← Back
Elevator cooperative
255 FIELDSTON TERRACE
BRONX · BIN 2084558
💬 Discuss this project
1965Year Built
6Stories
D4Building Class
R4Zoning
85,523 sfGross Floor Area
76Units
LL97 CoveredRent Stabilized6 Open Violations ▸FISP: SWARMP
Elevator cooperative · Owner of record: 255 FIELDSTON BUYERS CORP · 41,025 sf lot · 2.08 FAR built · Flood zone X
Locations of Work
Architecture
Roof3p · 1 filing · 16 docs
Bulkhead1p · 1 filing · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
255 FIELDSTON BUYERS1403/22/2026
FIELDSTON TERRACE CORP603/22/2026
POFI CONSTRUCTION103/22/2026
G & M EQUIP LEASING LLC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
REVANS DESIGN PE PC103/10/2025
RAND ENGINEERING & ARCHITECTURE DPC403/25/2024
PAUL PERDEK, PROF. ENG. PLLC401/24/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION803/21/2026
JULIAN A. GOMEZ803/21/2026
R GERMAIN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PROTO ENTERPRISE GROUP LLGeneral Contractor303/21/2026
KOSTANDINOS TSOUKANTASElectrical203/21/2026
PROTO RESTORATION CONSTRUCTIONGeneral Contractor207/08/2026
VINCENT LOGOZZOElectrical103/21/2026
LUIS JIMENEZElectrical103/21/2026
KET ELECTRIC LLCElectrical103/22/2026
JIMENEZ LUISElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
REVANS DESIGN PE PC4617103/10/2025
RAND ENGINEERING & ARCHIT266303/25/2024
Building Lifecycle
All (101)Filed (9)Permit Issued (4)Signed Off (3)Facade (FISP) (16)Violation (46)Inspection (1)Special Inspection (22)
04/10/2026
Violation issued (HPD, closed)
B
04/10/2026
Violation issued (HPD, closed)
B
04/10/2026
Violation issued (HPD, closed)
B
04/10/2026
Violation issued (HPD, closed)
C
04/10/2026
Violation issued (HPD, closed)
B
04/10/2026
Violation issued (HPD, closed)
B
03/19/2026
Signed off — Alteration
REPLACE NEW LOW PRESSURE STEAM BOILER & (1) NEW OIL BURNER. CHANGE GRADE OF FUEL OIL FROM #4 TO #2. NO CHANGE IN MEANS OF EGRESS, USE GROUP, OR OCCUPANCY.
X01175257-I1
10/15/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
04/07/2025
Permit issued — Boiler Equipment
X01175257-I1-BE
03/10/2025
Filed — Alteration
REPLACE NEW LOW PRESSURE STEAM BOILER & (1) NEW OIL BURNER. CHANGE GRADE OF FUEL OIL FROM #4 TO #2. NO CHANGE IN MEANS OF EGRESS, USE GROUP, OR OCCUPANCY.
X01175257-I1
02/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL REVANS
02/02/2025
Special inspection requirement — Maintenance information
PAUL REVANS
02/02/2025
Special inspection requirement — HVAC-R and service water heating system controls
PAUL REVANS
02/02/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
PAUL REVANS
02/02/2025
Special inspection requirement — HVAC-R and service water heating equipment
PAUL REVANS
02/02/2025
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
PAUL REVANS
02/02/2025
Special inspection requirement — Tenant Protection Plan Compliance
PAUL REVANS
03/27/2024
Signed off — Alteration
9th Cycle FISP Repair program. No change to use, egress or occupancy.
X00749787-I1
03/25/2024
Filed — Alteration
9th Cycle FISP Repair program. No change to use, egress or occupancy.
X00749787-P2
01/03/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Yevgeniy Gurevich
01/03/2024
Special inspection requirement — Chimneys and vents
Yevgeniy Gurevich
01/03/2024
Special inspection requirement — Masonry
Yevgeniy Gurevich
01/03/2024
Special inspection requirement — Post-installed Anchors
Yevgeniy Gurevich
01/03/2024
Special inspection requirement — Energy Code Compliance Inspections
Yevgeniy Gurevich
01/03/2024
Special inspection requirement — Final
Yevgeniy Gurevich
01/03/2024
Special inspection requirement — Air barrier - visual inspection
Yevgeniy Gurevich
01/24/2023
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00697257-P3
01/12/2023
Signed off — Alteration
X00690646-I1
11/16/2022
Permit issued — General Construction
X00749787-I1-GC
11/07/2022
Filed — Alteration
9th Cycle FISP Repair program. No change to use, egress or occupancy.
