← Back
Walk-up cooperative
Glen Oaks Village
254-02 74 AVENUE · Glen Oaks-Floral Park-New Hyde Park · BIN 4460185
💬 Discuss this project
1948Year Built
2Stories
C6Building Class
R3-2Zoning
112,268 sfGross Floor Area
144Units
LL97 CoveredRent Stabilized0 Open Violations
Walk-up cooperative · Owner of record: GLEN OAKS VILLAGE OWNERS INC · 263,000 sf lot · 0.43 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STUDIO SHAMOUN ARCHITECTURE PLLC101/09/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A+ EXPEDITING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
K.A.B. ELECTRIC CORPGeneral Contractor104/09/2026
Building Lifecycle
All (4)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (1)
06/22/2026
Signed off — Alteration
Application filed to renovate the existing 2nd floor - Unit B with modification of non bearing partitions with new finishes as per the plans filed herewith; No change to Use, Egress or Occupancy
Q01326281-I1
01/23/2026
Permit issued — General Construction
Q01326281-I1-GC
01/09/2026
Filed — Alteration
Application filed to renovate the existing 2nd floor - Unit B with modification of non bearing partitions with new finishes as per the plans filed herewith; No change to Use, Egress or Occupancy
Q01326281-I1
12/01/2025
Special inspection requirement — Final
Alan Shamoun
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offK.A.B. ELECTRIC CORP01/23/2026
1 project · most recent 02/10/2026
General Wiring
FiledStatusContractorScope
02/10/2026CompleteK.A.B. ELECTRIC CORPGeneral Wiring
1 project · most recent 01/09/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
01/09/2026Signed-offK.A.B. ELECTRIC CORPTenant Protection Plan 72 Hour
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
12/01/2025FinalAlan Shamounprogress
▾Documents — 4 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/17/2026Q01326281-I1Request digital key ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026Q01326281-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/28/2026Q01326281-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q01326281-I1Open ↗