← Back
Elevator cooperative
West 25th Street Condominium
254 WEST 25 STREET · BIN 1014179
💬 Discuss this project
1925Year Built
6Stories
D4Building Class
R8AZoning
20,456 sfGross Floor Area
25Units
Rent Stabilized10 Open Violations 8 unresolved · 2 paperwork only ▸FISP: SAFE
Elevator cooperative · Owner of record: W 25TH ST OWNERS INC · 4,928 sf lot · 4.15 FAR built · Flood zone X
Locations of Work
Architecture
Roof2p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PARSONS CONSTRUCTION807/08/2026
RELIABLE ENTERPRISES907/08/2026
W 25TH ST OWNERS INC803/22/2026
W 25 ST OWNERS INC203/22/2026
WEST 25TH STREET OWNERS2003/22/2026
WEST 25TH OWNERS INC.103/22/2026
254 WEST 25 STREET103/22/2026
25TH STREET OWNERS CORP103/22/2026
SANDBERG MANAGEMENT203/21/2026
WEST 25TH STREET CONDOMINIUM203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
STONE ENGINEERING & ARCHITECTURE DP203/21/2026
AE DESIGN SOLUTION203/21/2026
D D EXPEDITORS1003/21/2026
NY CONTRACTING & SAFETY CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EVERLAST SCAFFOLDING INCGeneral Contractor807/08/2026
RELIABLE ENTERPRISES INCGeneral Contractor407/08/2026
METROPOLIS GROUP NY LLCGeneral Contractor407/08/2026
PARSONS CONSTRUCTION INCGeneral Contractor407/08/2026
CIRRINCIONE, SALVATOREElectrical203/21/2026
KEYSTONE METAL WORKS CORPElectrical203/21/2026
MURRAY PLBG & HTG CORPElectrical203/21/2026
6TH AVENUE CONSTRUCTION &General Contractor203/21/2026
SERGIO GIANNACHIElectrical103/21/2026
JONATHAN LANDAUElectrical103/21/2026
RICHARD NEUElectrical103/22/2026
NEU, RICHARDElectrical103/21/2026
LELIS, ARILSONElectrical103/21/2026
RICHARD NEUElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JOSEPH K. BLUM CO. LLP1741408/25/2024
JAJ ENGINEERING PLLC930103/08/2024
STONE ENGINEERING & ARCHI1362111/21/2022
Building Lifecycle
All (134)Filed (12)Permit Issued (12)Signed Off (6)Facade (FISP) (15)Violation (48)Objection (20)Special Inspection (21)
04/29/2026
Violation issued (HPD, open)
A
12/04/2025
Cycle 10 facade report signed — SAFE
11/18/2025
Cycle 10 facade report submitted
11/13/2025
Cycle 10 facade inspection completed
08/12/2025
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00875732-I1
08/12/2025
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00875748-I1
05/21/2025
Signed off — Alteration
Roof Replacement Project - no change in use, egress, or occupancy
M08040362-I1
10/22/2024
Signed off — Alteration
FILING ON CONTRACTOR'S BEHALF FOR 100 LF OF SIDEWALK SHEDS. IN CONJUNCTION WITH DOB # 104212273.
