← Back
Miscellaneous two family
254A SARATOGA AVENUE
BROOKLYN · Ocean Hill · BIN 3042419
💬 Discuss this project
1901Year Built
2Stories
B9Building Class
R5BZoning
2,260 sfGross Floor Area
2Units
Rent Stabilized9 Open Violations ▸FDNY Report ↗
Miscellaneous two family · Owner of record: SSA REO ASSETS 03, LLC · 1,593 sf lot · 1.42 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Floor 210p · 1 filing · 11 docs
Floor 110p · 1 filing · 11 docs
Cellar11p · 1 filing · 11 docs
Filed — no permit issued11p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TRISTAR MANAGEMENT ASSOCIATES1307/08/2026
SSA REO ASSETS 03203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/16/2025$980K—SSA REO ASSETS 03, LLC → Private party$434/sf building
03/14/2024$1.2M—— → —$531/sf building
02/12/2024$715K—254A SARATOGA CENTER CORP → SSA REO ASSETS 03, LLC$316/sf building
11/04/2019$999K—254A SARATOGA CORP. → 254A SARATOGA CENTER CORP.$442/sf building
06/11/2018$550K—Private party → Private party$243/sf building
06/11/2018$550K—Private party → 254A SARATOGA CORP.$243/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
IKRA CONSULTING LLC512/11/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
YOUBER DESIGN1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PATRICK GILLESPIEElectrical103/21/2026
GOLDEN SAW CONSTRUCTION CGeneral Contractor107/08/2026
JOHN FITZGERALD PLBG &HTGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IKRA CONSULTING LLC7032107/18/2025
Building Lifecycle
All (85)Filed (3)Permit Issued (2)Signed Off (2)Violation (48)Inspection (3)Objection (20)Special Inspection (7)
04/23/2026
Signed off — Alteration
CAP & REMOVE (1 SHOWER) AT 1ST. RELOCATE PL FIXTURES W/ NEW (1 SINK, 1 WC, 1 LAV, 1 STOVE) AT 1ST & (1 SINK, 1 STOVE, 1 LAV, 1 WC, 1 TUB) AT 2ND. INSTALL NEW PL (1 LAV, 1 WC) AT CEL, (1 DW, 2 BOILER, 1 TUB) AT 1ST & (1 DW, 1 LAV, 1 WC, 1 SHOWER) AT 2ND
B01255458-S1
04/23/2026
Signed off — Alteration
CAP & REMOVE (1 SHOWER) AT 1ST. RELOCATE PL FIXTURES W/ NEW (1 SINK, 1 WC, 1 LAV, 1 STOVE) AT 1ST & (1 SINK, 1 STOVE, 1 LAV, 1 WC, 1 TUB) AT 2ND. INSTALL NEW PL (1 LAV, 1 WC) AT CEL, (1 DW, 2 BOILER, 1 TUB) AT 1ST & (1 DW, 1 LAV, 1 WC, 1 SHOWER) AT 2ND
B01255458-I1
12/30/2025
Objection resolved — Addressed
12/22/2025
Objection raised — Admin
12/11/2025
Filed — Alteration
CAP & REMOVE (1 SHOWER) AT 1ST. RELOCATE PL FIXTURES W/ NEW (1 SINK, 1 WC, 1 LAV, 1 STOVE) AT 1ST & (1 SINK, 1 STOVE, 1 LAV, 1 WC, 1 TUB) AT 2ND. INSTALL NEW PL (1 LAV, 1 WC) AT CEL, (1 DW, 2 BOILER, 1 TUB) AT 1ST & (1 DW, 1 LAV, 1 WC, 1 SHOWER) AT 2ND
B01255458-P1
11/24/2025
Violation issued (HPD, open)
I
11/21/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/21/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
11/21/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/29/2025
Permit issued — Plumbing
B01255458-S1-PL
09/09/2025
Objection resolved — Addressed
08/27/2025
Permit issued — General Construction
B01255458-I1-GC
08/06/2025
Objection resolved — Addressed
08/06/2025
Objection resolved — Addressed
08/06/2025
Objection resolved — Addressed
08/06/2025
Objection resolved — Addressed
08/06/2025
Objection resolved — Addressed
08/06/2025
Objection resolved — Addressed
08/06/2025
Objection resolved — Addressed
08/05/2025
Objection resolved — Addressed
08/04/2025
Objection raised — Fire_Protection
08/04/2025
Objection raised — Other
08/04/2025
Objection raised — Other
08/04/2025
Objection raised — Other
08/04/2025
Objection raised — Zoning
08/04/2025
Objection raised — Scope
08/04/2025
Objection raised — Other
07/31/2025
Objection raised — Cost
07/31/2025
Objection raised — Cost
07/18/2025
Filed — Alteration
CAP & REMOVE (1 SHOWER) AT 1ST. RELOCATE PL FIXTURES W/ NEW (1 SINK, 1 WC, 1 LAV, 1 STOVE) AT 1ST & (1 SINK, 1 STOVE, 1 LAV, 1 WC, 1 TUB) AT 2ND. INSTALL NEW PL (1 LAV, 1 WC) AT CEL, (1 DW, 2 BOILER, 1 TUB) AT 1ST & (1 DW, 1 LAV, 1 WC, 1 SHOWER) AT 2ND
B01255458-S1
07/18/2025
Filed — Alteration
CAP & REMOVE (1 SHOWER) AT 1ST. RELOCATE PL FIXTURES W/ NEW (1 SINK, 1 WC, 1 LAV, 1 STOVE) AT 1ST & (1 SINK, 1 STOVE, 1 LAV, 1 WC, 1 TUB) AT 2ND. INSTALL NEW PL (1 LAV, 1 WC) AT CEL, (1 DW, 2 BOILER, 1 TUB) AT 1ST & (1 DW, 1 LAV, 1 WC, 1 SHOWER) AT 2ND
B01255458-I1
07/18/2025
Special inspection requirement — Lighting in dwelling units
MD MOSTAFA
07/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MD MOSTAFA
07/14/2025
Special inspection requirement — Final
