← Back
BuildNYC
Over six families without stores
2541 OLINVILLE AVENUE
BRONX · BIN 2051293
💬 Discuss this project
1927Year Built
5Stories
C1Building Class
R6Zoning
39,157 sfGross Floor Area
31Units
LL97 CoveredRent Stabilized33 Active Violations ▸
Over six families without stores · Owner of record: 2541 Olinville Avenue · 9,006 sf lot · 4.35 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbingEquipment
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Sidewalk shed installation3p · 1 filing · 2 docs
CellarBoiler replacement4p · 1 filing · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
2541 Olinville Avenue703/22/2026
Bethco703/21/2026
Beth Abraham Health Services703/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Syed Engineering101/13/2021
New York & Company210/21/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
New York & Company403/21/2026
Expediting103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JascoScaffold303/21/2026
B.P. ElectricElectrical403/22/2026
GSB Plumbing & HeatingPlumbing203/22/2026
Robert J Dujat Plumbing & HeatingPlumbing103/21/2026
Bauer MechancialPlumbing107/08/2026
Rock ScaffoldingGeneral Contractor103/21/2026
1 R SGeneral Contractor103/21/2026
BethcoGeneral Contractor106/26/2008
BP ElectricGeneral Contractor110/14/2022
Emf ContractingGeneral Contractor106/09/2003
George S Bateman Plumbing & HeatingPlumbing412/08/2015
MF ContractingGeneral Contractor102/20/2004
Richard MishkinGeneral Contractor205/13/2015
Robert Dujat PlumbingPlumbing210/23/2003
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
New York Engineering Associates851210/21/2019
Building Lifecycle
07/07/2026
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 10 SQ. FT. AT CEILING, NORTH WALL AND EAST WALL…
HPD violation · open
06/06/2026
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 3G, 4th STORY, 2nd APARTMENT FROM EAST AT…
HPD violation · closed
06/06/2026
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE KITCHEN LOCATED AT APT 3G, 4th STORY,…
HPD violation · closed
06/06/2026
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT PUBLIC HALL, 1st STORY
HPD violation · closed
06/06/2026
§ 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 3G, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
HPD violation · closed
199 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offJasco01/21/2021
DOB NOWBoiler EquipmentPermit IssuedFive Boro Associates10/22/2019
DOB NOWPlumbingSigned-offMidwood-Raftery Plumbing & Heating10/16/2019
BISOTISSUEDBP Electric10/14/2022
BISPLISSUEDGSB Plumbing & Heating10/17/2016
BISPLISSUEDGSB Plumbing & Heating08/10/2016
BISPLISSUEDGeorge S Bateman Plumbing & Heating12/08/2015
BISPLISSUEDGeorge S Bateman Plumbing & Heating09/03/2015
BISOTISSUEDRichard Mishkin05/13/2015
BISPLISSUEDGeorge S Bateman Plumbing & Heating08/01/2014
BISOTISSUEDRichard Mishkin07/16/2013
BISPLISSUEDGeorge S Bateman Plumbing & Heating07/12/2013
BISEQISSUEDRock Group NY04/15/2013
BISEQISSUEDRock Scaffolding04/11/2012
BISEQISSUEDRock Scaffolding05/18/2011
BISOTISSUEDBethco06/26/2008
BISFBISSUEDAce-Atlas Plumbing & Heating06/19/2007
BISPLISSUEDRobert J Dujat Plumbing & Heating04/15/2004
BISOTISSUEDMF Contracting02/20/2004
BISPLISSUEDRobert Dujat Plumbing10/23/2003
BISPLISSUEDRobert Dujat Plumbing10/23/2003
BISOTISSUEDEmf Contracting06/09/2003
BISFSISSUEDIrving Bauer03/03/1997
BISBLISSUEDIrving Bauer02/21/1997
1 project · most recent 02/09/2023
FiledStatusContractorScope
02/09/2023CompleteB.P. Electric—
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
10/16/2019Heating SystemsLOUIS ARENAspecial
10/16/2019HVAC and service water heating system controls LOUIS ARENAenergy_progress
10/16/2019Maintenance informationLOUIS ARENAenergy_progress
10/16/2019HVAC and service water heating equipment LOUIS ARENAenergy_progress
149 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account