X00749787-P1
11/04/2022
Special inspection requirement — Masonry
Yevgeniy Gurevich
11/04/2022
Special inspection requirement — Air barrier - visual inspection
Yevgeniy Gurevich
11/04/2022
Special inspection requirement — Final
Yevgeniy Gurevich
11/04/2022
Special inspection requirement — Energy Code Compliance Inspections
Yevgeniy Gurevich
11/04/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Yevgeniy Gurevich
11/04/2022
Special inspection requirement — Chimneys and vents
Yevgeniy Gurevich
11/04/2022
Special inspection requirement — Post-installed Anchors
Yevgeniy Gurevich
10/10/2022
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00697257-P2
09/28/2022
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00697257-P1
08/05/2022
Filed — Alteration
9th Cycle FISP Repair program. No change to use, egress or occupancy.
X00749787-I1
06/03/2022
Permit issued — General Construction
X00690646-I1-GC
05/20/2022
Permit issued — Sidewalk Shed
X00697257-I1-SH
05/16/2022
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00697257-I1
03/23/2022
Filed — Alteration
X00690646-I1
03/02/2022
Special inspection requirement — Final
Yevgeniy Gurevich
06/25/2021
Cycle 9 facade report submitted
05/19/2021
Cycle 9 facade inspection completed
05/19/2021
Cycle 9 facade report signed — SWARMP
05/24/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/24/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/04/2018
Cycle 8 facade report submitted
06/01/2018
Cycle 8 facade report signed — SAFE
05/22/2018
Cycle 8 facade inspection completed
05/26/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/26/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/07/2017
Cycle 8 facade report submitted
02/07/2017
Cycle 8 facade report signed — UNSAFE
02/07/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/05/2017
Cycle 8 facade inspection completed
06/01/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 101 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offMARLANDE HEATING CORP04/07/2025
DOB NOWGeneral ConstructionSigned-offPROTO RESTORATION CONSTRU11/16/2022
DOB NOWGeneral ConstructionSigned-offPROTO RESTORATION CONSTRU06/03/2022
DOB NOWSidewalk ShedPermit IssuedPROTO ENTERPRISE GROUP LL05/20/2022
BISOTISSUEDPROTO RESTORATION CONSTRUCTION03/26/2018
BISEQISSUEDG & M EQUIPMENT LEASING L03/21/2018
BISOTISSUEDPROTO RESTORATION CONSTRUCTION03/28/2017
BISEQISSUEDG & M EQUIPMENT LEASING L02/23/2017
BISOTISSUEDPOFI CONSTRUCTION CORP12/05/2012
BISEQISSUEDEVEREST SCAFFOLDING INC06/08/2012
BISOTISSUEDPOFI CONSTRUCTION CORP05/30/2012
BISEQISSUEDCS BRIDGE CORP04/20/2012
BISOTISSUEDRCD RESTORATIONS INC08/01/2007
BISEQISSUEDEMPIRE SCAFFOLDING SYSTEM07/25/2007
BISOTISSUEDRCD RESTORATIONS INC12/18/2003
BISOTISSUEDRCD RESTORATIONS INC09/10/2003
6 projects · most recent 05/28/2026
General Wiring Boiler Controls
FiledStatusContractorScope
05/28/2026Permit IssuedMAXIMUM ELECTRIC CORP.Boiler Controls
04/22/2025Permit IssuedABILENE ELECTRIC INC—
04/02/2025CompleteKET ELECTRIC LLCGeneral Wiring
12/13/2023CompleteKET ELECTRIC LLCGeneral Wiring
10/23/2023CompleteASTRO ELECL CONTNG INCGeneral Wiring
05/23/2022Permit IssuedHIGH QUALITY ELECTRIC OF—
1 project · most recent 01/24/2023
Sidewalk Shed
FiledStatusContractorScope
01/24/2023Permit IssuedPROTO ENTERPRISE GROUP LLSidewalk Shed
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
10/15/2025Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
02/02/2025Fire-Resistant Penetrations and JointsPAUL REVANSspecial
02/02/2025Maintenance informationPAUL REVANSenergy_progress
02/02/2025HVAC-R and service water heating system controlsPAUL REVANSenergy_progress
02/02/2025HVAC-R and service water piping design and insulationPAUL REVANSenergy_progress
02/02/2025HVAC-R and service water heating equipmentPAUL REVANSenergy_progress
02/02/2025Fuel-Oil Storage and Fuel-Oil Piping SystemsPAUL REVANSspecial
02/02/2025Tenant Protection Plan CompliancePAUL REVANSspecial
01/03/2024Structural Stability – Alterations of existing buildingsYevgeniy Gurevichspecial
01/03/2024Chimneys and ventsYevgeniy Gurevichspecial
01/03/2024MasonryYevgeniy Gurevichspecial
01/03/2024Post-installed AnchorsYevgeniy Gurevichspecial
01/03/2024Energy Code Compliance InspectionsYevgeniy Gurevichprogress
01/03/2024FinalYevgeniy Gurevichprogress
01/03/2024Air barrier - visual inspectionYevgeniy Gurevichenergy_progress
11/04/2022MasonryYevgeniy Gurevichspecial
11/04/2022Air barrier - visual inspectionYevgeniy Gurevichenergy_progress
11/04/2022FinalYevgeniy Gurevichprogress
11/04/2022Energy Code Compliance InspectionsYevgeniy Gurevichprogress
11/04/2022Structural Stability – Alterations of existing buildingsYevgeniy Gurevichspecial
11/04/2022Chimneys and ventsYevgeniy Gurevichspecial
