ECB04/20/2026Failure to file acceptable amended cycle 9A report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control #901680. Remedy: file acceptable report.$1K due
DOB08/01/2024Failure to correct swarmp conditions
DOB01/16/2024Cycle 9A unsafe report filed
ECB11/28/2023Failure to maintain exterior building facade and appurtenances. Note: observed at time of inspection large separated step crack on parapet level of exposure #1(north). Also observed broken glass on the 3RD floo$1K due
DOB11/28/2023Emergency work order,due to the large sperate step crack at parapet level of exposure#1(north),facade on west 35TH street.remedy:make imme immed.repairs under the supervision of licensed professional remove secure all loose materials,as per 1RCNY 103-04Issued 2023; DOB's record still lists it as active
ECB01/05/200836,50A,b,c,d.reimers electric miniature hp steam blr,12 r.w.36-referenced boiler is not registered on the DOB database.respondent must file for & obtain signed off application to legalize the boiler.50A-no drai$-4 due
ECB07/08/2026At time of inspection observed inadequate fire extinguisher on entire site. On active construction site all extinguishers are store on floor contrary to fire code. Also observed extinguishers with expired tagsHearing held — result not yet published$2K proposed
ECB07/08/2026At time of inspection observed active construction activities. Upon requesting construction super logs competent person was unable to provide logs. No records of any visit to site was provided, multiple hazardoHearing held — result not yet published$5K proposed
ECB07/08/2026At time of inspection on a 16 story building observed active construction activities on all floors. Failure to maintain standpipe in state of readiness. On second floor observed standpipe cut off. No FDNY letteHearing held — result not yet published$5K proposed
ECB07/08/2026At time of inspection observed active construction activities. Upon requesting documents to competent person multiple documents were not provided. Sidewalk shed drawings, initial installation drawings, daily inHearing held — result not yet published$1K proposed
ECB07/08/2026At time of inspection observed active construction site. Notice on multiple floors inadequate lighting on hallway, stairs and rooms. Observed workers using phone lighting to be able to work. Hazardous conditionHearing held — result not yet published$2K proposed
ECB04/21/2023Failure to maintain exterior building facade and appurtenances. Noted at time of inspection north elevation exposure#1(w 35TH st) loose and broken glass in 3RD fl windows due to recent fire. Remedy:maintain extNothing owed — awaiting certificate of correction
ECB04/20/2023On 17TH floor erected full height partition wall to create illegal occupancy as driving school, class room & office facilities without a permit. Also sidewalk shed erected on expo # 01 and no active permit on fNothing owed — awaiting certificate of correction
ECB04/20/2023Observed prohibited hardware key operable locks & latches erected on emergency exit door on lobby level and mezzanine level between 1ST & 2ND floor., provide legal hardwareNothing owed — awaiting certificate of correction
ECB04/20/2023Failure to maintain issues: cellar level wall & ceiling stucco cracks, missing and disrepair. All exit stairwell doors on a & b damaged and disrepair bulkhead skylight metal rotten & loose., repair and/replaceNothing owed — awaiting certificate of correction
ECB04/20/2023Emergency exit from cellar to street on stairwell a sealed with metal gate, padlocks & nailed down at grade level & 6TH floor exit door. Also observed 7TH, 9TH, 10TH 11TH and 17TH floor exit door partially obstNothing owed — awaiting certificate of correction
ECB02/02/2023Failure to maintain building exterior walls facade and appurtenances. Observed at EXP1 north elevation cracked window pane at multiple locations,corrosion of metal 1 floor.eroded mortar joints and damaged facadNothing owed — awaiting certificate of correction
ECB12/22/2022Failure to submit acceptable required cycle 9A report of critical examination documenting condition of exterior wall & appurtenances required by 28-302.4 for control #901680.remedy:submit acceptable required teNothing owed — awaiting certificate of correction
ECB08/19/2021Failure to comply w/the comm's order to file a cert of correction w/the dept of bldgs for violating conditions cited in nov#35405894L ISSUED03/29/19 pursuant to 28-201.2;28-204.4;1RCNY 102.01. Remedy: file certNothing owed — awaiting certificate of correction
ECB02/24/2021Unapproved/unsafe/unsuitable electrical equipment apparatus materials devices appliances or wiring in use.throughout suite 11B loose exposedunsecured unprotected wires open boxes and ungrounded fixtures.rem:comNothing owed — awaiting certificate of correction
