← Back
Shopping center, with or without parking
Little Neck Plaza
254-21 NASSAU BOULEVARD · BIN 4171502
💬 Discuss this project
1956Year Built
1Stories
K6Building Class
R3-2Zoning
45,440 sfGross Floor Area
21Units
LL97 Covered1 Open Violation ▸FDNY Report ↗
Shopping center, with or without parking · Owner of record: BKS REALTY INC · 137,286 sf lot · 0.33 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
Roof18p · 6 filings · 20 docs
Floor 1Under Construction84p · 10 filings · 20 docs
CellarUnder Construction58p · 6 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GDV CORP / DBA CENTRE PIZZA1307/08/2026
WALL REALTY 1017-10206207/08/2026
UNITED HEALTH GROUP507/08/2026
KIMCO REALTY3704/09/2026
LITTLE NECK RX CORP503/22/2026
BKS REALTY803/22/2026
L AND S SIGN CO103/22/2026
WALL REALTY9103/22/2026
VISIONARY PROPERTIES403/21/2026
FIRST NATIONAL BANK OF LI103/21/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
FC CONSULTING ENGINEER803/21/2026
THINK DESIGN ARCHITECTURE303/21/2026
ZHENG & ASSOCIATES LLC1203/21/2026
CAVALRY803/21/2026
INDESIGN STUDIO603/21/2026
BUILDING BROTHERS203/21/2026
LOUIS STRIAR803/21/2026
MUNICIPAL BUILDING CONSULTANTS103/21/2026
EMPIRE CITY CONSULTANTS, INC.203/21/2026
MALKYSTEINWURZEL103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RIDEGELINE GROUP INCGeneral Contractor603/21/2026
CARUSO CONTRACTING LLCGeneral Contractor507/08/2026
JOHN EVAN CONTRACTING CORGeneral Contractor303/21/2026
NEPTUNE SIGNS AWNINGSScaffold307/08/2026
BERKS CONSTRUCTION GROUPGeneral Contractor207/08/2026
VIACON,INCGeneral Contractor209/07/2026
LEODIS, JIMMYElectrical203/21/2026
CAPITOL DESIGN MAINT INScaffold207/08/2026
PIECE MANAGEMENT INCGeneral Contractor203/21/2026
APPROVED FIRE PREV. CORPFire Protection207/08/2026
ALPHONSE, MICHAELElectrical203/21/2026
PEREIRA, WESLLEYElectrical203/21/2026
WANERKA, JOHNElectrical203/21/2026
AAA TOTAL PLUMBING, INCPlumbing107/08/2026
FLINT MECHANICAL CORPPlumbing106/28/2026
HYDRO MECHANICAL INCPlumbing107/08/2026
MACCARONE PLUMBING INCPlumbing108/26/2026
METROCITY GROUP,INCPlumbing107/08/2026
MMI PLUMBING & HEATING INC.Plumbing106/17/2026
TRI STATE PLBG & HTG INCPlumbing108/16/2026
GOING SIGN SVCNGScaffold106/28/2026
R G M SIGNSScaffold107/08/2026
ALBERTSON ELECTRIC, INCElectrical103/22/2026
ULTIMATE SIGNS DESIGNSScaffold107/08/2026
ANGELO DOMINGUEZElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JAMES J. LEONARD ARCHITEC3907308/12/2026
WHITESTONE ASSOCIATES ENG8144508/04/2026
FC CONSULTING ENGINEER,PL1958201/20/2026
M. INT'L ENGINEERING PLLC3129305/22/2024
A. GIANNOPOULOS ARCHITECT2196105/14/2024
THINK DESIGN ARCHITECTURA683304/03/2023
SUPERIOR - HOME INSPECTIO1804107/01/2022
ZHENG & ASSOCIATES LLC7330601/18/2021
AR-TECH ENGINEERING, P.C.6659101/15/2020
Building Lifecycle
All (201)Filed (46)Permit Issued (35)Signed Off (16)Violation (28)Inspection (24)Objection (22)Special Inspection (30)
09/18/2026
Objection resolved — Resolved
09/18/2026
Objection resolved — Resolved
09/18/2026
Objection resolved — Resolved
09/18/2026
Objection resolved — Resolved
09/09/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/04/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/04/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/25/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
08/20/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/20/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/18/2026
Permit issued — Mechanical Systems
Q01364072-S3-MS
08/13/2026
Permit issued — Sprinklers
Q01364072-S2-EW-SP
08/13/2026
Objection raised — Other
08/13/2026
Objection raised — Other
08/13/2026
Objection raised — Other
08/13/2026
Objection raised — Cost
08/12/2026
Filed — Alteration
renovation/ tenant buildout of an existing eating and drinking establishment.