M00306497-I1
09/04/2024
Permit issued — Structural
M00861513-I1-ST
08/26/2024
Objection raised — Other
08/26/2024
Objection resolved — Addressed
08/25/2024
Filed — Alteration
Reconstruct existing retaining wall at rear yard per plans
M00861513-P3
08/21/2024
Special inspection requirement — Final
Dane Barnes
08/21/2024
Special inspection requirement — Tenant Protection Plan Compliance
08/21/2024
Special inspection requirement — Concrete - Cast-In-Place
Dane Barnes
08/21/2024
Special inspection requirement — Masonry
Dane Barnes
07/25/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Joseph Jabour
07/25/2024
Special inspection requirement — Subgrade Inspections
Joseph Jabour
07/25/2024
Special inspection requirement — Tenant Protection Plan Compliance
WILLIAM DEGRAAFF
07/25/2024
Special inspection requirement — Footing and Foundation
WILLIAM DEGRAAFF
07/23/2024
Filed — Alteration
Reconstruct existing retaining wall at rear yard per plans
M00861513-P2
07/22/2024
Special inspection requirement — Tenant Protection Plan Compliance
07/22/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
07/22/2024
Special inspection requirement — Subgrade Inspections
07/22/2024
Special inspection requirement — Footing and Foundation
WILLIAM DEGRAAFF
05/29/2024
Permit issued — Construction Fence
M01038325-I1-FN
05/14/2024
Filed — Alteration
INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01038325-I1
03/08/2024
Filed — Alteration
Reconstruct existing retaining wall at rear yard per plans
M00861513-P1
03/08/2024
Filed — Alteration
Reconstruct existing retaining wall at rear yard per plans
M00861513-S2
03/03/2024
Special inspection requirement — Tenant Protection Plan Compliance
Dane Barnes
03/03/2024
Special inspection requirement — Concrete - Cast-In-Place
Dane Barnes
03/03/2024
Special inspection requirement — Masonry
Dane Barnes
03/03/2024
Special inspection requirement — Final
Dane Barnes
08/07/2023
Permit issued — General Construction
M08040362-I1-GC
06/26/2023
Filed — Alteration
Reconstruct existing retaining wall at rear yard per plans
M00861513-I1
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/17/2023
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00875732-I1
05/17/2023
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00875748-I1
05/17/2023
Permit issued — Sidewalk Shed
M00875732-I1-SH
05/17/2023
Permit issued — Supported Scaffold
M00875748-I1-SF
03/15/2023
Violation issued (HPD, closed)
A
11/21/2022
Filed — Alteration
Roof Replacement Project - no change in use, egress, or occupancy
M08040362-I1
11/15/2022
Special inspection requirement — Tenant Protection Plan Compliance
Evan Petkanas
11/15/2022
Special inspection requirement — Masonry
Evan Petkanas
11/15/2022
Special inspection requirement — Final
Evan Petkanas
08/09/2022
Cycle 9 facade report signed — SAFE
07/20/2022
Cycle 9 facade inspection completed
02/19/2022
Cycle 9 facade report submitted
02/16/2022
Violation issued (HPD, closed)
A
01/31/2022
Permit issued — Sidewalk Shed
M00306497-I1-SH
01/20/2022
Permit issued — Sidewalk Shed
M00306497-I1-SH
01/11/2022
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE.
M00534050-I1
01/11/2022
Signed off — Alteration
INSTALL MEDIUM DUTY SCAFFOLDING AS PER PLANS. NO CHANGE IN USE, EGRESS, OCCUPANCY UNDER THIS APPLICATION. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE. SIDEWALK SHED FILED UNDER SEPARATE APPLICATION
M00534051-I1
12/04/2021
Violation issued (ECB, closed)
Construction
10/20/2021
Violation issued (ECB, closed)
Construction
08/17/2021
Violation issued (ECB, closed)
Construction
08/04/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/23/2021
Violation issued (ECB, closed)
Boilers
06/15/2021