11/04/2022Post-installed AnchorsYevgeniy Gurevichspecial
03/02/2022FinalYevgeniy Gurevichprogress
▾Documents — 159 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/24/2026X00690646-I1Request digital key ↗
08/24/2026X00749787-I1Request digital key ↗
08/24/2026X00749787-P1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits32
▸BISPLAN / WORK APPROVAL APPLICATION21
10/01/2024240174262Open ↗
09/13/2024200802435Open ↗
09/12/2024200802435Open ↗
Showing 3 of 21 on file for this type
▸BISWORK PERMIT APPLICATION9
04/02/2018220461729Open ↗
03/22/2018240174262Open ↗
03/28/2017220461729Open ↗
Showing 3 of 9 on file for this type
▸BISAFTER-HOUR WORK PERMIT APPLICATION2
09/04/2012220205748Open ↗
08/14/2012220205748Open ↗
▸Seals & Professional Certifications46
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION14
03/29/2017220461729Open ↗
09/16/2016220461729Open ↗
09/16/2016220461729Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/24/2026X00690646-I1Open ↗
08/24/2026X00749787-P1Open ↗
08/24/2026X00749787-P2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
08/28/2026X00690646-I1Open ↗
08/27/2026X00749787-P2Open ↗
08/27/2026X00749787-P2Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
06/12/2012220209977Open ↗
04/21/2012220140568Open ↗
07/25/2007210006875Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
06/12/2012220209977Open ↗
04/21/2012220140568Open ↗
07/12/2007210004476Open ↗
▸BISTECHNICAL REPORT: STATEMENT OF RESPONSIBILITY3
07/25/2007210006875Open ↗
07/12/2007210004476Open ↗
02/22/2017240174262Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/27/2026X00749787-P2Open ↗
08/25/2026X01175257-I1Open ↗
08/22/2026X00749787-P1Open ↗
▸BISPC FULL REPORT2
07/25/2007210006875Open ↗
07/12/2007210004476Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
02/22/2017240174262Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
02/22/2017240174262Open ↗
▸Safety & Tenant Protection4
▸BISTENANT PROTECTION PLAN AND NOTES4
09/25/2024200802435Open ↗
06/25/2024210006875Open ↗
02/22/2017240174262Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/24/2026X00690646-I1Open ↗
08/24/2026X00749787-P1Open ↗
08/24/2026X00749787-P2Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
07/25/2007210006875Open ↗
07/12/2007210004476Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
03/28/2017220461729Open ↗
07/15/2013220239506Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
11/08/2012220239506Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
05/21/2012220205748Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
09/16/2016220461729Open ↗
06/15/2013220239506Open ↗
06/15/2013220205748Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
06/15/2013220239506Open ↗
06/15/2013220205748Open ↗
12/12/2012220205748Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
02/22/2017240174262Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
10/13/2023220461729Open ↗
▸BISTECHNICAL REPORT: ENERGY1
05/21/2012220205748Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026X00749787-I1Open ↗
▸Inspections & Test Reports8
▸BISCONCRETE - CAST-IN-PLACE1
10/13/2023220461729Open ↗
▸BISMASONRY1
10/13/2023220461729Open ↗
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19751
08/05/2024200802435Open ↗
▸BISPOST-INSTALLED ANCHORS1
10/13/2023220461729Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
02/22/2017240174262Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
03/28/2017220461729Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
10/13/2023220461729Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
10/13/2023220461729Open ↗
▸Approvals, Objections & Sign-offs23
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
09/30/2024200802435Open ↗
06/27/2024210006875Open ↗
06/15/2013220239506Open ↗
Showing 3 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
08/07/2024200802435Open ↗
06/15/2013220239506Open ↗
06/15/2013220205748Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
11/08/2012220239506Open ↗
06/12/2012220209977Open ↗
05/18/2012220205748Open ↗
Showing 3 of 6 on file for this type
▸BISFINAL1
10/13/2023220461729Open ↗
▸BISSHED LETTER1
03/22/2018240174262Open ↗
▸BISCERTIFICATE OF OCCUPANCY / LETTER OF COMPLETION FOLDER REVIEW REQUEST1
11/16/2007210004476Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT6
09/16/2016220461729Open ↗
06/15/2013220239506Open ↗
06/15/2013220205748Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms8
▸BISEFILING COVER SHEET5
09/16/2016220461729Open ↗
11/08/2012220239506Open ↗
06/12/2012220209977Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION2
03/17/2017220461729Open ↗
10/03/2012220209977Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
02/22/2017240174262Open ↗