Q01343429-S2
08/12/2026
Permit issued — General Construction
Q01364072-I1-GC
08/12/2026
Permit issued — Plumbing
Q01364072-S1-PL
08/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES LEONARD
08/04/2026
Filed — Alteration
Filing herewith Sprinkler plans for sprinkler work and finishes associated with the interior fit out of Four Leaf Federal Credit Union. No change to use, egress, or occupancy
Q01364072-S3
08/03/2026
Filed — Alteration
Filing herewith Sprinkler plans for sprinkler work and finishes associated with the interior fit out of Four Leaf Federal Credit Union. No change to use, egress, or occupancy
Q01364072-S1
08/03/2026
Filed — Alteration
Filing herewith Sprinkler plans for sprinkler work and finishes associated with the interior fit out of Four Leaf Federal Credit Union. No change to use, egress, or occupancy
Q01364072-I1
08/03/2026
Filed — Alteration
Filing herewith Sprinkler plans for sprinkler work and finishes associated with the interior fit out of Four Leaf Federal Credit Union. No change to use, egress, or occupancy
Q01364072-S2
07/31/2026
Objection raised — Other
07/31/2026
Objection resolved — Resolved
07/31/2026
Objection raised — Other
07/31/2026
Objection resolved — Resolved
07/30/2026
Filed — Alteration
Minor plumbing work
Q01432629-S1
07/28/2026
Filed — Alteration
Minor plumbing work
Q01432629-I1
07/28/2026
Special inspection requirement — Maintenance information
ANASTASIOS GIANNOPOULOS
07/27/2026
Special inspection requirement — Lighting controls
Mudar Khantamr
07/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mudar Khantamr
07/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mudar Khantamr
07/20/2026
Permit issued — Plumbing
Q01343429-S1-PL
07/17/2026
Special inspection requirement — Lighting controls
ANASTASIOS GIANNOPOULOS
07/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/17/2026
Special inspection requirement — Interior lighting power
ANASTASIOS GIANNOPOULOS
07/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/17/2026
Special inspection requirement — Final
07/17/2026
Special inspection requirement — Mechanical Systems
07/08/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Mudar Khantamr
07/08/2026
Special inspection requirement — HVAC-R and service water heating equipment
Mudar Khantamr
07/08/2026
Special inspection requirement — HVAC-R and service water heating system controls
Mudar Khantamr
07/08/2026
Special inspection requirement — Duct leakage testing, insulation and design
Mudar Khantamr
07/08/2026
Special inspection requirement — Ventilation and air distribution system
Mudar Khantamr
07/02/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/17/2026
Filed — Alteration
Propose to remove interior non-bearing partition and install new demising wall all as per plans filed herewith. AKA 254-61 Nassau Blvd Tenant spaces A and B. No change in use egress or occupancy is proposed under this application.
Q01373023-S3
06/16/2026
Permit issued — General Construction
Q01343429-I1-GC-CX
06/15/2026
Permit issued — Plumbing
Q01373023-S1-PL
06/11/2026
Inspection — Fail-Final Boiler Equipment Inspection
Fail
View inspection ↗
05/18/2026
Permit issued — General Construction
Q01169616-I1-GC
05/06/2026
Permit issued — Sign
Q01343635-I1-SG
05/01/2026
Filed — Alteration
Q01343636-I1
05/01/2026
Filed — Alteration
Q01343635-I1
04/28/2026
Special inspection requirement — Sprinkler Systems
JAMES LEONARD
04/27/2026
Permit issued — Mechanical Systems
Q01373023-S2-MS
04/27/2026
Permit issued — General Construction
Q01373023-I1-GC
04/17/2026
Filed — Alteration
Propose to remove interior non-bearing partition and install new demising wall all as per plans filed herewith. AKA 254-61 Nassau Blvd Tenant spaces A and B. No change in use egress or occupancy is proposed under this application.
Q01373023-S2
04/17/2026
Filed — Alteration
Propose to remove interior non-bearing partition and install new demising wall all as per plans filed herewith. AKA 254-61 Nassau Blvd Tenant spaces A and B. No change in use egress or occupancy is proposed under this application.
