← Back
BuildNYC
Two family brick
255 STUYVESANT AVENUE
BROOKLYN · BIN 3045469
💬 Discuss this project
1899Year Built
3Stories
B1Building Class
R6BZoning
3,920 sfGross Floor Area
2Units
0 Active ViolationsFDNY Report ↗
Two family brick · 1,900 sf lot · 2.06 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 324p · 4 filings · 20 docs
Floor 221p · 4 filings · 20 docs
Floor 121p · 4 filings · 20 docs
Cellar25p · 4 filings · 20 docs
Basement1p · 1 filing · 7 docs
Sub-Basement21p · 4 filings · 20 docs
Site & exterior5p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Jonathan Kennedy As Trust503/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/10/2024$3.3M—Private party → Private party$842/sf building
07/15/2022$1.9M—Private party → Private party$472/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LWL Associates701/30/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Prime Zone Building Consulting403/21/2026
Build Team603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Morell Buildersspecialty_contractor303/21/2026
Joseph Weinstein ElectricElectrical103/22/2026
Morell BuildersGeneral Contractor107/08/2026
All Pro Plumbing & HeatingFire Protection107/08/2026
DJ International PlumbingPlumbing107/08/2026
Rigid PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL Engineering6781510/25/2023
Building Lifecycle
02/23/2024
Signed off — Alteration
PLUMBING WORK. AS PER PLANS. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B08004630-I1
02/12/2024
Signed off — Alteration
PROVIDE NEW FIRE SPRINKLER SYSTEM THROUGHOUT TWO DWELLING UNITS RESIDENTIAL BUILDING.
B08022298-I1
02/06/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/06/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/30/2024
Filed — Alteration
PLUMBING WORK. AS PER PLANS. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B08004630-P1
53 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offRigid Plumbing09/06/2023
DOB NOWMechanical SystemsSigned-offMorell Builders07/25/2023
DOB NOWSprinklersSigned-offAll Pro Plumbing & Heating04/04/2023
DOB NOWPlumbingSigned-offDJ International Plumbing02/22/2023
DOB NOWGeneral ConstructionSigned-offMorell Builders11/10/2022
1 project · most recent 11/03/2023
General Wiring
FiledStatusContractorScope
11/03/2023CompleteJoseph Weinstein ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
02/06/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/06/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/14/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/03/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/01/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/24/2023Pass-Final General Construction Non-Directive 14PassView ↗
08/21/2023Fail-Final General Construction Non-Directive 14FailView ↗
03/20/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/10/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
01/30/2024HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
01/30/2024HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
01/30/2024HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
01/30/2024Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
10/25/2023Sprinkler SystemsCHRISTIAN LOZADAspecial
08/15/2023HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
08/15/2023HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
08/15/2023HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
08/15/2023Heating SystemsCHRISTIAN LOZADAspecial
08/15/2023Mechanical SystemsCHRISTIAN LOZADAspecial
08/15/2023Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
08/15/2023FinalCHRISTIAN LOZADAprogress
08/15/2023Shutoff dampersCHRISTIAN LOZADAenergy_progress
09/15/2022Fenestration air leakageCHRISTIAN LOZADAenergy_progress
09/15/2022Interior lighting powerCHRISTIAN LOZADAenergy_progress
09/15/2022Fenestration areasCHRISTIAN LOZADAenergy_progress
09/15/2022Fenestration and door U-factor and product ratingsCHRISTIAN LOZADAenergy_progress
09/15/2022Insulation placement and R valuesCHRISTIAN LOZADAenergy_progress
09/15/2022Air barrier - visual inspectionCHRISTIAN LOZADAenergy_progress
09/15/2022Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
09/15/2022Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
28 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account