← Back
One story retail building
2542 EAST TREMONT AVENUE
BRONX · Westchester Square · BIN 2042385
💬 Discuss this project
1927Year Built
1Stories
K1Building Class
R6Zoning
3,125 sfGross Floor Area
2Units
2 Open Violations 1 unresolved · 1 paperwork only ▸
One story retail building · Owner of record: BRONX A & A ASSOCIATES, LLC · 3,290 sf lot · 0.95 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof4p · 1 filing · 13 docs
Floor 110p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LAMASACORP1207/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CONSTSCAPE709/24/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
FAST BUILDING SOLUTIONS1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J. SIBAJA KITCHEN AND VE*General Contractor303/21/2026
DFE CONTRACTOR LLCGeneral Contractor207/08/2026
HAROLD HEADLEY PLUMBINGPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519709/24/2021
Building Lifecycle
All (41)Filed (7)Permit Issued (4)Violation (7)Special Inspection (23)
11/20/2021
Permit issued — General Construction
X00537261-I1-GC
09/29/2021
Special inspection requirement — Maintenance information
Younes Abouyaala
09/29/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
09/29/2021
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
09/24/2021
Filed — Alteration
PROPOSED COOKING EQUIPMENT,PLUMBING FIXTURES,GAS PIPE AT EXISTING COMMERCIAL BUILDING U.G 6 ON 1ST. FL. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X00537297-P2
09/10/2021
Special inspection requirement — Maintenance information
Younes Abouyaala
09/10/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
09/10/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
09/10/2021
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
09/10/2021
Special inspection requirement — Final
NAVEEN KUMAR
09/10/2021
Special inspection requirement — Mechanical Systems
Younes Abouyaala
09/10/2021
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
09/07/2021
Filed — Alteration
PROPOSED COOKING EQUIPMENT,PLUMBING FIXTURES,GAS PIPE AT EXISTING COMMERCIAL BUILDING U.G 6 ON 1ST. FL. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X00537297-P1
09/07/2021
Filed — Alteration
PROPOSED METAL HOOD AND DUCT EXHAUST TO ROOF AT EXISTING COMMERCIAL BUILDING U.G 6 ON 1ST. FL. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X00536523-P2
09/07/2021
Filed — Alteration
PROPOSED MINOR INTERIOR RENOVATION COSMETIC REPAIR AT EXISTING COMMERCIAL SPACE AT FIRST FLOOR. INCLUDING PLUMBING, MECHANICAL. WORK NO CHANGE USE, EGRESS OR OCCUPANCY
X00537261-P1
09/07/2021
Special inspection requirement — Interior lighting power
Younes Abouyaala
09/07/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
09/07/2021
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
09/07/2021
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
09/07/2021
Special inspection requirement — Fenestration areas
Younes Abouyaala
08/18/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
08/18/2021
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
08/18/2021
Special inspection requirement — Maintenance information
Younes Abouyaala
08/18/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
08/18/2021
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
08/18/2021
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
08/18/2021
Special inspection requirement — Interior lighting power
Younes Abouyaala
08/18/2021
Special inspection requirement — Fenestration areas
Younes Abouyaala
07/13/2021
Permit issued — Plumbing
X00537297-I1-PL
07/07/2021
Permit issued — Mechanical Systems
X00536523-I1-MS
06/30/2021
Permit issued — General Construction
X00537261-I1-GC
06/13/2021
Filed — Alteration
PROPOSED METAL HOOD AND DUCT EXHAUST TO ROOF AT EXISTING COMMERCIAL BUILDING U.G 6 ON 1ST. FL. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X00536523-I1
06/11/2021