Q01373023-I1
Latest 60 of 201 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedVIACON,INC08/18/2026
DOB NOWSprinklersPermit IssuedENCORE FIRE PROT SVS INC08/13/2026
DOB NOWGeneral ConstructionPermit IssuedVIACON,INC08/12/2026
DOB NOWPlumbingPermit IssuedMACCARONE PLUMBING INC08/12/2026
DOB NOWPlumbingPermit IssuedTRI STATE PLBG & HTG INC07/20/2026
DOB NOWGeneral ConstructionPermit IssuedA&A PRO GENERAL CONTR06/16/2026
DOB NOWPlumbingPermit IssuedMMI PLUMBING & HEATING INC.06/15/2026
DOB NOWGeneral ConstructionPermit IssuedCARUSO CONTRACTING LLC05/18/2026
DOB NOWSignPermit IssuedGOING SIGN & SVCNG CO,INC05/06/2026
DOB NOWMechanical SystemsPermit IssuedBERKS CONSTRUCTION GROUP04/27/2026
DOB NOWGeneral ConstructionPermit IssuedBERKS CONSTRUCTION GROUP04/27/2026
DOB NOWMechanical SystemsSigned-offCARUSO CONTRACTING LLC01/21/2026
DOB NOWSprinklersPermit IssuedBLETSAS P&H CORP06/12/2025
DOB NOWGeneral ConstructionPermit IssuedCARUSO CONTRACTING LLC05/29/2025
DOB NOWPlumbingPermit IssuedFLINT MECHANICAL CORP05/08/2025
DOB NOWGeneral ConstructionPermit IssuedCARUSO CONTRACTING LLC03/01/2025
DOB NOWMechanical SystemsSigned-offJOHN EVAN CONTRACTING COR06/20/2024
DOB NOWSprinklersSigned-offAPPROVED FIRE PREV. CORP03/07/2024
DOB NOWSignSigned-offCAPITOL DESIGN & MAINT IN08/08/2023
DOB NOWSignSigned-offCAPITOL DESIGN & MAINT IN08/08/2023
DOB NOWSignSigned-offULTIMATE SIGNS&DESIGNS CO07/22/2023
DOB NOWPlumbingSigned-offMETROCITY GROUP,INC05/02/2023
DOB NOWMechanical SystemsSigned-offRIDEGELINE GROUP INC04/20/2023
DOB NOWGeneral ConstructionSigned-offRIDEGELINE GROUP INC04/19/2023
DOB NOWPlumbingSigned-offHYDRO MECHANICAL INC09/03/2022
DOB NOWGeneral ConstructionSigned-offPIECE MANAGEMENT INC09/01/2022
DOB NOWMechanical SystemsPermit IssuedAIRTEMP MECHANICAL SERVIC08/05/2022
DOB NOWSignSigned-offDESTHERS, JOSEPH07/12/2021
DOB NOWSignSigned-offNEPTUNE SIGNS&AWNINGS INC01/27/2021
DOB NOWSignSigned-offNEPTUNE SIGNS&AWNINGS INC01/27/2021
DOB NOWMechanical SystemsSigned-offGOODWILL MECHANICAL01/15/2021
DOB NOWSprinklersSigned-offAPPROVED FIRE PREV. CORP08/19/2020
DOB NOWSprinklersSigned-offAAA TOTAL PLUMBING, INC08/17/2020
DOB NOWMechanical SystemsSigned-offCAVALRY LLC01/28/2020
DOB NOWSignSigned-offR.G.M. SIGNS INC12/04/2018
BIS—ISSUEDCAVALRY LLC09/22/2020
BISOTISSUEDGOOD-WILL MECHANICAL CORP.08/17/2020
BISPLISSUEDBRANCH PLUMBING LLC12/06/2018
BISMHISSUEDCLOVER MECHANICAL INC11/15/2018
BISPLISSUEDAL PLUMBING & CONT. INC10/11/2018
+ 45 more permits on file
5 jobs · most recent 08/12/2026
Air Conditioning Systems Ventilation Systems Heating and Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
08/12/2026Permit IssuedA&A PRO GENERAL CONTRAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Lennox Model 'L' model no. LGM060U5PB1Y 60,000 BTU · Rooftop Unit ×2
Model 'L' model no. LGM120U5EH3Y 117,500 BTU · Rooftop Unit ×2
Heating
Lennox Model 'L' model no. LGM060U5PB1Y 150,000 BTU · Rooftop Unit ×2
Model 'L', model no. LGM120U5EH3Y 240,000 BTU · Rooftop Unit ×2
Ventilation
Lennox Model 'L' model no. LGM060U5PB1Y 1,850 CFM · Rooftop Unit ×2
Model 'L' model no. LGM120U5EH3Y 3,600 CFM · Rooftop Unit ×2
08/04/2026Permit IssuedVIACON,INCVentilation Systems
Ventilation
Broan Broan AE50 50 CFM · Exhaust Fan ×3
07/30/2026——Air Conditioning Systems
Cooling
Johnson Controls KJ090N18R2AAAAA1A1 8 tons ×1
06/17/2026Permit IssuedBERKS CONSTRUCTION GROUPHeating and Air Conditioning Systems
Heat / Cool
Trane YHK1203S0MF0B0AIB000C0000 10 BTU · Rooftop Unit ×2
01/20/2026Signed-offCARUSO CONTRACTING LLCHeating and Air Conditioning Systems
Heat / Cool
Rheem RGEDZT090ACG15BAA 90,000 BTU · Rooftop Unit ×1
RGEDZT120ACG22BAA 10 tons · Rooftop Unit ×1
3 jobs · most recent 08/12/2026
Sprinkler System
FiledStatusContractorScope
08/12/2026——Sprinkler System
08/04/2026Permit IssuedENCORE FIRE PROT SVS INC29 heads
05/22/2024Signed-offAPPROVED FIRE PREV. CORP—
6 jobs · most recent 08/12/2026
Water/Sanitary Gas Storm
FiledStatusContractorScope
08/12/2026Permit IssuedTRI STATE PLBG & HTG INCGas, Water/Sanitary
08/04/2026Permit IssuedMACCARONE PLUMBING INCWater/Sanitary
