← Back
BuildNYC
Elevator cooperative
2550 INDEPENDENCE AVENUE
BRONX · BIN 2083470
💬 Discuss this project
1959Year Built
7Stories
D4Building Class
R6AZoning
200,314 sfGross Floor Area
142Units
LL97 CoveredRent Stabilized15 Active Violations ▸FISP: SWARMP
Elevator cooperative · Owner of record: 2550 Independence Ave · 81,225 sf lot · 2.47 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 4Unit 4C1 filing · 2 docs
Floor 3Unit 3PR3p · 1 filing · 9 docs
Floor 2
Floor 1
CellarGarthchester Realty1p · 1 filing · 7 docs
Site & exteriorHudsoncrest Properties INC.9p · 1 filing · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
2550 Independence Ave Owners2903/22/2026
Hudsoncrest Properties1307/08/2026
Garthchester Realty604/09/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Saghari Architectural Services210/09/2025
Pve Associates302/21/2025
Hal Dorfman Architect206/07/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
American Gotham Consultants403/21/2026
Northeast Expediting603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Designview ContractGeneral Contractor303/21/2026
Macintosh ElectricElectrical303/22/2026
Two-Tone ContractingGeneral Contractor203/21/2026
New York Plumbing & HeatingPlumbing203/22/2026
LCS Restorationspecialty_contractor104/09/2026
L Z RestorationGeneral Contractor103/21/2026
National Microwave ContractorsGeneral Contractor103/21/2026
PHD General ContractingGeneral Contractor103/21/2026
Carreras Home InprovementPlumbing103/21/2026
Losito Plumbing & HeatingPlumbing103/21/2026
Hudson Plumbing and HeatingPlumbing107/08/2026
Cliffside Home ImprovementsGeneral Contractor103/21/2026
EM EM Chimney MasonGeneral Contractor103/21/2026
High End ConstructionGeneral Contractor107/08/2026
Alan E RosenbergPlumbing106/08/1998
Alklem PlumbingPlumbing210/02/2014
Bargain Plumbing & HtgingPlumbing107/12/2017
BMT Plumbing & HeatingPlumbing107/25/2017
Chris Owen Plumbing & HeatingPlumbing106/29/2007
Dewaters Plumbling & HeatingPlumbing111/27/2006
G N American ConstructionGeneral Contractor105/22/2017
Henry Coustom CabinrtsGeneral Contractor102/21/2003
I & S ConstructionGeneral Contractor106/27/2017
Jay-Marco Plumbing & HeatingPlumbing109/15/2005
Linmar RestorationGeneral Contractor110/01/2009
Milleniun RestorationGeneral Contractor106/22/2005
NCMR ConstructionGeneral Contractor112/15/2004
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Amka & Associates8239210/09/2025
Ase Engineering5785202/21/2025
Partridge Venture Engineering7690202/21/2025
Building Lifecycle
02/20/2029
Facade inspection report due (FISP Cycle 9, sub-cycle C)
The filing window opened 02/21/2027. No Cycle 9 filing on record yet
07/02/2026
Signed off — Alteration
Garage repairs as per plans; no change to use, occupancy, or egress. No change to number of parking spaces.
