← Back
Miscellaneous two family
255 WOODBINE STREET
BROOKLYN · Bushwick (East) · BIN 3076652
💬 Discuss this project
1931Year Built
3Stories
B9Building Class
R6Zoning
2,634 sfGross Floor Area
2Units
Rent Stabilized3 Open Violations ▸FDNY Report ↗
Miscellaneous two family · 1,950 sf lot · 1.35 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC BUILDING SOLUTIONS CO103/22/2026
DECKER DEVELOPMENT203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/30/2022$1.8M—— → —$687/sf building
10/05/2021$870K—— → —$330/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHUN ENGINEERING CONSULTANT PLLC209/02/2022
DOYUN KIM; RA306/08/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC BUILDING SOLUTIONS503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NYC BUILDING SOLUTIONS COGeneral Contractor603/21/2026
HORBRIDGE PLUMBING & HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DOYUN KIM; RA7415409/02/2022
Building Lifecycle
All (45)Filed (5)Permit Issued (3)Signed Off (3)Violation (4)Inspection (4)Objection (24)Special Inspection (2)
11/24/2025
Violation issued (HPD, open)
I
12/04/2024
Violation issued (HPD, open)
I
11/28/2023
Violation issued (HPD, open)
I
10/19/2022
Signed off — Alteration
HEREWITH FILING TO INSTALL PLUMBING SYSTEM AS PER CONSTRUCTION PLANS. IN CONJUNCTION WITH DOB NOW #B00652787.
B00644963-I1
10/19/2022
Signed off — Alteration
HEREWITH TO PROPOSE TO RELAMINATE EXISTING WALLS, NEW GYP BOARD, UPDATE WINDOWS AND FINISHES AS PER PLANS. TO EXISTING 3 STORY, 2 FAMILY DWELLING. NO CHANGE IN USE, EGRESS OR OCCUPANCY .
B00652787-I1
09/21/2022
Signed off — Alteration
B00607006-I1
09/02/2022
Filed — Alteration
HEREWITH FILING TO INSTALL PLUMBING SYSTEM AS PER CONSTRUCTION PLANS. IN CONJUNCTION WITH DOB NOW #B00652787.
B00644963-P1
09/02/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
DOYUN KIM
09/02/2022
Special inspection requirement — Energy Code Compliance Inspections
DOYUN KIM
08/24/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/13/2022
Objection resolved — Addressed
06/13/2022
Objection resolved — Addressed
06/09/2022
Objection raised — Scope
06/09/2022
Objection raised — Other
06/08/2022
Filed — Alteration
HEREWITH TO PROPOSE TO RELAMINATE EXISTING WALLS, NEW GYP BOARD, UPDATE WINDOWS AND FINISHES AS PER PLANS. TO EXISTING 3 STORY, 2 FAMILY DWELLING. NO CHANGE IN USE, EGRESS OR OCCUPANCY .
B00652787-P1
05/16/2022
Violation issued (ECB, closed)
Construction
03/18/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/18/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/18/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/03/2022
Permit issued — Plumbing
B00644963-I1-PL
01/25/2022
Filed — Alteration
HEREWITH FILING TO INSTALL PLUMBING SYSTEM AS PER CONSTRUCTION PLANS. IN CONJUNCTION WITH DOB NOW #B00652787.
B00644963-I1
01/22/2022
Permit issued — General Construction
B00652787-I1-GC
01/06/2022
Objection resolved — Addressed
01/06/2022
Objection resolved — Addressed
01/06/2022
Objection resolved — Addressed
01/06/2022
Objection resolved — Addressed
01/06/2022
Objection resolved — Addressed
01/06/2022
Objection resolved — Addressed
01/06/2022
Objection resolved — Addressed
01/06/2022
Objection resolved — Addressed
01/06/2022
Objection resolved — Addressed
01/06/2022
Objection resolved — Addressed
01/04/2022
Objection raised — Other
01/04/2022
Objection raised — Other
01/04/2022
Objection raised — Other
01/04/2022
Objection raised — Scope
01/04/2022
Objection raised — Zoning
01/04/2022
Objection raised — Fire_Protection
01/04/2022
Objection raised — Fire_Protection
01/04/2022
Objection raised — Fire_Protection
01/04/2022
Objection raised — Cost
01/04/2022
Objection raised — Fire_Protection
01/03/2022
Filed — Alteration
HEREWITH TO PROPOSE TO RELAMINATE EXISTING WALLS, NEW GYP BOARD, UPDATE WINDOWS AND FINISHES AS PER PLANS. TO EXISTING 3 STORY, 2 FAMILY DWELLING. NO CHANGE IN USE, EGRESS OR OCCUPANCY .
B00652787-I1
10/21/2021
Permit issued — Construction Fence
B00607006-I1-FN
10/07/2021
Filed — Alteration
B00607006-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offHORBRIDGE PLUMBING & HEAT02/03/2022
DOB NOWGeneral ConstructionSigned-offNYC BUILDING SOLUTIONS CO01/22/2022
DOB NOWConstruction FenceSigned-offNYC BUILDING SOLUTIONS CO10/21/2021
1 project · most recent 10/25/2022
General Wiring
FiledStatusContractorScope
10/25/2022CompleteRONEY ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
08/24/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/18/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/18/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/18/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
09/02/2022Fire-Resistant Penetrations and JointsDOYUN KIMspecial
09/02/2022Energy Code Compliance InspectionsDOYUN KIMprogress
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
09/01/2026B00607006-I1Request digital key ↗
08/31/2026B00644963-I1Request digital key ↗
08/31/2026B00644963-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/01/2026B00607006-I1Open ↗
08/31/2026B00652787-P1Open ↗
08/31/2026B00652787-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
08/23/2026B00644963-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026B00644963-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/15/2026B00652787-P1Open ↗
08/15/2026B00652787-I1Open ↗
08/13/2026B00644963-P1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00652787-I1Open ↗