← Back
Two stories - detached, small or mid-size
2561 RADCLIFF AVENUE
BRONX · Allerton · BIN 2051610
💬 Discuss this project
1935Year Built
2Stories
A1Building Class
R5Zoning
1,400 sfGross Floor Area
1Units
3 Open Violations ▸
Two stories - detached, small or mid-size · 2,500 sf lot · 0.56 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Attic1p · 1 filing · 19 docs
Floor 24p · 1 filing · 19 docs
Floor 15p · 1 filing · 19 docs
Sub-Basement4p · 1 filing · 19 docs
Site & exterior1p · 1 filing · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
INTER-REALTY707/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/04/2025$775K—CAB INVEST GROUP LLC → Private party$554/sf building
08/28/2024$380K—Private party → CAB INVEST GROUP LLC$271/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MADRIAGA ENGINEERING P.C.211/26/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BERNARDO GAMBA203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DFE CONTRACTOR LLCGeneral Contractor104/09/2026
JUST PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AM ENGINEERING SERVICES P7975111/26/2024
Building Lifecycle
All (23)Filed (2)Permit Issued (2)Signed Off (1)Violation (3)Inspection (4)Special Inspection (11)
12/11/2025
Signed off — Alteration
SUBSEQUENT ALTERATION APPLICATION FILED TO RESOLVE DOB VIOLATIONS 24-02766, AND 24-02768. NO CHANGE TO USE, OCCUPANCY, AND/OR EGRESS PROPOSED.
X01145787-I1
06/16/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/16/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/16/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/24/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/14/2025
Permit issued — General Construction
X01145787-I1-GC
12/16/2024
Permit issued — Plumbing
X01145787-S2-PL
11/26/2024
Filed — Alteration
SUBSEQUENT ALTERATION APPLICATION FILED TO RESOLVE DOB VIOLATIONS 24-02766, AND 24-02768. NO CHANGE TO USE, OCCUPANCY, AND/OR EGRESS PROPOSED.
X01145787-I1
11/26/2024
Filed — Alteration
SUBSEQUENT ALTERATION APPLICATION FILED TO RESOLVE DOB VIOLATIONS 24-02766, AND 24-02768. NO CHANGE TO USE, OCCUPANCY, AND/OR EGRESS PROPOSED.
X01145787-S2
11/25/2024
Special inspection requirement — Energy Code Compliance Inspections
Albert Munoz
11/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Albert Munoz
11/25/2024
Special inspection requirement — Energy Code Compliance Inspections
Albert Munoz
11/25/2024
Special inspection requirement — Fire-Resistance Rated Construction
Albert Munoz
11/25/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Albert Munoz
11/25/2024
Special inspection requirement — Interior lighting power
Albert Munoz
11/25/2024
Special inspection requirement — Fenestration areas
Albert Munoz
11/25/2024
Special inspection requirement — Metering
Albert Munoz
11/25/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Albert Munoz
11/25/2024
Special inspection requirement — Air barrier - visual inspection
Albert Munoz
11/21/2024
Special inspection requirement — Final
Albert Munoz
10/17/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/17/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/17/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offDFE CONTRACTOR LLC02/14/2025
DOB NOWPlumbingPermit IssuedMOHAMED ABDELRAZEK12/16/2024
1 project · most recent 11/26/2024
Gas Water/Sanitary
FiledStatusContractorScope
11/26/2024Permit IssuedJUST PLBG & HTG INCGas, Water/Sanitary
1 project · most recent 12/05/2024
General Wiring
FiledStatusContractorScope
12/05/2024Permit IssuedWCK ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
06/16/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/16/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/16/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/24/2025Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
11/25/2024Energy Code Compliance InspectionsAlbert Munozprogress
11/25/2024Fire-Resistant Penetrations and JointsAlbert Munozspecial
11/25/2024Energy Code Compliance InspectionsAlbert Munozprogress
11/25/2024Fire-Resistance Rated ConstructionAlbert Munozprogress
11/25/2024Fenestration and door U-factor and product ratingsAlbert Munozenergy_progress
11/25/2024Interior lighting powerAlbert Munozenergy_progress
11/25/2024Fenestration areasAlbert Munozenergy_progress
11/25/2024MeteringAlbert Munozenergy_progress
11/25/2024HVAC-R and service water piping design and insulationAlbert Munozenergy_progress
11/25/2024Air barrier - visual inspectionAlbert Munozenergy_progress
11/21/2024FinalAlbert Munozprogress
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/20/2026X01145787-S2Request digital key ↗
08/20/2026X01145787-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWRestrictive Declaration/Easement 12
08/13/2026X01145787-I1Open ↗
08/13/2026X01145787-S2Open ↗
▸Seals & Professional Certifications13
▸DOB NOWProgress Inspector Seal & Signature10
09/01/2026X01145787-I1Open ↗
09/01/2026X01145787-I1Open ↗
09/01/2026X01145787-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026X01145787-I1Open ↗
08/13/2026X01145787-S2Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026X01145787-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026X01145787-I1Open ↗
08/13/2026X01145787-S2Open ↗