← Back
BuildNYC
Elevator cooperative
255 FT WASHINGTON AVENUE
MANHATTAN · BIN 1063414
💬 Discuss this project
1946Year Built
6Stories
D4Building Class
R8Zoning
44,574 sfGross Floor Area
37Units
LL97 CoveredRent Stabilized22 Active Violations ▸FDNY Report ↗
Elevator cooperative · Owner of record: 255 Tenants · 9,776 sf lot · 4.56 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Unit 12p · 1 filing · 6 docs
CellarBeach Lane Management6p · 1 filing · 10 docs
Site & exteriorInstallation of heavy duty sidewalk shed8p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
255 Tenants703/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ashraf207/09/2025
Moore Associates405/01/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Sheikh Expediting403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Geo USA ConstructionScaffold304/09/2026
Beach Lane ManagementGeneral Contractor203/21/2026
Hay Mechanical SolutionsPlumbing207/08/2026
E.S.B. ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Moore Engineering of NY9134405/01/2024
Building Lifecycle
07/11/2026
Permit expired, never signed off — Supported Scaffold
The city's record still shows this permit as issued, with no sign-off on its filing
M01211304-S1-SF
06/19/2026
§ 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT CEILING AND ALL WALLS IN THE KITCHEN LOCATED AT APT…
HPD violation · open
06/19/2026
§ 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT CEILING AND ALL WALLS IN THE 6th ROOM FROM NORTH…
HPD violation · open
06/19/2026
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 31, 3rd STORY, 3rd APARTMENT FROM WEST…
HPD violation · open
06/19/2026
§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION PIPE RISER IN THE PRIVATE HALLWAY LOCATED AT APT 31, 3rd STORY, 3rd APARTMENT…
HPD violation · open
179 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldPermit IssuedGeo USA Construction07/11/2025
DOB NOWSidewalk ShedPermit IssuedGeo USA Construction04/21/2025
DOB NOWPlumbingSigned-offHay Mechanical Solutions01/29/2024
DOB NOWGeneral ConstructionSigned-offBeach Lane Management12/19/2023
BISMHISSUEDEast Harlem Construction04/23/2019
BISPLISSUEDBranch Plumbing11/05/2018
BISOTISSUEDEast Harlem Construction10/02/2018
BISPLISSUEDPlumbing NYC05/31/2017
BISPLISSUEDThe Plumbing Company12/07/2011
BISOTISSUEDBeach Lane Management11/15/2011
BISPLISSUEDThe Plumbing Company06/28/2011
BISOTISSUEDBeach Lane Management06/17/2011
BISOTISSUEDBeach Lane Management08/25/2010
BISPLISSUEDThe Plumbing Company12/09/2009
BISOTISSUEDBeach Lane Management11/19/2009
BISPLISSUEDThe Plumbing Company10/21/2009
BISOTISSUEDBeach Lane Management03/10/2009
BISOTISSUEDBeach Lane Management02/04/2009
BISPLISSUEDThe Plumbing Company07/02/2008
BISPLISSUEDThe Plumbing Company05/07/2008
BISOTISSUEDBeach Lane Management04/21/2008
BISPLISSUEDThe Plumbing Company04/14/2008
BISOTISSUEDBeach Lane Management04/04/2008
BISPLISSUEDThe Plumbing Company09/14/2007
BISOTISSUEDBeach Lane Management09/11/2007
BISPLISSUEDIhope Plumbing and Heating Co11/29/2004
BISOTISSUEDIhope Plumbing and Heating Co11/29/2004
BISOTISSUEDI Hope Plumbing Heat. Co05/17/2004
BISOTISSUEDBeach Lane Management01/29/1998
BISFBISSUEDStar Industrial Service11/21/1995
1 project · most recent 12/11/2023
Gas Water/Sanitary
FiledStatusContractorScope
12/11/2023——Gas, Water/Sanitary
1 project · most recent 05/16/2019
General Wiring
FiledStatusContractorScope
05/16/2019CompleteV. Vass ElectricGeneral Wiring
1 project · most recent 07/09/2025
Scaffold Sidewalk Shed
FiledStatusContractorScope
07/09/2025Permit IssuedGeo USA ConstructionScaffold, Sidewalk Shed
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
04/24/2024Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
04/24/2024Certified Sprinkler (PL) - SP - RoughingCertifiedView ↗
03/21/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/21/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/21/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
05/02/2024Fire-Resistant Penetrations and JointsJAMES MOOREspecial
05/02/2024Tenant Protection Plan ComplianceJAMES MOOREspecial
05/01/2024Fire-Resistant Penetrations and JointsJAMES MOOREspecial
05/01/2024Tenant Protection Plan ComplianceJAMES MOOREspecial
12/08/2023Fire-Resistant Penetrations and JointsJAMES MOOREspecial
12/08/2023Tenant Protection Plan ComplianceJAMES MOOREspecial
199 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account