← Back
BuildNYC
One story retail building
2542 EAST TREMONT AVENUE
BRONX · BIN 2042385
💬 Discuss this project
1927Year Built
1Stories
K1Building Class
R6Zoning
3,125 sfGross Floor Area
2Units
0 Active Violations
One story retail building · Owner of record: Bronx A & A Associates · 3,290 sf lot · 0.95 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1 filing
Floor 13 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Lamasacorp1207/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Constscape709/24/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Fast Building Solutions1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J. Sibaja Kitchen and VE*General Contractor303/21/2026
Dfe ContractorGeneral Contractor207/08/2026
Harold Headley PlumbingPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA Building & Inspection1519709/24/2021
Building Lifecycle
All (44)Filed (7)Permit Issued (3)Violation (7)Special Inspection (23)
10/05/2022
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
X00537261-I1-GC
05/07/2022
Permit expired, never signed off — Plumbing
The city's record still shows this permit as issued, with no sign-off on its filing
X00537297-I1-PL
12/02/2021
Permit expired, never signed off — Mechanical Systems
The city's record still shows this permit as issued, with no sign-off on its filing
X00536523-I1-MS
11/20/2021
Permit renewed — General Construction
Renewed without changes
X00537261-I1-GC
09/29/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
09/29/2021
Special inspection requirement — Maintenance information
Younes Abouyaala
09/29/2021
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
09/24/2021
Filed — Alteration
PROPOSED COOKING EQUIPMENT,PLUMBING FIXTURES,GAS PIPE AT EXISTING COMMERCIAL BUILDING U.G 6 ON 1ST. FL. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X00537297-P2
09/10/2021
Special inspection requirement — Maintenance information
Younes Abouyaala
09/10/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
09/10/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
09/10/2021
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
09/10/2021
Special inspection requirement — Final
NAVEEN KUMAR
09/10/2021
Special inspection requirement — Mechanical Systems
Younes Abouyaala
09/10/2021
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
09/07/2021
Filed — Alteration
PROPOSED COOKING EQUIPMENT,PLUMBING FIXTURES,GAS PIPE AT EXISTING COMMERCIAL BUILDING U.G 6 ON 1ST. FL. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X00537297-P1
09/07/2021
Filed — Alteration
PROPOSED METAL HOOD AND DUCT EXHAUST TO ROOF AT EXISTING COMMERCIAL BUILDING U.G 6 ON 1ST. FL. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X00536523-P2
09/07/2021
Filed — Alteration
PROPOSED MINOR INTERIOR RENOVATION COSMETIC REPAIR AT EXISTING COMMERCIAL SPACE AT FIRST FLOOR. INCLUDING PLUMBING, MECHANICAL. WORK NO CHANGE USE, EGRESS OR OCCUPANCY
X00537261-P1
09/07/2021
Special inspection requirement — Interior lighting power
Younes Abouyaala
09/07/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
09/07/2021
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
09/07/2021
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
09/07/2021
Special inspection requirement — Fenestration areas
Younes Abouyaala
08/18/2021
Special inspection requirement — Interior lighting power
Younes Abouyaala
08/18/2021
Special inspection requirement — Fenestration areas
Younes Abouyaala
08/18/2021
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
08/18/2021
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
08/18/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
08/18/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
08/18/2021
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
08/18/2021
Special inspection requirement — Maintenance information
Younes Abouyaala
07/13/2021
Permit issued — Plumbing
X00537297-I1-PL
07/07/2021
Permit issued — Mechanical Systems
X00536523-I1-MS
06/30/2021
Permit issued — General Construction
X00537261-I1-GC
06/13/2021
Filed — Alteration
PROPOSED METAL HOOD AND DUCT EXHAUST TO ROOF AT EXISTING COMMERCIAL BUILDING U.G 6 ON 1ST. FL. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X00536523-I1
06/11/2021
Filed — Alteration
PROPOSED MINOR INTERIOR RENOVATION COSMETIC REPAIR AT EXISTING COMMERCIAL SPACE AT FIRST FLOOR. INCLUDING PLUMBING, MECHANICAL. WORK NO CHANGE USE, EGRESS OR OCCUPANCY
X00537261-I1
06/11/2021
Filed — Alteration
PROPOSED COOKING EQUIPMENT,PLUMBING FIXTURES,GAS PIPE AT EXISTING COMMERCIAL BUILDING U.G 6 ON 1ST. FL. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X00537297-I1
01/29/2003
Closed: Electric signs (DOB violation)
DOB violation · closed on the city's record
12/23/2002
Closed: Electric signs (DOB violation)
DOB violation · closed on the city's record
02/04/2002
Work without a permit dismantled existing grocery store,removed plumbing,electrical and partition walls to enlarge the comercial space.new…
ECB violation · closed
02/25/2000
Closed: Construction: other (DOB violation)
DOB violation · closed on the city's record
12/01/1994
An illusulated floshing flashing sign erected and is contrary to section 32-64 of the zoning resolution. (note district r-6-C2) remedyremove…
ECB violation · closed
11/14/1994
Electric signs (DOB violation)
DOB violation · closed · Issued 1994; DOB's record still lists it as active
09/01/1993
Construction: other (DOB violation)
DOB violation · closed · Issued 1993; DOB's record still lists it as active
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOW—Dfe Contractor—
DOB NOW—Harold Headley Plumbing—
DOB NOW—J. Sibaja Kitchen and VE*—
DOB NOW—Dfe Contractor—
BIS—A P Plumbing & Heating—
BIS—Unique State Construction Co—
BIS—North Shore Neon Sign Co—
Nothing on file for this building.
Nothing on file for this building.
▾Documents — 44 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/25/2026X00537261-I1Request the plans ↗
08/25/2026X00537261-P1Request the plans ↗
08/25/2026X00536523-I1Request the plans ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications30
▸DOB NOWProgress Inspector Seal & Signature16
09/02/2026X00536523-I1Open ↗
09/02/2026X00536523-I1Open ↗
09/02/2026X00536523-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/25/2026X00537297-P2Open ↗
08/25/2026X00537297-P1Open ↗
08/25/2026X00537297-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/02/2026X00536523-I1Open ↗
09/02/2026X00536523-I1Open ↗
09/02/2026X00536523-I1Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/25/2026X00537297-P1Open ↗
08/25/2026X00537297-P2Open ↗
08/25/2026X00537297-I1Open ↗
Showing 3 of 7 on file for this type