← Back
Church, synagogue, chapel
254-10 LITTLE NECK PARKWAY
QUEENS · Douglaston-Little Neck · BIN 4171680
💬 Discuss this project
1956Year Built
1Stories
M1Building Class
R1-2Zoning
10,414 sfGross Floor Area
0Units
0 Open ViolationsFDNY Report ↗
Church, synagogue, chapel · 28,800 sf lot · 0.36 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanical
Floor 12p · 2 filings · 8 docs
Basement1p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CHURCH OF JESUS CHRIST OF LATTE2907/08/2026
CHURCH OF JESUS CHRIST103/22/2026
PLAINVIEW NY FM GROUP303/21/2026
CHURCH OF LATTER DAY SAINTS403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MQ CONSULTING703/05/2026
COSTA ARCH & ENG LLP306/20/2023
BLADYKAS ENGINEERING, P.C.103/02/2022
TDM CONSULTING ENGINEER103/01/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW CODE CONSULTING LLC1403/21/2026
COSTA ARCHITECTURE & ENGINEERING LL1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LET ME BUILD, LLCGeneral Contractor507/08/2026
WAWEL PLBG AND HTG CORPPlumbing307/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
METRIC CONSULTING AND INS1803703/05/2026
Building Lifecycle
All (88)Filed (12)Permit Issued (6)Signed Off (3)Violation (34)Inspection (4)Special Inspection (29)
03/17/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
03/13/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/05/2026
Filed — Alteration
Installation of a redundant boiler to only operate if the primary boiler fails
Q01298995-P5
03/05/2026
Special inspection requirement — Heating Systems
SAMI HAJJAR P.E
03/05/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
03/05/2026
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
03/05/2026
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
03/05/2026
Special inspection requirement — Heating Systems
SAMI HAJJAR P.E
03/05/2026
Special inspection requirement — Maintenance information
Kian Moozar
03/05/2026
Special inspection requirement — Permanent certificate
Kian Moozar
03/05/2026
Special inspection requirement — HVAC-R and service water heating system controls
Kian Moozar
03/05/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Kian Moozar
03/05/2026
Special inspection requirement — HVAC-R and service water heating equipment
Kian Moozar
03/04/2026
Filed — Alteration
Installation of a redundant boiler to only operate if the primary boiler fails
Q01298995-P3
03/04/2026
Special inspection requirement — Maintenance information
Kian Moozar
03/04/2026
Special inspection requirement — Heating Systems
SAMI HAJJAR P.E
03/04/2026
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
03/04/2026
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
03/04/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
03/04/2026
Special inspection requirement — Heating Systems
SAMI HAJJAR P.E
03/04/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Kian Moozar
03/04/2026
Special inspection requirement — HVAC-R and service water heating system controls
Kian Moozar
03/04/2026
Special inspection requirement — HVAC-R and service water heating equipment
Kian Moozar
03/04/2026
Special inspection requirement — Permanent certificate
Kian Moozar
02/26/2026
Filed — Alteration
Installation of a redundant boiler to only operate if the primary boiler fails
Q01298995-P2
02/19/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/06/2026
Filed — Alteration
Installation of a redundant boiler to only operate if the primary boiler fails
Q01298995-P1
02/02/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
12/19/2025
Permit issued — Boiler Equipment
Q01298995-S1-BE
12/08/2025
Permit issued — Plumbing
Q01298995-I1-PL
12/08/2025
Permit issued — Boiler Equipment
Q01298995-S2-BE
11/03/2025
Filed — Alteration
Installation of a redundant boiler to only operate if the primary boiler fails
Q01298995-S1
11/01/2025
Filed — Alteration
Installation of a redundant boiler to only operate if the primary boiler fails
Q01298995-S2
10/30/2025
Filed — Alteration
Installation of a redundant boiler to only operate if the primary boiler fails
Q01298995-I1
07/17/2024
Signed off — Alteration
Q00649903-I1
07/16/2024
Signed off — Alteration
Q00651184-I1
11/08/2023
Signed off — Alteration
Q00651622-I1
06/20/2023
Filed — No Work
Q00875864-I1
05/16/2023
Special inspection requirement — Public Assembly Emergency Lighting
