← Back
Two family brick
2539 EASTCHESTER ROAD
BRONX · Pelham Gardens · BIN 2053015
💬 Discuss this project
1935Year Built
2Stories
B1Building Class
R4Zoning
1,782 sfGross Floor Area
2Units
Two family brick · 1,800 sf lot · 0.99 FAR built · Flood zone X
Locations of Work
Architecture
Roof2p · 1 filing · 13 docs
Floor 11p · 1 filing · 13 docs
Site & exterior7p · 1 filing · 13 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GINO O. LONGO, ARCHITECT301/12/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
THOMAS M RANERIGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GINO O. LONGO ARCHITETCT331301/12/2023
Building Lifecycle
All (14)Filed (3)Permit Issued (1)Signed Off (1)Inspection (1)Objection (4)Special Inspection (4)
02/17/2023
Signed off — Alteration
APPLICATION HEREWITH FILED TO REPLACE WOOD DECK AT REAR OF DWELLING WITH METAL FRAME DECK AND RENOVATION OF EXISTING PORCH AT FRONT OF DWELLING WITH NEW WOOD FRAME CANOPY AND RECONSTRUCTION OF FRONT STEPS. NO CHANGE IN OCCUPANCY, USE OR EGRESS.
X00573276-I1
02/16/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/12/2023
Filed — Alteration
APPLICATION HEREWITH FILED TO REPLACE WOOD DECK AT REAR OF DWELLING WITH METAL FRAME DECK AND RENOVATION OF EXISTING PORCH AT FRONT OF DWELLING WITH NEW WOOD FRAME CANOPY AND RECONSTRUCTION OF FRONT STEPS. NO CHANGE IN OCCUPANCY, USE OR EGRESS.
X00573276-P2
01/06/2023
Special inspection requirement — Concrete - Cast-In-Place
GINO LONGO
01/06/2023
Special inspection requirement — Masonry
GINO LONGO
01/06/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
GINO LONGO
01/06/2023
Special inspection requirement — Subgrade Inspections
GINO LONGO
10/11/2022
Filed — Alteration
APPLICATION HEREWITH FILED TO REPLACE WOOD DECK AT REAR OF DWELLING WITH METAL FRAME DECK AND RENOVATION OF EXISTING PORCH AT FRONT OF DWELLING WITH NEW WOOD FRAME CANOPY AND RECONSTRUCTION OF FRONT STEPS. NO CHANGE IN OCCUPANCY, USE OR EGRESS.
X00573276-P1
06/18/2022
Permit issued — General Construction
X00573276-I1-GC
09/30/2021
Objection raised — Other
09/30/2021
Objection resolved — Addressed
09/30/2021
Objection raised — Other
09/30/2021
Objection resolved — Addressed
09/23/2021
Filed — Alteration
APPLICATION HEREWITH FILED TO REPLACE WOOD DECK AT REAR OF DWELLING WITH METAL FRAME DECK AND RENOVATION OF EXISTING PORCH AT FRONT OF DWELLING WITH NEW WOOD FRAME CANOPY AND RECONSTRUCTION OF FRONT STEPS. NO CHANGE IN OCCUPANCY, USE OR EGRESS.
X00573276-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offTHOMAS M RANERI06/18/2022
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
02/16/2023Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
01/06/2023Concrete - Cast-In-PlaceGINO LONGOspecial
01/06/2023MasonryGINO LONGOspecial
01/06/2023Structural Stability – Alterations of existing buildingsGINO LONGOspecial
01/06/2023Subgrade InspectionsGINO LONGOspecial
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/23/2026X00573276-P1Request digital key ↗
08/23/2026X00573276-P2Request digital key ↗
08/15/2026X00573276-I1Request digital key ↗
▸Seals & Professional Certifications7
▸DOB NOWSpecial Inspector Seal & Signature4
09/02/2026X00573276-P2Open ↗
09/02/2026X00573276-P2Open ↗
09/02/2026X00573276-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/23/2026X00573276-I1Open ↗
08/23/2026X00573276-P1Open ↗
08/13/2026X00573276-P2Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/23/2026X00573276-P1Open ↗
08/15/2026X00573276-I1Open ↗
08/13/2026X00573276-P2Open ↗