← Back
BuildNYC
Over six families without stores
2553 BEDFORD AVENUE
BROOKLYN · BIN 3119755
💬 Discuss this project
1910Year Built
2Stories
C1Building Class
R6Zoning
5,104 sfGross Floor Area
9Units
Rent Stabilized3 Active Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: 2553 Bedford Suite · 2,000 sf lot · 2.55 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof5p · 1 filing · 5 docs
PenthouseMechanical system installation22p · 4 filings · 20 docs
Floor 4Temporary pipe scaffold installation28p · 5 filings · 20 docs
Floor 3Temporary pipe scaffold installation28p · 5 filings · 20 docs
Floor 2Temporary pipe scaffold installation28p · 5 filings · 20 docs
Floor 1Temporary pipe scaffold installation28p · 5 filings · 20 docs
CellarMechanical system installation22p · 4 filings · 20 docs
Site & exteriorTemporary pipe scaffold installation19p · 3 filings · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
2553 Bedford603/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/16/2020$770K—Private party → 2553 BEDFORD LLC$151/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Cavalry603/21/2026
AE Design Solution403/21/2026
Green Studio403/21/2026
Empire Expediting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Stellar IndustriesGeneral Contractor707/08/2026
Hope Home ImprovementScaffold407/08/2026
Michael VorlandElectrical303/21/2026
Central Scaffold & HoistScaffold303/21/2026
Manhattan D EnterprisesScaffold303/21/2026
Prime Piping & HeatingFire Protection107/08/2026
Stellar IndustriesScaffold107/08/2026
Prime Piping & HeatingPlumbing107/08/2026
Amb MechanicalPlumbing103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
M. International Engineering3129404/23/2021
Building Lifecycle
03/22/2023
Signed off — Alteration
B00490522-I1
03/10/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/23/2023
Signed off — Alteration
B00425055-I1
02/21/2023
Signed off — Alteration
PLUMBING FILING IN CONJUNCTION WITH ALT1 APPLICATION 340783520. NO CHANGE IN USE, EGRESS, OR OCCUPANY.
B00425031-I1
02/21/2023
Inspection — Certification Failed Sprinkler-SP-Fixtures-Finish
Certification Failed
View inspection ↗
73 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offStellar Industries12/21/2022
DOB NOWSprinklersSigned-offAmb Mechanical12/02/2021
DOB NOWSupported ScaffoldSigned-offCentral Scaffold & Hoist06/25/2021
DOB NOWMechanical SystemsSigned-offStellar Industries06/24/2021
DOB NOWStructuralSigned-offStellar Industries04/29/2021
DOB NOWPlumbingSigned-offPrime Piping & Heating04/20/2021
DOB NOWSidewalk ShedSigned-offManhattan D Enterprises03/25/2021
DOB NOWConstruction FenceSigned-offHope Home Improvement02/22/2021
DOB NOWConstruction FenceSigned-offHope Home Improvement01/12/2021
BIS—ISSUEDStellar Industries02/22/2021
2 projects · most recent 03/01/2023
General Wiring
FiledStatusContractorScope
03/01/2023CompleteTrue Power Electrical ContGeneral Wiring
03/17/2021CompleteV. Vass Electric—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
03/10/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/21/2023Certification Failed Sprinkler-SP-Fixtures-FinishCertification FailedView ↗
02/16/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
08/27/2021FinalPaul Perdekprogress
04/23/2021Structural Steel - DetailsNANIK MASSANDspecial
04/23/2021Structural Stability – Alterations of existing buildingsNANIK MASSANDspecial
04/23/2021Structural Cold-Formed SteelNANIK MASSANDspecial
04/23/2021Post-installed AnchorsNANIK MASSANDspecial
04/23/2021Concrete - Cast-In-PlaceNANIK MASSANDspecial
04/23/2021FinalNANIK MASSANDprogress
04/23/2021Wood – Prefabricated I-JoistsNANIK MASSANDspecial
04/23/2021Structural Steel - High Strength BoltingNANIK MASSANDspecial
04/23/2021Structural Steel - WeldingNANIK MASSANDspecial
03/11/2021Fire-Resistant Penetrations and JointsNANIK MASSANDspecial
03/11/2021Energy Code Compliance InspectionsNANIK MASSANDprogress
03/11/2021HVAC and service water heating equipment NANIK MASSANDenergy_progress
03/11/2021HVAC insulation and sealing NANIK MASSANDenergy_progress
03/11/2021HVAC and service water heating system controls NANIK MASSANDenergy_progress
03/11/2021Maintenance informationNANIK MASSANDenergy_progress
02/22/2021Maintenance informationNANIK MASSANDenergy_progress
02/22/2021HVAC and service water heating equipment NANIK MASSANDenergy_progress
02/22/2021HVAC and service water heating system controls NANIK MASSANDenergy_progress
02/22/2021Duct leakage testing NANIK MASSANDenergy_progress
02/22/2021HVAC insulation and sealing NANIK MASSANDenergy_progress
02/22/2021Post-installed AnchorsNANIK MASSANDspecial
02/22/2021Fire-Resistant Penetrations and JointsNANIK MASSANDspecial
02/22/2021Energy Code Compliance InspectionsNANIK MASSANDprogress
11/06/2020FinalNANIK MASSANDprogress
Latest 25 of 26.
226 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account