07/30/2026——Gas, Water/Sanitary
06/17/2026Permit IssuedMMI PLUMBING & HEATING INGas, Water/Sanitary
08/12/2025Permit IssuedFLINT MECHANICAL CORPGas, Water/Sanitary
05/05/2021——Gas, Storm, Water/Sanitary
9 jobs · most recent 08/12/2026
General Wiring
FiledStatusContractorScope
08/12/2026Permit IssuedH. & L. ELECTRIC INCGeneral Wiring
07/20/2026Permit IssuedMENNELLA ELECTRIC, INC.1 meters, 1 new_meters
07/09/2026Permit IssuedGALAXY ELECTRIC CORPGeneral Wiring
11/13/2023Permit IssuedULTIMATE SIGNS & ELEC COR—
07/18/2023Permit IssuedALBERTSON ELECTRIC, INCGeneral Wiring
08/06/2021CompleteASKO ELEC CONST & MAIN IN—
05/25/2021CompleteLENS ELECTRIC, INCGeneral Wiring
02/25/2021CompleteHV ELECTRIC CORPGeneral Wiring
09/17/2018CompletePAUL VERARDI—
1 job · most recent 06/17/2026
Steel
FiledStatusContractorScope
06/17/2026Permit IssuedMMI PLUMBING & HEATING INSteel
▾Field Inspections (DOB CAP) — 24
DateTypeResultReport
09/09/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/04/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/04/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/25/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/20/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/20/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/02/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/11/2026Fail-Final Boiler Equipment InspectionFailView ↗
11/14/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/08/2025Fail-Final General Construction Non-Directive 14FailView ↗
07/30/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/17/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/13/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/23/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/23/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/03/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/28/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/16/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/14/2023Pass-Final General Construction Non-Directive 14PassView ↗
07/13/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/12/2023Fail-Final General Construction Non-Directive 14FailView ↗
05/12/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/04/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/21/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 109
DateRequirementInspectorRole
08/11/2026Fire-Resistant Penetrations and JointsJAMES LEONARDspecial
07/28/2026Maintenance informationANASTASIOS GIANNOPOULOSenergy_progress
07/27/2026Lighting controlsMudar Khantamrenergy_progress
07/27/2026Fire-Resistant Penetrations and JointsMudar Khantamrspecial
07/21/2026Fire-Resistant Penetrations and JointsMudar Khantamrspecial
07/17/2026Lighting controlsANASTASIOS GIANNOPOULOSenergy_progress
07/17/2026Mechanical Systems—special
07/17/2026Fire-Resistant Penetrations and Joints—special
07/17/2026Fire-Resistant Penetrations and Joints—special
07/17/2026Final—progress
07/17/2026Interior lighting powerANASTASIOS GIANNOPOULOSenergy_progress
07/08/2026HVAC-R and service water heating equipmentMudar Khantamrenergy_progress
07/08/2026HVAC-R and service water piping design and insulationMudar Khantamrenergy_progress
07/08/2026HVAC-R and service water heating system controlsMudar Khantamrenergy_progress
07/08/2026Ventilation and air distribution systemMudar Khantamrenergy_progress
07/08/2026Duct leakage testing, insulation and designMudar Khantamrenergy_progress
04/28/2026Sprinkler SystemsJAMES LEONARDspecial
04/16/2026Concrete - Cast-In-PlaceMudar Khantamrspecial
04/15/2026Interior lighting powerMudar Khantamrenergy_progress
04/15/2026Energy Code Compliance InspectionsMudar Khantamrprogress
04/15/2026Fire-Resistant Penetrations and JointsMudar Khantamrspecial
04/15/2026Lighting controlsMudar Khantamrenergy_progress
03/27/2026HVAC-R and service water heating system controlsMudar Khantamrenergy_progress
03/27/2026HVAC-R and service water heating equipmentMudar Khantamrenergy_progress
03/27/2026Energy Code Compliance InspectionsMudar Khantamrprogress
Latest 25 of 109.