X01176215-I1
06/06/2026
§ 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE…
HPD violation · open
06/06/2026
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR…
HPD violation · closed
06/06/2026
§ 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY…
HPD violation · open
220 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offLCS Restoration03/20/2026
DOB NOWStructuralSigned-offTwo-Tone Contracting04/29/2023
DOB NOWPlumbingSigned-offHudson Plumbing and Heating11/16/2021
DOB NOWGeneral ConstructionSigned-offRandy Rose06/24/2021
BISOTISSUEDCliffside Home Improvements01/11/2018
BISOTISSUEDCliffside Home Improvements09/07/2017
BISPLISSUEDBMT Plumbing & Heating07/25/2017
BISPLISSUEDHudson River Mechanical Group I07/12/2017
BISOTISSUEDI & S Construction06/27/2017
BISOTISSUEDG N American Construction05/22/2017
BISOTISSUEDL & Z Restoration02/23/2017
BISEQISSUEDL & Z Restoration08/29/2016
BISOTISSUEDL & Z Restoration07/20/2016
BISPLISSUEDAlklem Plumbing10/02/2014
BISOTISSUEDDesignview04/22/2014
BISOTISSUEDEM & EM Chimney and Mason04/01/2014
BISPLISSUEDAlklem Plumbing10/03/2013
BISFSISSUEDMarlande Heating10/03/2013
BIS—ISSUEDDesignview05/06/2013
BISPLISSUEDLosito Plumbing & Heating08/30/2012
BIS—ISSUEDDesignview08/16/2012
BISOTISSUEDDesignview03/24/2011
BISPLISSUEDLosito Plumbing & Heating02/16/2011
BISOTISSUEDDesignview02/14/2011
BISOTISSUEDLinmar Restoration10/01/2009
BISEQISSUEDL & Z Restoration09/01/2009
BISPLISSUEDCity Testing & Plumbing I06/29/2007
BISPLISSUEDDewaters Plumbling & Heating11/27/2006
BISPLISSUEDCarreras Home Improvement04/25/2006
BISOTISSUEDPHD General Contracting04/18/2006
BISPLISSUEDJay-Marco Plumbing & Heating09/15/2005
BISOTISSUEDMillenium Restoration06/22/2005
BISOTISSUEDNCMR Construction12/15/2004
BISOTISSUEDHenry Coustom Cabinrts02/21/2003
BISPLISSUEDAlan E. Rosenberg06/08/1998
BISOTISSUEDNone04/23/1998
BISOTISSUEDNone04/23/1998
BISOTISSUEDNational Microwave Contractors01/23/1998
8 projects · most recent 09/05/2025
General Wiring
FiledStatusContractorScope
09/05/2025CompleteMacintosh ElectricGeneral Wiring
10/10/2024CompleteMacintosh ElectricGeneral Wiring
08/30/2023CompleteMacintosh ElectricGeneral Wiring
09/09/2022CompleteCentury ElectricGeneral Wiring
07/14/2021CompleteAstro Electrical ContngGeneral Wiring
05/13/2021CompleteMacintosh ElectricGeneral Wiring
04/12/2018CompleteHecmar ElectricGeneral Wiring
03/13/2018CompleteMacintosh ElectricGeneral Wiring
3 projects · most recent 10/09/2025
Concrete
FiledStatusContractorScope
10/09/2025Signed-offLCS RestorationConcrete
06/11/2025———
———Concrete
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
12/08/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
03/04/2025Tenant Protection Plan ComplianceJAMES VENTUREspecial
03/04/2025Footing and Foundationalon egoziprogress
03/04/2025Finalalon egoziprogress
03/04/2025Post-installed Anchorsalon egozispecial
03/04/2025Structural Stability – Alterations of existing buildingsalon egozispecial
03/04/2025Subsurface Investigations (Borings/Test Pits)RAM KASTURIspecial
03/04/2025Masonryalon egozispecial
02/11/2025Subsurface Investigations (Borings/Test Pits)RAM KASTURIspecial
02/11/2025Finalalon egoziprogress
02/11/2025Footing and Foundationalon egoziprogress
02/11/2025Masonryalon egozispecial
02/11/2025Post-installed Anchorsalon egozispecial
02/11/2025Structural Stability – Alterations of existing buildingsalon egozispecial
02/11/2025Tenant Protection Plan ComplianceJAMES VENTUREspecial
02/04/2025MasonryAHMAD KHANZADAspecial
02/04/2025Structural Stability – Alterations of existing buildingsAHMAD KHANZADAspecial
02/04/2025Tenant Protection Plan ComplianceAHMAD KHANZADAspecial
02/04/2025FinalAHMAD KHANZADAprogress
02/04/2025Concrete - Cast-In-PlaceAHMAD KHANZADAspecial
12/27/2022Tenant Protection Plan Compliance—special
11/03/2022Final—progress
11/03/2022Subgrade Inspections—special
11/03/2022Subsurface Conditions – Fill Placement & In-Place Density—special
11/03/2022Subsurface Investigations (Borings/Test Pits)RAM KASTURIspecial
11/03/2022Concrete - Cast-In-Place—special
Latest 25 of 31.
348 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account