← Back
BuildNYC
Church, synagogue, chapel
The Church of Jesus Christ of Latter-Day Saints
254-10 BATES ROAD · Name © OpenStreetMap contributors · BIN 4171680
💬 Discuss this project
1956Year Built
1Stories
M1Building Class
R1-2Zoning
10,414 sfGross Floor Area
0Units
0 Active ViolationsFDNY Report ↗
Church, synagogue, chapel · 28,800 sf lot · 0.36 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
AtticThe Church of Jesus Christ of Latter-day Saints12p · 3 filings · 13 docs
Floor 1The Church of Jesus Christ of Latter-day Saints20p · 5 filings · 15 docs
BasementThe Church of Jesus Christ of Latte, The Church of Jesus Chr9p · 2 filings · 20 docs
Sub-BasementThe Church of Jesus Christ of Latte, The Church of Jesus Chr40p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
The Church of Jesus Christ of Latte3307/08/2026
Plainview NY FM Group303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MQ Consulting703/05/2026
Costa Arch & Engineering306/20/2023
Bladykas Engineering103/02/2022
TDM Consulting Engineering103/01/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
New Code Consulting1403/21/2026
Costa1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Let Me BuildGeneral Contractor507/08/2026
Wawel Plumbing and HeatingPlumbing307/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Metric Consulting and Ins1803703/05/2026
Building Lifecycle
All (89)Filed (12)Permit Issued (6)Signed Off (4)Violation (34)Inspection (4)Special Inspection (29)
09/16/2026
Signed off — Alteration
Installation of a redundant boiler to only operate if the primary boiler fails
Q01298995-I1
03/17/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
03/13/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/05/2026
Filed — Alteration
Installation of a redundant boiler to only operate if the primary boiler fails
Q01298995-P5
03/05/2026
Special inspection requirement — Heating Systems
SAMI HAJJAR P.E
03/05/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
03/05/2026
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
03/05/2026
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
03/05/2026
Special inspection requirement — Heating Systems
SAMI HAJJAR P.E
03/05/2026
Special inspection requirement — Maintenance information
Kian Moozar
03/05/2026
Special inspection requirement — Permanent certificate
Kian Moozar
03/05/2026
Special inspection requirement — HVAC-R and service water heating system controls
Kian Moozar
03/05/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Kian Moozar
03/05/2026
Special inspection requirement — HVAC-R and service water heating equipment
Kian Moozar
03/04/2026
Filed — Alteration
Installation of a redundant boiler to only operate if the primary boiler fails
Q01298995-P3
03/04/2026
Special inspection requirement — Maintenance information
Kian Moozar
03/04/2026
Special inspection requirement — Heating Systems
SAMI HAJJAR P.E
03/04/2026
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
03/04/2026
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
03/04/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
03/04/2026
Special inspection requirement — Heating Systems
SAMI HAJJAR P.E
03/04/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Kian Moozar
03/04/2026
Special inspection requirement — HVAC-R and service water heating system controls
Kian Moozar
03/04/2026
Special inspection requirement — HVAC-R and service water heating equipment
Kian Moozar
03/04/2026
Special inspection requirement — Permanent certificate
Kian Moozar
02/26/2026
Filed — Alteration
Installation of a redundant boiler to only operate if the primary boiler fails
Q01298995-P2
02/19/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/06/2026
Filed — Alteration
Installation of a redundant boiler to only operate if the primary boiler fails
Q01298995-P1
02/02/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
12/19/2025
Permit issued — Boiler Equipment
Q01298995-S1-BE
12/08/2025
Permit issued — Plumbing
Q01298995-I1-PL
12/08/2025
Permit issued — Boiler Equipment
Q01298995-S2-BE
11/03/2025
Filed — Alteration
Installation of a redundant boiler to only operate if the primary boiler fails
Q01298995-S1
11/01/2025
Filed — Alteration
Installation of a redundant boiler to only operate if the primary boiler fails
Q01298995-S2
10/30/2025
Filed — Alteration
Installation of a redundant boiler to only operate if the primary boiler fails