ANGELO COSTA
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/06/2023
Filed — No Work
Q00836168-I1
11/04/2022
Permit issued — Structural
Q00651622-I1-ST
04/15/2022
Permit issued — Mechanical Systems
Q00651184-I1-MS
04/15/2022
Permit issued — General Construction
Q00649903-I1-GC
03/02/2022
Filed — Alteration
Q00651184-I1
03/01/2022
Filed — Alteration
Q00651622-I1
02/03/2022
Special inspection requirement — Shutoff dampers
SAMI HAJJAR P.E
02/03/2022
Special inspection requirement — Maintenance information
SAMI HAJJAR P.E
02/03/2022
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
02/03/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
02/03/2022
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
01/11/2022
Filed — Alteration
Q00649903-I1
01/06/2022
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
12/20/2021
Special inspection requirement — Final
SAMI HAJJAR P.E
12/20/2021
Special inspection requirement — Mechanical Systems
SAMI HAJJAR P.E
08/23/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/08/2018
Violation issued (FDNY_ORDER, closed)
01/26/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/21/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/03/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 88 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offWAWEL PLBG AND HTG CORP12/19/2025
DOB NOWPlumbingSigned-offWAWEL PLBG AND HTG CORP12/08/2025
DOB NOWBoiler EquipmentSigned-offWAWEL PLBG AND HTG CORP12/08/2025
DOB NOWStructuralSigned-offLET ME BUILD, LLC11/04/2022
DOB NOWMechanical SystemsSigned-offLET ME BUILD, LLC04/15/2022
DOB NOWGeneral ConstructionSigned-offLET ME BUILD, LLC04/15/2022
BISPLISSUEDGLENNS PLUMBING SVCS INC02/26/2024
BIS—ISSUEDLET ME BUILD, LLC01/19/2024
BISPLISSUEDGLENNS PLUMBING SVCS INC04/04/2018
BISOTISSUEDLET ME BUILD, LLC04/02/2018
BISCCISSUEDTHE SAGE GROUP02/02/1998
BIS—ISSUEDOLCOTT CONST COMPANY INC08/26/1997
BISPLRE-ISSUEDBYPASS MECHANICAL CORP02/25/1997
BISMHISSUEDJ.T. REILLY CONSTRUCTION CO.,INC06/09/1992
BISBLISSUEDCOMMANDER OIL CO11/22/1991
BISOTISSUEDJ.T. REILLY CONSTRUCTION CO.,INC05/28/1991
1 project · most recent 03/05/2026
Gas
FiledStatusContractorScope
03/05/2026Signed-offWAWEL PLBG AND HTG CORPGas
1 project · most recent 08/08/2023
General Wiring
FiledStatusContractorScope
08/08/2023CompleteJANON ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
03/17/2026Pass-Final Boiler Equipment InspectionPassView ↗
03/13/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/19/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/02/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
03/05/2026Heating SystemsSAMI HAJJAR P.Especial
03/05/2026HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
03/05/2026HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
03/05/2026HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
03/05/2026Heating SystemsSAMI HAJJAR P.Especial
03/05/2026Maintenance informationKian Moozarenergy_progress
03/05/2026Permanent certificateKian Moozarenergy_progress
03/05/2026HVAC-R and service water heating system controlsKian Moozarenergy_progress
03/05/2026HVAC-R and service water piping design and insulationKian Moozarenergy_progress
03/05/2026HVAC-R and service water heating equipmentKian Moozarenergy_progress
03/04/2026Maintenance informationKian Moozarenergy_progress
03/04/2026Heating SystemsSAMI HAJJAR P.Especial
03/04/2026HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
03/04/2026HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
03/04/2026HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
03/04/2026Heating SystemsSAMI HAJJAR P.Especial
03/04/2026HVAC-R and service water piping design and insulationKian Moozarenergy_progress
03/04/2026HVAC-R and service water heating system controlsKian Moozarenergy_progress
03/04/2026HVAC-R and service water heating equipmentKian Moozarenergy_progress
03/04/2026Permanent certificateKian Moozarenergy_progress
05/16/2023Public Assembly Emergency LightingANGELO COSTAprogress
02/03/2022Shutoff dampersSAMI HAJJAR P.Eenergy_progress
02/03/2022Maintenance informationSAMI HAJJAR P.Eenergy_progress
02/03/2022HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
02/03/2022HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
Latest 25 of 29.
