2551 CRUGER AVENUE
BRONX · BIN 2051326
💬 Discuss this project
1910Year Built
2Stories
C0Building Class
R6Zoning
3,360 sfGross Floor Area
3Units
Rent Stabilized43 Active Violations 40 unresolved · 3 paperwork only ▸
Three families · 4,258 sf lot · 0.79 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Unit 1A1 filing
Basement1 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JS Contractors103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Vasilios Artemiou PE107/24/2025
Adb Associates308/12/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC Design File403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Renaissance ElectricElectrical103/21/2026
Syed-Naqvi AltafElectrical103/21/2026
Alson Electrical ContractingElectrical103/21/2026
Building Lifecycle
04/30/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · open
11/18/2025
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · open
08/14/2025
Objection resolved — Addressed
08/06/2025
Objection raised — Cost
08/06/2025
Objection raised — Admin
99 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISPLISSUEDPrime Piping & Heating07/24/2013
BISOTISSUEDLeos Design Consultant04/19/2012
BISOTISSUEDAlonso Consulting Services12/01/2005
1 project · most recent 07/24/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScope
07/24/2025——Heating and Air Conditioning Systems, Ventilation Systems
1 project · most recent 07/24/2025
Sprinkler System
FiledStatusContractorScope
07/24/2025——Sprinkler System
1 project · most recent 07/24/2025
Water/Sanitary
FiledStatusContractorScope
07/24/2025——Water/Sanitary
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
07/16/2025Fire-Resistant Penetrations and Joints—special
07/16/2025Post-installed Anchors—special
08/08/2024HVAC-R and service water piping design and insulation—energy_progress
08/08/2024Permanent certificate—energy_progress
08/08/2024Maintenance information—energy_progress
08/08/2024HVAC-R and service water heating equipment—energy_progress
08/08/2024HVAC-R and service water heating system controls—energy_progress
08/08/2024HVAC-R and service water piping design and insulation—energy_progress
08/08/2024Energy Code Compliance Inspections—progress
08/08/2024Fire-Resistant Penetrations and Joints—special
08/08/2024Ventilation and air distribution system—energy_progress
08/08/2024HVAC-R and service water heating system controls—energy_progress
08/08/2024Permanent certificate—energy_progress
08/08/2024Fire-Resistant Penetrations and Joints—special
08/08/2024Heating Systems—special
08/08/2024Post-installed Anchors—special
08/08/2024Fire-Resistance Rated Construction—progress
08/08/2024HVAC-R and service water heating equipment—energy_progress
08/08/2024Maintenance information—energy_progress
06/11/2024Final—progress
06/11/2024Structural Stability – Alterations of existing buildings—special
06/11/2024Mechanical Systems—special
06/11/2024Sprinkler Systems—special
05/24/2024Fenestration areas—energy_progress
05/24/2024Fenestration air leakage—energy_progress
Latest 25 of 36.
34 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account