Permit issued — Sidewalk Shed
M00534050-I1-SH
06/15/2021
Permit issued — Supported Scaffold
M00534051-I1-SF
Latest 60 of 134 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedMETROPOLIS GROUP NY LLC09/04/2024
DOB NOWConstruction FencePermit IssuedMETROPOLIS GROUP NY LLC05/29/2024
DOB NOWGeneral ConstructionSigned-off6TH AVENUE CONSTRUCTION &08/07/2023
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC05/17/2023
DOB NOWSupported ScaffoldSigned-offRELIABLE ENTERPRISES INC05/17/2023
DOB NOWSidewalk ShedSigned-offEVERLAST SCAFFOLDING01/31/2022
DOB NOWSidewalk ShedSigned-offEVERLAST SCAFFOLDING01/20/2022
DOB NOWSidewalk ShedSigned-offPARSONS CONSTRUCTION INC06/15/2021
DOB NOWSupported ScaffoldSigned-offPARSONS CONSTRUCTION INC06/15/2021
DOB NOWSidewalk ShedSigned-offEVERLAST SCAFFOLDING02/03/2021
DOB NOWSidewalk ShedSigned-offEVERLAST SCAFFOLDING01/13/2021
DOB NOWSidewalk ShedSigned-offEVERLAST SCAFFOLDING08/04/2020
BISOTISSUEDM GROUP MANAGEMENT CORP09/30/2021
BISPLISSUEDABR PLBG&HTG CONTR INC05/23/2018
BISOTISSUEDTODT CORPORATION05/16/2018
BISPLISSUEDAMERICAN STANDARD P&H CORORP.01/04/2017
BISOTISSUEDGLEN WAY CORP12/23/2016
BISMHISSUEDGLEN WAY CORP12/23/2016
BISMHISSUEDABBA CONSTRUCTION LLC10/05/2015
BISOTISSUEDRSF BUILDING CORP05/26/2015
BISPLISSUEDRJ BRUNO INC04/13/2015
BISOTISSUEDRSF BUILDING CORP04/09/2015
BISFBISSUEDC C CONTROLLED COMBUSTION04/07/2010
BISBLISSUEDC C CONTROLLED COMBUSTION10/01/2009
BISOTISSUEDJUNO CONTRACTING CORP07/05/2001
BISEQISSUEDSPRING ENTERPRIS INC.07/02/2001
BISEQISSUEDSPRING ENTERPRIS INC.07/02/2001
BISOTISSUEDTERRY DESIGN05/09/2000
BISOTISSUEDLOMBARDI RESTORATION CORP.10/13/1993
6 projects · most recent 04/20/2026
General Wiring
FiledStatusContractorScope
04/20/2026CompleteACCURATE ELEC'L CORP.General Wiring
05/18/2023Permit IssuedRICHARD NEU—
10/22/2022CompleteROBIN ELECTRICAL CO., INCGeneral Wiring
06/29/2021CompleteAXCEL ELECTRIC CO., INC.—
06/25/2021CompleteBDS ELECTRIC CORP.—
05/25/2018CompleteFOCUS ELECTRICAL INCGeneral Wiring
1 project · most recent 08/25/2024
Concrete Masonry
FiledStatusContractorScope
08/25/2024Permit IssuedMETROPOLIS GROUP NY LLCConcrete, Masonry
1 project · most recent 05/14/2024
Fence
FiledStatusContractorScope
05/14/2024Permit IssuedMETROPOLIS GROUP NY LLCFence
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
08/21/2024FinalDane Barnesprogress
08/21/2024Tenant Protection Plan Compliance—special
08/21/2024Concrete - Cast-In-PlaceDane Barnesspecial
08/21/2024MasonryDane Barnesspecial
07/25/2024Excavations - Sheeting, Shoring, and BracingJoseph Jabourspecial
07/25/2024Subgrade InspectionsJoseph Jabourspecial
07/25/2024Tenant Protection Plan ComplianceWILLIAM DEGRAAFFspecial
07/25/2024Footing and FoundationWILLIAM DEGRAAFFprogress
07/22/2024Tenant Protection Plan Compliance—special
07/22/2024Excavations - Sheeting, Shoring, and Bracing—special
07/22/2024Subgrade Inspections—special
07/22/2024Footing and FoundationWILLIAM DEGRAAFFprogress
03/03/2024Tenant Protection Plan ComplianceDane Barnesspecial
03/03/2024Concrete - Cast-In-PlaceDane Barnesspecial
03/03/2024MasonryDane Barnesspecial
03/03/2024FinalDane Barnesprogress
11/15/2022Tenant Protection Plan ComplianceEvan Petkanasspecial
11/15/2022MasonryEvan Petkanasspecial
11/15/2022FinalEvan Petkanasprogress
06/04/2021FinalGURVINDER SINGHprogress
06/04/2021FinalGURVINDER SINGHprogress
▾Documents — 175 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch11
09/03/2026M00534051-I1Request digital key ↗
09/03/2026M00534050-I1Request digital key ↗
09/01/2026M08040362-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/15/2026M00306497-I1Request digital key ↗
▸Applications & Permits35
▸BISPLAN / WORK APPROVAL APPLICATION18
