← Back
BuildNYC
Over six families without stores
2537 VALENTINE AVENUE
BRONX · BIN 2013612
💬 Discuss this project
1922Year Built
5Stories
C1Building Class
R8Zoning
43,270 sfGross Floor Area
52Units
LL97 CoveredRent Stabilized102 Active Violations 1 likely answered 3 old, status unconfirmed ▸
Over six families without stores · Owner of record: Avdi Realty · 12,616 sf lot · 3.43 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 31 filing · 5 docs
Floor 2
Floor 1Heavy duty sidewalk shed installation1p · 1 filing · 3 docs
Cellar12p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Avdi Realty703/22/2026
Moybros Realty203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/31/2018$6.8M—2537 MOYBROS REALTY CORP → AVDI REALTY LLC$157/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Professional Engineering Service107/31/2020
New York & Company303/21/2020
Green Design107/18/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
New York & Company603/21/2026
Atlantic Building Supply203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Arbeni ManagementGeneral Contractor103/21/2026
JJS BuildersScaffold107/08/2026
Bell Fuel OilPlumbing107/08/2026
Value Construction BXGeneral Contractor107/13/2018
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
New York Engineering Associates851203/21/2020
Building Lifecycle
08/14/2026
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE KITCHEN LOCATED AT APT…
HPD violation · open
08/14/2026
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BASE CABINET AT WASH BASIN IN THE BATHROOM LOCATED AT APT E1, 5th STORY, 1st…
HPD violation · open
08/14/2026
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd ROOM FROM NORTH, THE…
HPD violation · open
08/14/2026
§ 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE,…
HPD violation · open
08/14/2026
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FT AT WEST WALL IN THE BATHROOM LOCATED AT APT…
HPD violation · open
213 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offApproved Energy10/16/2019
DOB NOWBoiler EquipmentPermit IssuedApproved Oil Co of Brooklyn10/08/2019
DOB NOWSidewalk ShedSigned-offJJS Builders07/18/2018
BISOTISSUEDArbeni Management07/28/2020
BISOTISSUEDArbeni Management03/21/2019
BISOTISSUEDValue Construction BX07/13/2018
BISFBISSUEDRichard Mortman01/05/2007
5 projects · most recent 06/16/2022
General Wiring
FiledStatusContractorScope
06/16/2022CompleteDemand ElectricGeneral Wiring
11/25/2019CompleteDemand Electric—
02/20/2019Permit IssuedGemini ElectricGeneral Wiring
07/17/2018CompleteRichard Neu—
05/30/2018CompleteGemini ElectricGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
03/23/2020Maintenance informationLOUIS ARENAenergy_progress
03/23/2020Heating SystemsLOUIS ARENAspecial
03/23/2020Fuel-Oil Storage and Fuel-Oil Piping SystemsLOUIS ARENAspecial
03/23/2020HVAC and service water heating system controls LOUIS ARENAenergy_progress
03/23/2020HVAC and service water heating equipment LOUIS ARENAenergy_progress
10/11/2019HVAC and service water heating system controls LOUIS ARENAenergy_progress
10/11/2019Maintenance informationLOUIS ARENAenergy_progress
10/11/2019HVAC and service water heating equipment LOUIS ARENAenergy_progress
10/11/2019HVAC insulation and sealing LOUIS ARENAenergy_progress
10/09/2019Energy Code Compliance InspectionsLOUIS ARENAprogress
07/17/2018FinalSunil Saigalprogress
75 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account