▾Documents — 1,442 on file (BIS + DOB NOW)
▸Plans & Drawings50
▸DOB NOWPlans/Sketch33
08/28/2026Q00078339-I1Request digital key ↗
08/27/2026Q00514501-I1Request digital key ↗
08/27/2026Q00541429-I1Request digital key ↗
Showing 3 of 33 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler8
08/27/2026Q00378570-I1Request digital key ↗
08/22/2026Q00419317-P1Request digital key ↗
08/22/2026Q00419317-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Plumbing5
08/27/2026Q00378570-I1Request digital key ↗
08/15/2026Q00378570-P7Request digital key ↗
08/15/2026Q00378570-P6Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sign2
08/27/2026Q00443759-I1Request digital key ↗
08/27/2026Q00443744-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/28/2026Q00293744-I1Request digital key ↗
08/27/2026Q00378627-I1Request digital key ↗
▸Applications & Permits284
▸BISPLAN / WORK APPROVAL APPLICATION165
11/16/2022410016263Open ↗
11/01/2022410016263Open ↗
10/11/2022410016263Open ↗
Showing 3 of 165 on file for this type
▸BISWORK PERMIT APPLICATION110
09/22/2020421799290Open ↗
08/17/2020440613329Open ↗
12/19/2018421696908Open ↗
Showing 3 of 110 on file for this type
▸BISPLACE OF ASSEMBLY4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
05/21/2021421799290Open ↗
Showing 1 of 2 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications2
08/03/2018401127712Open ↗
Showing 1 of 2 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
04/22/2020421799290Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISVERIFY TAX LOT1
02/02/2021421799290Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
08/28/2020421799290Open ↗
▸Seals & Professional Certifications359
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION167
05/15/2019420058136Open ↗
05/10/2019420058136Open ↗
04/10/2019421026534Open ↗
Showing 3 of 167 on file for this type
▸DOB NOWProgress Inspector Seal & Signature53
09/23/2026Q01187770-I1Open ↗
09/23/2026Q01187770-I1Open ↗
09/01/2026Q01169616-I1Open ↗
Showing 3 of 53 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature45
08/28/2026Q00078339-I1Open ↗
08/27/2026Q00378570-P1Open ↗
08/27/2026Q00378570-P6Open ↗
Showing 3 of 45 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST26
11/28/2018421696908Open ↗
03/15/2018421427575Open ↗
Showing 2 of 26 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature24
09/23/2026Q01187770-I1Open ↗
09/01/2026Q00419317-P1Open ↗
09/01/2026Q00419317-P1Open ↗
Showing 3 of 24 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT19
08/12/2020440613329Open ↗
11/28/2018421696908Open ↗
Showing 2 of 19 on file for this type
▸BISPC FULL REPORT11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
08/12/2020440613329Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
08/12/2020440613329Open ↗
Showing 1 of 2 on file for this type
▸Trade Schedules & Equipment157
▸BISSELF-CERT PLUMBING NOTICE52
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 52 on file for this type
▸BISSCHEDULE B - PLUMBING31
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 31 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT23
06/13/2019420200543Open ↗
02/07/2019420200543Open ↗
12/17/2018421194987Open ↗
Showing 3 of 23 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE22
09/16/2022410016263Open ↗
11/28/2018421696908Open ↗
06/07/2018401127712Open ↗
Showing 3 of 22 on file for this type
▸BISEQUIPMENT USE PERMITS18
06/13/2019420200543Open ↗
03/12/2019420200543Open ↗
12/17/2018421194987Open ↗
Showing 3 of 18 on file for this type
▸BISSPRINKLER INSP REPORT : FP-855
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA3
07/19/2019420491667Open ↗
Showing 1 of 3 on file for this type
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL2
