant Penetrations and Joints | KY FU | special |
| 06/24/2025 | HVAC-R and service water heating system controls | KY FU | energy_progress |
| 04/03/2025 | Fire-Resistant Penetrations and Joints | — | special |
| 03/25/2025 | Tenant Protection Plan Compliance | — | special |
| 01/09/2025 | Structural Stability – Alterations of existing buildings | You Gao | special |
| 01/09/2025 | Final | You Gao | progress |
| 12/03/2024 | Mechanical Systems | — | special |
| 12/03/2024 | Final | — | progress |
| 11/08/2024 | Maintenance information | KY FU | energy_progress |
| 11/08/2024 | Ventilation and air distribution system | KY FU | energy_progress |
| 11/08/2024 | Mechanical Systems | KY FU | special |
| 11/08/2024 | Fire-Resistant Penetrations and Joints | KY FU | special |
| 11/08/2024 | Tenant Protection Plan Compliance | KY FU | special |