09/27/2021140982550Open ↗
12/13/2020140982550Open ↗
12/08/2020140982550Open ↗
Showing 3 of 18 on file for this type
▸BISWORK PERMIT APPLICATION15
09/30/2021140982550Open ↗
05/23/2018123437940Open ↗
05/17/2018123437940Open ↗
Showing 3 of 15 on file for this type
▸BISSIDEWALK SHED APPLICATION & PERMIT1
08/26/2021140982550Open ↗
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
12/16/2020140982550Open ↗
▸Seals & Professional Certifications44
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION15
02/28/2019123437940Open ↗
10/09/2018122909638Open ↗
10/09/2018122909638Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
09/01/2026M08040362-I1Open ↗
08/27/2026M00861513-P1Open ↗
08/27/2026M00861513-S2Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/01/2026M08040362-I1Open ↗
09/01/2026M08040362-I1Open ↗
08/30/2026M00861513-P3Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/01/2026M00534051-I1Open ↗
09/01/2026M00534050-I1Open ↗
09/01/2026M08040362-I1Open ↗
Showing 3 of 7 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
12/08/2020140982550Open ↗
▸Trade Schedules & Equipment17
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE11
01/08/2019123437940Open ↗
12/04/2018123437940Open ↗
03/16/2018123437940Open ↗
Showing 3 of 11 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
10/18/2010120153298Open ↗
10/06/2010120153298Open ↗
09/15/2009120153298Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
11/19/2015122184509Open ↗
10/30/2015122184509Open ↗
▸BISSCHEDULE B - PLUMBING1
02/24/2015122184509Open ↗
▸Safety & Tenant Protection4
▸BISTenant Protection Plan and Notes2
03/16/2018123437940Open ↗
11/01/2016122909638Open ↗
▸BISTPP1: TENANT PROTECTION PLAN1
08/30/2021140982550Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026M00306497-I1Open ↗
▸Environmental & Asbestos6
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
12/08/2020140982550Open ↗
03/16/2018123437940Open ↗
09/29/2015122529040Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
09/15/2009120153298Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
09/01/2026M08040362-I1Open ↗
▸Energy Compliance18
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS11
02/28/2019123437940Open ↗
10/09/2018122909638Open ↗
10/09/2018122909638Open ↗
Showing 3 of 11 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
08/09/2022140982550Open ↗
02/28/2019123437940Open ↗
10/09/2018122909638Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
08/09/2022140982550Open ↗
12/16/2020140982550Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
08/09/2022140982550Open ↗
12/16/2020140982550Open ↗
12/16/2020140982550Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs6
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
08/10/2022140982550Open ↗
02/28/2019123437940Open ↗
10/09/2018122909638Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
10/09/2018122909638Open ↗
▸Cost, Insurance & Ownership11
▸BISCOST AFFIDAVIT11
08/09/2022140982550Open ↗
12/08/2020140982550Open ↗
02/28/2019123437940Open ↗
Showing 3 of 11 on file for this type
▸Filing & Intake Forms16
▸BISADDITIONAL INFORMATION8
09/29/2021140982550Open ↗
09/14/2021140982550Open ↗
12/16/2020140982550Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING COVER SHEET4
03/16/2018123437940Open ↗
03/16/2018123437940Open ↗
09/29/2015122529040Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM3
02/28/2019123437940Open ↗
12/04/2018123437940Open ↗
10/09/2018122909638Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
12/08/2020140982550Open ↗
▸Other Documents2
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
12/28/2016122909638Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026M00861513-S2Open ↗