Filed — Alteration
PROPOSED MINOR INTERIOR RENOVATION COSMETIC REPAIR AT EXISTING COMMERCIAL SPACE AT FIRST FLOOR. INCLUDING PLUMBING, MECHANICAL. WORK NO CHANGE USE, EGRESS OR OCCUPANCY
X00537261-I1
06/11/2021
Filed — Alteration
PROPOSED COOKING EQUIPMENT,PLUMBING FIXTURES,GAS PIPE AT EXISTING COMMERCIAL BUILDING U.G 6 ON 1ST. FL. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X00537297-I1
02/04/2002
Violation issued (ECB, closed)
Construction
12/01/1994
Violation issued (ECB, open)
Zoning
11/14/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/01/1993
Violation issued (DOB, open)
VPW-VIOLATION UNSERVED ECB-WORK WITHOUT PERMIT-ACTIVE
09/01/1993
Violation issued (DOB, closed)
VPW*-VIOLATION UNSERVED ECB-WORK WITHOUT PERMIT-DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedDFE CONTRACTOR LLC11/20/2021
DOB NOWPlumbingPermit IssuedHAROLD HEADLEY PLUMBING07/13/2021
DOB NOWMechanical SystemsPermit IssuedJ. SIBAJA KITCHEN AND VE*07/07/2021
DOB NOWGeneral ConstructionPermit IssuedDFE CONTRACTOR LLC06/30/2021
BISPLISSUEDA P PLUMBING&HEATING INC06/27/2002
BISOTISSUEDUNIQUE STATE CONSTRUCTION CO.05/08/2002
BIS—ISSUEDNORTH SHORE NEON SIGN CO.07/31/2000
1 project · most recent 09/07/2021
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/07/2021Permit IssuedJ. SIBAJA KITCHEN AND VE*Ventilation Systems
Ventilation
__Junk__ # 180 3HP OR EQUAL 4,400 CFM · Exhaust Fan ×2
1 project · most recent 09/24/2021
Gas Water/Sanitary
FiledStatusContractorScope
09/24/2021Permit IssuedHAROLD HEADLEY PLUMBINGGas, Water/Sanitary
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
09/29/2021Maintenance informationYounes Abouyaalaenergy_progress
09/29/2021Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
09/29/2021Energy Code Compliance InspectionsYounes Abouyaalaprogress
09/10/2021Maintenance informationYounes Abouyaalaenergy_progress
09/10/2021Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
09/10/2021Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
09/10/2021Energy Code Compliance InspectionsYounes Abouyaalaprogress
09/10/2021FinalNAVEEN KUMARprogress
09/10/2021Mechanical SystemsYounes Abouyaalaspecial
09/10/2021Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
09/07/2021Interior lighting powerYounes Abouyaalaenergy_progress
09/07/2021Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
09/07/2021Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
09/07/2021Energy Code Compliance InspectionsYounes Abouyaalaprogress
09/07/2021Fenestration areasYounes Abouyaalaenergy_progress
08/18/2021Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
08/18/2021Energy Code Compliance InspectionsYounes Abouyaalaprogress
08/18/2021Maintenance informationYounes Abouyaalaenergy_progress
08/18/2021Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
08/18/2021Energy Code Compliance InspectionsYounes Abouyaalaprogress
08/18/2021Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
08/18/2021Interior lighting powerYounes Abouyaalaenergy_progress
08/18/2021Fenestration areasYounes Abouyaalaenergy_progress
▾Documents — 44 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/25/2026X00537261-I1Request digital key ↗
08/25/2026X00537261-P1Request digital key ↗
08/25/2026X00536523-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications30
▸DOB NOWProgress Inspector Seal & Signature16
09/02/2026X00536523-I1Open ↗
09/02/2026X00536523-I1Open ↗
09/02/2026X00536523-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/25/2026X00537297-P2Open ↗
08/25/2026X00537297-P1Open ↗
08/25/2026X00537297-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/02/2026X00536523-I1Open ↗
09/02/2026X00536523-I1Open ↗
09/02/2026X00536523-I1Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/25/2026X00537297-P1Open ↗
08/25/2026X00537297-P2Open ↗
08/25/2026X00537297-I1Open ↗
Showing 3 of 7 on file for this type