ECB11/19/2021FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTE:AT TIME OF INSPECTION OBSERVED AT ROOF LEVEL OPEN CRACKED BRICK JOINTS AT CHIMNEY IN MULTIPLE LOCATIONS AT EXP #1 EAST ELEVATION (GRAND AVE) OPEN BRICKNothing owed — awaiting certificate of correction
ECB02/13/2020SITE SAFETY MANAGER FIALED TO IMMEDIATELY NOTIFY THE DEPARTMENT OF CONDITIONS AS REQUIRED.NOTE:AT THE TIME OF INSPECTION OBSERVED A 34 STY USEING CRANE TO LIFTING CONSTRUCITON MATERIALS(REBARS,CMU BLOCK ETC)SWINothing owed — awaiting certificate of correction
ECB03/18/20052Nothing owed — awaiting certificate of correction
ECB03/18/200550A/50B 50A-NO LOG BOOK OF PLANT OPERATIONS KEPT 50B-THE ENGINEER LEFTBOILER ROOM BUILDING TWICE WHILE I WAS PEFORMING MY INSPECTIONNothing owed — awaiting certificate of correction
ECB03/18/20052Nothing owed — awaiting certificate of correction
ECB09/23/1992FAILURE TO PROVIDE ELEVATOR LANDING SIGNS. FAILURE TO PROVIDE ELEVATOR I.D. SIGNS. REMEDY: INSTALL SIGNS AS PER CODE LL16/84Nothing owed — awaiting certificate of correction
ECB09/10/1991NEW BUILDING OCCUPIED WITHOUT A CERTIFICATE OF OCCUPANCY AS REQUIRED UNDER NEW BUILD APPL.#364/86. REMEDY:OBTAIN A CERTIFICATE OF OCCUPANCYAS REQUIRED OR DISCONTINUE THE UNLAWFUL USE.Nothing owed — awaiting certificate of correction
ECB08/01/1991FAILURE TO PROVIDE ELEVATOR LANDING SIGNS. FAILURE TO PROVIDE NUMBER SIGNS ON EXIT DOORS. FAILURE TO PROVIDE STAIR IDENTIFICATION SIGNS. REMEDY-PROVIDE PROPER SIGNAGE AS PER L.L. 16/84.Nothing owed — awaiting certificate of correction
ECB07/29/1991FAILURE TO FILE A REPORT OF COMPLIANCE WITH LOCAL LAW 16/84-CERTIFYINGTO THE INSTALLATION OF REQUIRED FIRE PROTECTION SYSTEMS. REMEDY:FILE REPORT.Nothing owed — awaiting certificate of correction
ECB02/04/1991FAILURE TO PROVIDE ELEVT. LANDINGS SIGNS REMEDY - PROVIDE ELEVT. LAND. SIGNS FAILURE TO PROVIDE # SIGNS ON STAIR DOORS.ACCORDING TO LL16/84 REMEDY - PROVIDE APPROPRIATE FLOOR SIGNS ON DOORS. FAILURE TO ROVIDE SNothing owed — awaiting certificate of correction
Miscellaneous educational facility · 140,000 sf lot · 2.08 FAR built · Flood zone X