💬 Discuss this project
1925Year Built
2.75Stories
A1Building Class
R4AZoning
2,320 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 2,500 sf lot · 0.93 FAR built · Flood zone X
Locations of Work
ArchitectureElectrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofSolar electric array installation1p · 1 filing · 7 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/31/2024$510K—Private party → Private party$220/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
M-Con Engineering102/05/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Source ElectricElectrical103/22/2026
Sustainable StrategiesGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
M-Con Engineering7341102/05/2025
Building Lifecycle
05/06/2025
Signed off — Alteration
INSTALLATION OF SOLAR ELECTRIC GENERATION SYSTEM FOR UTILITY INTERCONNECTION
X01176902-I1
02/21/2025
Permit issued — Solar
X01176902-I1-SL
02/05/2025
Filed — Alteration
INSTALLATION OF SOLAR ELECTRIC GENERATION SYSTEM FOR UTILITY INTERCONNECTION
X01176902-I1
02/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michelle Contri
02/05/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Michelle Contri
8 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSustainable Strategies02/21/2025
3 projects · most recent 05/10/2025
General Wiring
FiledStatusContractorScope
05/10/2025Permit IssuedLens ElectricGeneral Wiring
03/31/2025CompleteSource Electric—
01/24/2025CompleteSource Electric—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
02/05/2025Fire-Resistant Penetrations and JointsMichelle Contrispecial
02/05/2025Structural Stability – Alterations of existing buildingsMichelle Contrispecial
02/05/2025Energy Code Compliance InspectionsMichelle Contriprogress
02/05/2025FinalMichelle Contriprogress
02/05/2025Air barrier - visual inspectionMichelle Contrienergy_progress
7 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account