2 Open Violations 1 unresolved · 1 paperwork only▸
DOB10/08/2014FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB07/18/2014WORK WITHOUT PERMIT. WORK NOTED: IN REAR OF GARAGE A NEW GAS BOILER & WATER HEATER WAS INSTALLED WITH NO PERMITS FILED WITH THE DEPT OF BLDG. THERE WAS NO EMERGENCY LAA FILED TO COVER ANY EMERGENCY WORK. REMEDYNothing owed — awaiting certificate of correction
Two family brick · 2,090 sf lot · 0.98 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.