← Back
Miscellaneous two family
255 MACON STREET
BROOKLYN · BIN 3053113
💬 Discuss this project
1910Year Built
3Stories
B9Building Class
R6BZoning
3,046 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Miscellaneous two family · 1,917 sf lot · 1.59 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Floor 33p · 2 filings · 20 docs
Floor 22p · 2 filings · 20 docs
Floor 15p · 3 filings · 20 docs
Cellar8p · 5 filings · 20 docs
Basement1p · 1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CONTRACTING CORP QUIZHPE303/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/05/2025$2.5M—255 MACON EVERYDAY LLC → Private party$813/sf building
07/24/2019$1.3M—— → —$427/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EC BUILDING CONSULTANTS2403/21/2026
CBA CONSULTANTS203/21/2026
BROOKLYN SOLARWORKS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
QUIZHPE CONTRACTING CORPGeneral Contractor907/08/2026
LEFKES WATER WORKS INCPlumbing407/08/2026
MOKEN HOME IMPROVEMENTGeneral Contractor203/21/2026
ARC ELECTRICAL & MECH CONElectrical103/21/2026
BROOKLYN SOLARWORKS LLCGeneral Contractor107/08/2026
FRANK FODERAElectrical103/21/2026
STEVEN BURKEElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM ENGINEERING PLLC6244109/09/2025
ACE STRUCTURAL ENGINEERIN4961112/09/2024
BRIAN E. FLYNN, PE, PC2837207/18/2024
M. INT'L ENGINEERING PLLC3129107/18/2024
Building Lifecycle
All (105)Filed (14)Permit Issued (13)Signed Off (7)Violation (15)Inspection (6)Objection (20)Special Inspection (30)
11/14/2025
Signed off — Alteration
INSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B01280589-I1
10/30/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/20/2025
Signed off — Alteration CO
APPLICATION FILED TO REMOVE COMMENTS FROM "CO COMMENTS SECTION" AS REQUESTED BY COMMISSIONER. ALL WORK HAS BEEN COMPLETED AND INSPECTED UNDER INITIAL FILING B00581717-I1. THERE ARE NO CHANGES TO APPROVED DRAWINGS B00581717-I1.
B00581717-S1
09/12/2025
Permit issued — Solar
B01280589-I1-SL
09/09/2025
Filed — Alteration
INSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B01280589-I1
09/02/2025
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
09/02/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
NARESH MAHANGU
09/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
09/02/2025
Special inspection requirement — Air barrier - visual inspection
NARESH MAHANGU
09/02/2025
Special inspection requirement — Final
NARESH MAHANGU
08/18/2025
Permit issued — General Construction
B00581717-S1-GC
05/12/2025
Objection resolved — Addressed
03/13/2025
Objection raised — Scope
03/06/2025
Filed — Alteration CO
APPLICATION FILED TO REMOVE COMMENTS FROM "CO COMMENTS SECTION" AS REQUESTED BY COMMISSIONER. ALL WORK HAS BEEN COMPLETED AND INSPECTED UNDER INITIAL FILING B00581717-I1. THERE ARE NO CHANGES TO APPROVED DRAWINGS B00581717-I1.
B00581717-S1
01/28/2025
Signed off — Alteration
B00559611-I1
12/23/2024
Signed off — Alteration
Install new Split HVAC Systems throughout dwelling units, no change in use egress or occupancy.
B00682477-I1
12/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANTHONY UGBEBOR
12/20/2024
Special inspection requirement — Final
ANTHONY UGBEBOR
12/20/2024
Special inspection requirement — Maintenance information
ANTHONY UGBEBOR
12/20/2024
Special inspection requirement — Energy Code Compliance Inspections
ANTHONY UGBEBOR
12/20/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
ANTHONY UGBEBOR
12/20/2024
Special inspection requirement — HVAC-R and service water heating system controls
ANTHONY UGBEBOR
12/20/2024
Special inspection requirement — HVAC-R and service water heating equipment
ANTHONY UGBEBOR
12/20/2024
Special inspection requirement — Mechanical Systems
ANTHONY UGBEBOR
12/16/2024
Signed off — Alteration
Modifications to plumbing fixtures as shown on drawings.