ECB11/21/2019Failure to maintain exterior building facade and appurtenances.note:exposure 1 north elevation 9TH floor,center right window missing,replaced with plywood & fan.note:exposure #3 south elevation multiple levelsNothing owed — awaiting certificate of correction
ECB04/04/2019Work w/o a permit.work noted:suite "a' at 12TH floor.,installed water & waste lines to create 3 pc bathroom electrical & plumbing work performed to install hwh.rem:obtain permitsNothing owed — awaiting certificate of correction
ECB04/13/201636,B254 fulton v.t. Boiler, 15HP, NB60532, hp steam, gas fd, 1990(36)referenced boiler was moved from 335 west 35 st 4TH floor and install ed at 254 west 35 st 11TH floor. Boiler not registered on DOB databaseNothing owed — awaiting certificate of correction
ECB04/13/201636,B254. Fulton, v.t. Boiler,10HP,high pressure steam boiler NB67908,built 1992. 36-reference boiler was found in operation on the 4TH floorof premises. The boiler is not registered on the DOB database.the respNothing owed — awaiting certificate of correction
ECB04/13/201636, B254. Fulton v.t. Boiler, 15HP;high pressure steam boiler, NB71195,gas-fired, built 1991: 36-referenced boiler was found in operation onthe 16TH flr of the premises. The boiler is not registered on the deptNothing owed — awaiting certificate of correction
ECB04/13/201636,B254. Pacific steam, 23KW,electric high pressure steam supply boiler, NB12351, built 2012. 36-reference boiler was installed and made operational at the stated place of occurrence w/o being registerd on theNothing owed — awaiting certificate of correction
ECB04/13/201636,B254 pacific steam, 18 kw,electric high pressure steam boiler, NB10497, built 2007: referenced boiler was found in operation on the 3RD flr or the premises. The boiler is not registered on the dept of bldgsNothing owed — awaiting certificate of correction
ECB04/11/201650A,50B50C. Fulton v.t. Boiler, 6HP,NB77470,hpsm, gas fired, 1996; 50A-high ambient temperature in boiler room. Mechanical fan not working.repair fan; 50B-spill switchn missing; 50C-excessive furnace cement atNothing owed — awaiting certificate of correction
ECB01/05/200836,50.fulton vt blr 15HP,NB 69655,gas 1994.36-newly installed referenced boiler not registered on the DOB database.respondent must obtain signed off application to validate registration.50-no dial glass on theNothing owed — awaiting certificate of correction
ECB01/05/200836,50A,b,c,d,e.hoffman miniature erect hp stm blr 17KA.36-referenced hp elect miniature boiler not registered on the DOB database.file for &obtain signoff to legalize boiler.50A-screw threads at outlet end of tNothing owed — awaiting certificate of correction
ECB05/09/2006BQ9,36,50. Reimers electric miniture boiler. 50) pipe down safety valve discharge.Nothing owed — awaiting certificate of correction
ECB05/09/2006BQ9,36,34B. 1993 fulton NB 67328Nothing owed — awaiting certificate of correction
ECB05/09/2006BQ9,50A,50B,36. 1993 hoffman/new yorker nbd#5627. 50A)pipe safety valve discharge to a safe point. 50B) pipe down glass drain valve.Nothing owed — awaiting certificate of correction
ECB05/09/200634B,36. 1995 fulton 74702Nothing owed — awaiting certificate of correction
ECB05/08/2006BQ9/36/48B. 1990 fulton NB 59879.Nothing owed — awaiting certificate of correction
ECB07/12/200436,50.fulton v.t. Boiler,10HP NB67328,gas 1993.36-no record on boiler registration.boiler was based at 26 west 36 st,12 floor and was removed and installed at 254 w 35 st,16 fl.produce signed off application asNothing owed — awaiting certificate of correction
Likely answered · the city's own records show a filing, but DOB's feed still lists these as active
DOB11/14/2025Violation issued-failure to file 2024 external hgh pressure inspectionAnswered on the city's records: a 2024 boiler inspection report was accepted (Jun 28, 2024)11 identical filings
DOB11/14/2025Violation issued-failure to file 2024 internal hgh pressure inspectionAnswered on the city's records: a 2024 boiler inspection report was accepted (Jun 28, 2024)12 identical filings
Old · issued 3+ years ago and still listed by DOB; nothing on the city's records either way
DOB10/04/2023Failure to certify correction on immediately hazardous (class 1) ECB violationIssued 2023; DOB's record still lists it as active4 identical filings
DOB04/21/2023Emergency work order due to the hazard posed by the broken glass panes ON3RD floor of north elevation exposure#1 of facade on west 3TH street remedy:immediately remove all loose and broken glass from window frame on north elevation exposure#1 on west 35TH street as per 1RCNY 103-04Issued 2023; DOB's record still lists it as active
DOB04/20/2023Structure rendered non-complaint. At time of inspection damage observed to have been sustained to 3RD floor due to fire at 254 w 35 street manhattanIssued 2023; DOB's record still lists it as active
DOB06/26/2020Elevator: elevatorrequired (DOB violation)Issued 2020; DOB's record still lists it as active