Q01298995-I1
07/17/2024
Signed off — Alteration
Q00649903-I1
07/16/2024
Signed off — Alteration
Q00651184-I1
11/08/2023
Signed off — Alteration
Q00651622-I1
06/20/2023
Filed — No Work
Q00875864-I1
05/16/2023
Special inspection requirement — Public Assembly Emergency Lighting
ANGELO COSTA
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/06/2023
Filed — No Work
Q00836168-I1
11/04/2022
Permit issued — Structural
Q00651622-I1-ST
04/15/2022
Permit issued — Mechanical Systems
Q00651184-I1-MS
04/15/2022
Permit issued — General Construction
Q00649903-I1-GC
03/02/2022
Filed — Alteration
Q00651184-I1
03/01/2022
Filed — Alteration
Q00651622-I1
02/03/2022
Special inspection requirement — Shutoff dampers
SAMI HAJJAR P.E
02/03/2022
Special inspection requirement — Maintenance information
SAMI HAJJAR P.E
02/03/2022
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
02/03/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
02/03/2022
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
01/11/2022
Filed — Alteration
Q00649903-I1
01/06/2022
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
12/20/2021
Special inspection requirement — Final
SAMI HAJJAR P.E
12/20/2021
Special inspection requirement — Mechanical Systems
SAMI HAJJAR P.E
08/23/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/08/2018
Violation issued (FDNY_ORDER, closed)
01/26/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/21/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 89 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offWawel Plumbing and Heating12/19/2025
DOB NOWPlumbingSigned-offWawel Plumbing and Heating12/08/2025
DOB NOWBoiler EquipmentSigned-offWawel Plumbing and Heating12/08/2025
DOB NOWStructuralSigned-offLet Me Build11/04/2022
DOB NOWMechanical SystemsSigned-offLet Me Build04/15/2022
DOB NOWGeneral ConstructionSigned-offLet Me Build04/15/2022
BISPLISSUEDGlenns Plumbing Services02/26/2024
BIS—ISSUEDLet Me Build01/19/2024
BISPLISSUEDGlenns Plumbing Services04/04/2018
BISOTISSUEDLet Me Build04/02/2018
BISCCISSUEDThe Sage Group02/02/1998
BIS—ISSUEDOlcott Construction Company08/26/1997
BISPLRE-ISSUEDBypass Mechanical02/25/1997
BISMHISSUEDJ.T. Reilly Construction Co06/09/1992
BISBLISSUEDCommander Oil Co11/22/1991
BISOTISSUEDJ.T. Reilly Construction Co05/28/1991
1 project · most recent 03/05/2026
Gas
FiledStatusContractorScope
03/05/2026Signed-offWawel Plumbing and HeatingGas
2 projects · most recent 10/05/2026
General Wiring
FiledStatusContractorScope
10/05/2026CompleteDally Electrical Contracting—
08/08/2023CompleteJanon ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
03/17/2026Pass-Final Boiler Equipment InspectionPassView ↗
03/13/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/19/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/02/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
03/05/2026Heating SystemsSAMI HAJJAR P.Especial
03/05/2026HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
03/05/2026HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
03/05/2026HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
03/05/2026Heating SystemsSAMI HAJJAR P.Especial
03/05/2026Maintenance informationKian Moozarenergy_progress
03/05/2026Permanent certificateKian Moozarenergy_progress
03/05/2026HVAC-R and service water heating system controlsKian Moozarenergy_progress
03/05/2026HVAC-R and service water piping design and insulationKian Moozarenergy_progress
03/05/2026HVAC-R and service water heating equipmentKian Moozarenergy_progress
03/04/2026Maintenance informationKian Moozarenergy_progress
03/04/2026Heating SystemsSAMI HAJJAR P.Especial
03/04/2026HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
03/04/2026HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
03/04/2026HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
03/04/2026Heating SystemsSAMI HAJJAR P.Especial
03/04/2026HVAC-R and service water piping design and insulationKian Moozarenergy_progress
03/04/2026HVAC-R and service water heating system controlsKian Moozarenergy_progress
03/04/2026HVAC-R and service water heating equipmentKian Moozarenergy_progress
03/04/2026Permanent certificateKian Moozarenergy_progress
05/16/2023Public Assembly Emergency LightingANGELO COSTAprogress
02/03/2022Shutoff dampersSAMI HAJJAR P.Eenergy_progress
02/03/2022Maintenance informationSAMI HAJJAR P.Eenergy_progress