B00579077-I1
12/13/2024
Signed off — Alteration
B00483426-I1
12/11/2024
Objection resolved — Addressed
12/10/2024
Objection raised — Zoning
12/09/2024
Filed — Alteration
Install new Split HVAC Systems throughout dwelling units, no change in use egress or occupancy.
B00682477-P2
11/27/2024
Permit issued — Plumbing
B00579077-I1-PL
11/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANTHONY UGBEBOR
11/26/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
ANTHONY UGBEBOR
11/26/2024
Special inspection requirement — Maintenance information
ANTHONY UGBEBOR
11/26/2024
Special inspection requirement — HVAC-R and service water heating equipment
ANTHONY UGBEBOR
11/26/2024
Special inspection requirement — HVAC-R and service water heating system controls
ANTHONY UGBEBOR
11/26/2024
Special inspection requirement — Final
ANTHONY UGBEBOR
11/26/2024
Special inspection requirement — Energy Code Compliance Inspections
ANTHONY UGBEBOR
11/26/2024
Special inspection requirement — Mechanical Systems
ANTHONY UGBEBOR
10/22/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/07/2024
Special inspection requirement — Energy Code Compliance Inspections
ANTHONY UGBEBOR
10/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANTHONY UGBEBOR
10/07/2024
Special inspection requirement — Maintenance information
ANTHONY UGBEBOR
10/07/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
ANTHONY UGBEBOR
10/07/2024
Special inspection requirement — HVAC-R and service water heating equipment
ANTHONY UGBEBOR
10/07/2024
Special inspection requirement — HVAC-R and service water heating system controls
ANTHONY UGBEBOR
09/30/2024
Objection resolved — Addressed
09/11/2024
Signed off — Alteration
PROPOSED STRUCTURAL WORK FOR HORIZONTAL EXTENSION AT REAR OF BUILDING AND REFRAMING OR SECOND FLOOR WOOD JOISTS.
B00559481-I1
09/06/2024
Objection raised — Admin
08/28/2024
Filed — Alteration
Modifications to plumbing fixtures as shown on drawings.
B00579077-P1
07/25/2024
Special inspection requirement — Fire-Resistance Rated Construction
ANTHONY UGBEBOR
07/25/2024
Special inspection requirement — Fenestration air leakage
ANTHONY UGBEBOR
07/25/2024
Special inspection requirement — Insulation placement and R values
ANTHONY UGBEBOR
07/18/2024
Filed — Alteration
B00483426-P1
06/20/2024
Permit issued — Plumbing
B00579077-I1-PL
06/20/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/12/2023
Permit issued — General Construction
B00483426-I1-GC
09/11/2023
Permit issued — General Construction
B00483426-I1-GC
06/16/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/16/2023
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
06/16/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
Latest 60 of 105 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offBROOKLYN SOLARWORKS LLC09/12/2025
DOB NOWGeneral ConstructionSigned-offQUIZHPE CONTRACTING08/18/2025
DOB NOWPlumbingSigned-offLEFKES WATER WORKS INC11/27/2024
DOB NOWPlumbingSigned-offLEFKES WATER WORKS INC06/20/2024
DOB NOWGeneral ConstructionSigned-offQUIZHPE CONTRACTING09/12/2023
DOB NOWGeneral ConstructionSigned-offQUIZHPE CONTRACTING09/11/2023
DOB NOWPlumbingSigned-offLEFKES WATER WORKS INC04/27/2023
DOB NOWMechanical SystemsSigned-offMOKEN HOME IMPROVEMENT11/16/2022
DOB NOWStructuralSigned-offQUIZHPE CONTRACTING08/11/2022
DOB NOWFoundationSigned-offQUIZHPE CONTRACTING08/03/2022
DOB NOWPlumbingSigned-offLEFKES WATER WORKS INC03/31/2022
DOB NOWGeneral ConstructionSigned-offQUIZHPE CONTRACTING02/17/2022
DOB NOWGeneral ConstructionSigned-offQUIZHPE CONTRACTING02/10/2022
BISPLISSUEDDAVID JABLON04/14/2008
1 project · most recent 03/16/2022
FiledStatusContractorScope
03/16/2022———
2 projects · most recent 09/02/2025
General Wiring
FiledStatusContractorScope
09/02/2025CompleteBROOKYLN SOLARWORKS, LLC—
01/13/2025CompletePAPPAS & FODERA ELECT'LGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
10/30/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/22/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/20/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/16/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/16/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