MD MOSTAFA
07/14/2025
Special inspection requirement — Energy Code Compliance Inspections
MD MOSTAFA
07/01/2025
Special inspection requirement — Energy Code Compliance Inspections
06/26/2025
Special inspection requirement — Final
06/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
02/20/2024
Violation issued (HPD, closed)
I
02/15/2024
Violation issued (HPD, closed)
C
06/07/2021
Violation issued (ECB, open)
Construction
06/02/2021
Violation issued (ECB, closed)
Construction
02/10/2021
Violation issued (ECB, closed)
Construction
01/05/2021
Violation issued (ECB, closed)
Construction
09/28/2020
Violation issued (ECB, closed)
Construction
11/18/2019
Violation issued (ECB, open)
Construction
10/30/2019
Violation issued (ECB, closed)
Construction
10/17/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/17/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/17/2019
Violation issued (ECB, closed)
Construction
08/07/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/07/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/29/2019
Violation issued (ECB, closed)
Construction
07/29/2019
Violation issued (ECB, open)
Construction
07/29/2019
Violation issued (ECB, closed)
Construction
05/08/2019
Violation issued (ECB, closed)
Construction
05/08/2019
Violation issued (ECB, open)
Construction
05/08/2019
Violation issued (ECB, open)
Construction
11/23/2011
Violation issued (HPD, closed)
B
11/23/2011
Violation issued (HPD, closed)
B
Latest 60 of 85 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offJOHN FITZGERALD PLBG &HTG09/29/2025
DOB NOWGeneral ConstructionSigned-offGOLDEN SAW CONSTRUCTION C08/27/2025
BISPLISSUEDBT'S PLUMBING AND HEATING05/28/2019
BISOTISSUEDKRUNFOL & KRUNFOL CONS CO03/01/2019
2 projects · most recent 10/08/2025
General Wiring
FiledStatusContractorScope
10/08/2025CompleteGREEN POWER ELECTRIC CORP—
02/21/2019Permit IssuedWCK ELECTRIC CORP.General Wiring
1 project
FiledStatusContractorScope
———1 scope_items
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
11/21/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/21/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/21/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
07/18/2025Lighting in dwelling unitsMD MOSTAFAenergy_progress
07/14/2025Fire-Resistant Penetrations and JointsMD MOSTAFAspecial
07/14/2025FinalMD MOSTAFAprogress
07/14/2025Energy Code Compliance InspectionsMD MOSTAFAprogress
07/01/2025Energy Code Compliance Inspections—progress
06/26/2025Final—progress
06/26/2025Fire-Resistant Penetrations and Joints—special
▾Documents — 38 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
09/03/2026B01247672-S1Request digital key ↗
09/03/2026B01247672-I1Request digital key ↗
08/19/2026B01255458-S1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits6
▸BISWORK PERMIT APPLICATION3
08/29/2019321912454Open ↗
06/03/2019321912454Open ↗
03/04/2019321912454Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
06/07/2019321912454Open ↗
03/04/2019321912454Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
05/23/2019321912454Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISZONING APPEAL1
06/07/2019321912454Open ↗
▸Seals & Professional Certifications12
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/19/2026B01255458-S1Open ↗
08/13/2026B01247672-I1Open ↗
08/13/2026B01255458-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/02/2026B01255458-I1Open ↗
09/02/2026B01255458-I1Open ↗
09/02/2026B01255458-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
03/04/2019321912454Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
03/04/2019321912454Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
03/04/2019321912454Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/02/2026B01255458-I1Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
06/07/2019321912454Open ↗
03/04/2019321912454Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
03/04/2019321912454Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/19/2026B01255458-S1Open ↗
08/13/2026B01247672-I1Open ↗
08/13/2026B01247672-S1Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
03/04/2019321912454Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
03/04/2019321912454Open ↗
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION3
10/30/2019321912454Open ↗
08/27/2019321912454Open ↗
06/07/2019321912454Open ↗
▸BISEFILING COVER SHEET1
03/01/2019321912454Open ↗