02/03/2022HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
02/03/2022HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
Latest 25 of 29.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
The Church of Jesus Christ of LatteReligiousSub-basement
Project Q01298995 Alteration · Permit Entire · 10/30/2025
The Church of Jesus Christ of Latter-day SaintsReligiousSub-basement, Floor 1
Project Q00651184 Alteration · LOC Issued · 03/02/2022
Project Q00651622 Alteration · LOC Issued · 03/01/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 146 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch10
08/26/2026Q00649903-I1Request digital key ↗
08/26/2026Q00651622-I1Request digital key ↗
08/26/2026Q00651184-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly2
08/24/2026Q00836168-I1Request digital key ↗
08/24/2026Q00875864-I1Request digital key ↗
▸Applications & Permits29
▸BISPLAN / WORK APPROVAL APPLICATION21
12/03/2024400620912Open ↗
10/07/2024400620912Open ↗
08/22/2024400620912Open ↗
Showing 3 of 21 on file for this type
▸BISWORK PERMIT APPLICATION8
12/26/2025400620912Open ↗
12/26/2025400620912Open ↗
12/01/2025400620912Open ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records2
▸BISVERIFY TAX LOT1
09/25/2023400620912Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
09/25/2024400620912Open ↗
▸Seals & Professional Certifications36
▸DOB NOWProgress Inspector Seal & Signature15
09/23/2026Q01298995-S2Open ↗
09/23/2026Q01298995-S2Open ↗
09/23/2026Q01298995-S2Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/26/2026Q00651622-I1Open ↗
08/24/2026Q00836168-I1Open ↗
08/17/2026Q01298995-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/23/2026Q01298995-S2Open ↗
09/23/2026Q01298995-S1Open ↗
09/23/2026Q00651184-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
02/26/2019421593555Open ↗
02/26/2019421593555Open ↗
04/03/2018421593555Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment4
▸BISSCHEDULE B - PLUMBING2
07/10/2024400620912Open ↗
06/20/2024400620912Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
04/03/2025400620912Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
01/18/2018421593555Open ↗
▸Safety & Tenant Protection1
▸BIS* SHORING 27-10101
09/25/2024400620912Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/26/2026Q00651622-I1Open ↗
08/17/2026Q01298995-P1Open ↗
08/17/2026Q01298995-P2Open ↗
Showing 3 of 10 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/19/2018421593555Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
02/26/2019421593555Open ↗
02/26/2019421593555Open ↗
04/03/2018421593555Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS1
02/26/2019421593555Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00651184-I1Open ↗
▸Inspections & Test Reports4
▸BIS* CONCRETE 27-6031
09/25/2024400620912Open ↗
▸BIS* WELDING 27-6161
09/25/2024400620912Open ↗
▸BIS* STRUCTURAL STABILITY 1 RCNY:16-011
09/25/2024400620912Open ↗
▸BIS* DRYWELL INST RET/DET : TR1-DRYWELL RS16-P110.131
09/25/2024400620912Open ↗
▸Approvals, Objections & Sign-offs27
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter12
08/26/2026Q00651622-I1Open ↗
08/13/2026Q01298995-P2Open ↗
08/13/2026Q01298995-I1Open ↗
Showing 3 of 12 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
12/01/2025400620912Open ↗
12/01/2025400620912Open ↗
12/01/2025400620912Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
08/02/2023400620912Open ↗
06/22/2023400620912Open ↗
06/08/2023400620912Open ↗
Showing 3 of 4 on file for this type
▸BISSUPERSEDING LETTER4
12/26/2025400620912Open ↗
12/01/2025400620912Open ↗
12/01/2025400620912Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
02/26/2019421593555Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
02/26/2019421593555Open ↗
01/18/2018421593555Open ↗
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION4
10/11/2023400620912Open ↗
04/18/2023400620912Open ↗
04/13/2023400620912Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET1
01/18/2018421593555Open ↗
▸Other Documents7
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION3
12/26/2025400620912Open ↗
12/01/2025400620912Open ↗
12/01/2025400620912Open ↗
▸BIS* FIRE STOPS 27-3451
09/25/2024400620912Open ↗
▸BIS* VENT. SYS.-ENGINEER/INSTALLER 27-136,7791
09/25/2024400620912Open ↗
▸BIS* * VENTILATION / AIR CONDITIONING1
09/25/2024400620912Open ↗
▸BIS* * SUBGRADE 27-723,DIRC 15/711
09/25/2024400620912Open ↗