▾Documents — 146 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch10
08/26/2026Q00649903-I1Request digital key ↗
08/26/2026Q00651622-I1Request digital key ↗
08/26/2026Q00651184-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly2
08/24/2026Q00836168-I1Request digital key ↗
08/24/2026Q00875864-I1Request digital key ↗
▸Applications & Permits29
▸BISPLAN / WORK APPROVAL APPLICATION21
12/03/2024400620912Open ↗
10/07/2024400620912Open ↗
08/22/2024400620912Open ↗
Showing 3 of 21 on file for this type
▸BISWORK PERMIT APPLICATION8
12/26/2025400620912Open ↗
12/26/2025400620912Open ↗
12/01/2025400620912Open ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records2
▸BISVERIFY TAX LOT1
09/25/2023400620912Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
09/25/2024400620912Open ↗
▸Seals & Professional Certifications36
▸DOB NOWProgress Inspector Seal & Signature15
09/23/2026Q01298995-S2Open ↗
09/23/2026Q01298995-S2Open ↗
09/23/2026Q01298995-S2Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/26/2026Q00651622-I1Open ↗
08/24/2026Q00836168-I1Open ↗
08/17/2026Q01298995-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/23/2026Q01298995-S2Open ↗
09/23/2026Q01298995-S1Open ↗
09/23/2026Q00651184-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
02/26/2019421593555Open ↗
02/26/2019421593555Open ↗
04/03/2018421593555Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment4
▸BISSCHEDULE B - PLUMBING2
07/10/2024400620912Open ↗
06/20/2024400620912Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
04/03/2025400620912Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
01/18/2018421593555Open ↗
▸Safety & Tenant Protection1
▸BIS* SHORING 27-10101
09/25/2024400620912Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/26/2026Q00651622-I1Open ↗
08/17/2026Q01298995-P1Open ↗
08/17/2026Q01298995-P2Open ↗
Showing 3 of 10 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/19/2018421593555Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
02/26/2019421593555Open ↗
02/26/2019421593555Open ↗
04/03/2018421593555Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS1
02/26/2019421593555Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00651184-I1Open ↗
▸Inspections & Test Reports4
▸BIS* CONCRETE 27-6031
09/25/2024400620912Open ↗
▸BIS* WELDING 27-6161
09/25/2024400620912Open ↗
▸BIS* STRUCTURAL STABILITY 1 RCNY:16-011
09/25/2024400620912Open ↗
▸BIS* DRYWELL INST RET/DET : TR1-DRYWELL RS16-P110.131
09/25/2024400620912Open ↗
▸Approvals, Objections & Sign-offs27
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter12
08/26/2026Q00651622-I1Open ↗
08/13/2026Q01298995-P2Open ↗
08/13/2026Q01298995-I1Open ↗
Showing 3 of 12 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
12/01/2025400620912Open ↗
12/01/2025400620912Open ↗
12/01/2025400620912Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
08/02/2023400620912Open ↗
06/22/2023400620912Open ↗
06/08/2023400620912Open ↗
Showing 3 of 4 on file for this type
▸BISSUPERSEDING LETTER4
12/26/2025400620912Open ↗
12/01/2025400620912Open ↗
12/01/2025400620912Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
02/26/2019421593555Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
02/26/2019421593555Open ↗
01/18/2018421593555Open ↗
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION4
10/11/2023400620912Open ↗
04/18/2023400620912Open ↗
04/13/2023400620912Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET1
01/18/2018421593555Open ↗
▸Other Documents7
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION3
12/26/2025400620912Open ↗
12/01/2025400620912Open ↗
12/01/2025400620912Open ↗
▸BIS* FIRE STOPS 27-3451
09/25/2024400620912Open ↗
▸BIS* VENT. SYS.-ENGINEER/INSTALLER 27-136,7791
09/25/2024400620912Open ↗
▸BIS* * VENTILATION / AIR CONDITIONING1
09/25/2024400620912Open ↗
▸BIS* * SUBGRADE 27-723,DIRC 15/711
09/25/2024400620912Open ↗