06/16/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 60
DateRequirementInspectorRole
09/02/2025Energy Code Compliance InspectionsNARESH MAHANGUprogress
09/02/2025Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
09/02/2025Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
09/02/2025Air barrier - visual inspectionNARESH MAHANGUenergy_progress
09/02/2025FinalNARESH MAHANGUprogress
12/20/2024Fire-Resistant Penetrations and JointsANTHONY UGBEBORspecial
12/20/2024FinalANTHONY UGBEBORprogress
12/20/2024Maintenance informationANTHONY UGBEBORenergy_progress
12/20/2024Energy Code Compliance InspectionsANTHONY UGBEBORprogress
12/20/2024HVAC-R and service water piping design and insulationANTHONY UGBEBORenergy_progress
12/20/2024HVAC-R and service water heating system controlsANTHONY UGBEBORenergy_progress
12/20/2024HVAC-R and service water heating equipmentANTHONY UGBEBORenergy_progress
12/20/2024Mechanical SystemsANTHONY UGBEBORspecial
11/26/2024Fire-Resistant Penetrations and JointsANTHONY UGBEBORspecial
11/26/2024HVAC-R and service water piping design and insulationANTHONY UGBEBORenergy_progress
11/26/2024Maintenance informationANTHONY UGBEBORenergy_progress
11/26/2024HVAC-R and service water heating equipmentANTHONY UGBEBORenergy_progress
11/26/2024HVAC-R and service water heating system controlsANTHONY UGBEBORenergy_progress
11/26/2024FinalANTHONY UGBEBORprogress
11/26/2024Energy Code Compliance InspectionsANTHONY UGBEBORprogress
11/26/2024Mechanical SystemsANTHONY UGBEBORspecial
10/07/2024Energy Code Compliance InspectionsANTHONY UGBEBORprogress
10/07/2024Fire-Resistant Penetrations and JointsANTHONY UGBEBORspecial
10/07/2024Maintenance informationANTHONY UGBEBORenergy_progress
10/07/2024HVAC-R and service water piping design and insulationANTHONY UGBEBORenergy_progress
Latest 25 of 60.
▾Documents — 116 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
09/01/2026B00483426-I1Request digital key ↗
09/01/2026B00483426-P1Request digital key ↗
09/01/2026B00559481-P1Request digital key ↗
Showing 3 of 14 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026B00483426-P1Open ↗
08/13/2026B00483426-I1Open ↗
▸Seals & Professional Certifications65
▸DOB NOWProgress Inspector Seal & Signature34
09/05/2026B00559481-P1Open ↗
09/02/2026B00483426-P1Open ↗
09/02/2026B00483426-P1Open ↗
Showing 3 of 34 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature17
09/05/2026B00559481-P1Open ↗
09/05/2026B00559481-P1Open ↗
09/05/2026B00559481-P1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
09/01/2026B00483426-P1Open ↗
09/01/2026B00483426-I1Open ↗
09/01/2026B00559481-I1Open ↗
Showing 3 of 14 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026B00581717-I1Open ↗
08/13/2026B00581717-S1Open ↗
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-5: Asbestos Assessment Report14
09/01/2026B00483426-I1Open ↗
09/01/2026B00483426-P1Open ↗
09/01/2026B00559481-I1Open ↗
Showing 3 of 14 on file for this type
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026B00483426-I1Open ↗
08/13/2026B00579077-I1Open ↗
08/31/2026B00682477-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/13/2026B00483426-I1Open ↗
08/13/2026B00483426-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00483426-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026B00483426-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01280589-I1Open ↗
▸Cost, Insurance & Ownership2
▸DOB NOWCertification by Insurance Broker or Agency1
08/13/2026B00483426-I1Open ↗
▸DOB NOWCertificate of Insurance1
08/13/2026B00483426-I1Open ↗
▸Other Documents9
▸DOB NOWPlot Diagram3
08/13/2026B00559611-I1Open ↗
08/13/2026B00483426-I1Open ↗
08/13/2026B00483426-P1Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026B00483426-I1Open ↗
08/13/2026B00483426-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026B00483426-P1Open ↗
08/13/2026B00483426-I1Open ↗
▸DOB NOWAdditional Insured Authorizations1
08/13/2026B00483426-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026B00581717-I1Open ↗