12/01/2018421073028Open ↗
Showing 1 of 2 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection5
▸BISSTREET TREE CHECKLIST4
02/07/2020421799290Open ↗
Showing 1 of 4 on file for this type
▸DOB NOWTenant Protection Plan1
08/13/2026Q00293744-I1Open ↗
▸Environmental & Asbestos89
▸DOB NOWDEP ACP-5: Asbestos Assessment Report30
08/28/2026Q00078339-I1Open ↗
08/27/2026Q00378570-P2Open ↗
08/27/2026Q00378570-P1Open ↗
Showing 3 of 30 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'22
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 22 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)21
08/12/2020440613329Open ↗
11/28/2018421696908Open ↗
Showing 2 of 21 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance68
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS36
11/28/2018421696908Open ↗
11/28/2018421696908Open ↗
11/23/2018421194987Open ↗
Showing 3 of 36 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS13
05/06/2021440613329Open ↗
05/03/2021440613329Open ↗
11/23/2018421194987Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: ENERGY8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
08/24/2022421799290Open ↗
05/03/2021440613329Open ↗
08/13/2020440613329Open ↗
Showing 3 of 5 on file for this type
▸BISTR8: Energy Code Progress Inspections4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
08/12/2020440613329Open ↗
Showing 1 of 2 on file for this type
▸Inspections & Test Reports20
▸BISTECHNICAL REPORT: RESPONSIBILITY15
10/27/2022410016263Open ↗
08/24/2022421799290Open ↗
05/31/2022421799290Open ↗
Showing 3 of 15 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION2
06/20/2018410209643Open ↗
05/25/2018421193425Open ↗
▸BISDEP Hydrant Flow Test Letter1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs157
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST54
05/06/2021440613329Open ↗
10/21/2020410049219Open ↗
09/17/2020410049219Open ↗
Showing 3 of 54 on file for this type
▸BISADMINISTRATIVE OBJECTIONS54
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 54 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION35
10/25/2017401311763Open ↗
Showing 1 of 35 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE8
06/07/2022421799290Open ↗
07/13/2020421799290Open ↗
06/10/2020421799290Open ↗
Showing 3 of 8 on file for this type
▸BISSUPERSEDING LETTER4
08/29/2022410016263Open ↗
05/05/2022421799290Open ↗
Showing 2 of 4 on file for this type
▸BISCCD1-Construction Code Determination2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Cost, Insurance & Ownership125
▸BISCOST AFFIDAVIT123
11/03/2022410016263Open ↗
10/27/2022410016263Open ↗
05/06/2021440613329Open ↗
Showing 3 of 123 on file for this type
▸BISSTEEL AFFIDAVIT- FINAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)1
07/02/2020421799290Open ↗
▸Filing & Intake Forms107
▸BISEFILING COVER SHEET60
02/07/2020421799290Open ↗
11/28/2018421696908Open ↗
Showing 2 of 60 on file for this type
▸BISADDITIONAL INFORMATION35
11/03/2022410016263Open ↗
08/29/2022410016263Open ↗
05/31/2022421799290Open ↗
Showing 3 of 35 on file for this type
▸BISBOROUGH INTAKE FORM10
06/13/2019420200543Open ↗
12/17/2018421194987Open ↗
10/11/2018421194978Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
08/12/2020440613329Open ↗
Showing 1 of 2 on file for this type
▸Other Documents11
▸BISFIRE SUPP ANSUL APPROVL: FD-FSS5
11/03/2022410016263Open ↗
11/03/2022410016263Open ↗
11/03/2022410016263Open ↗
Showing 3 of 5 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
10/21/2020410049219Open ↗
09/17/2020410049219Open ↗
09/17/2020410049219Open ↗
Showing 3 of 4 on file for this type
▸BISUnknown1
06/19/2018421427575Open ↗
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type