← Back
Two stories - detached, small or mid-size
2563 FENTON AVENUE
BRONX · BIN 2052859
💬 Discuss this project
1925Year Built
2.75Stories
A1Building Class
R4AZoning
2,320 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 2,500 sf lot · 0.93 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 7 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/31/2024$510K—— → —$220/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
M-CON ENGINEERING, PC102/05/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SOURCE ELECTRIC INCElectrical103/22/2026
SUSTAINABLE STRATEGIESGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
M-CON ENGINEERING7341102/05/2025
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
05/06/2025
Signed off — Alteration
INSTALLATION OF SOLAR ELECTRIC GENERATION SYSTEM FOR UTILITY INTERCONNECTION
X01176902-I1
02/21/2025
Permit issued — Solar
X01176902-I1-SL
02/05/2025
Filed — Alteration
INSTALLATION OF SOLAR ELECTRIC GENERATION SYSTEM FOR UTILITY INTERCONNECTION
X01176902-I1
02/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michelle Contri
02/05/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Michelle Contri
02/05/2025
Special inspection requirement — Energy Code Compliance Inspections
Michelle Contri
02/05/2025
Special inspection requirement — Final
Michelle Contri
02/05/2025
Special inspection requirement — Air barrier - visual inspection
Michelle Contri
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUSTAINABLE STRATEGIES02/21/2025
3 projects · most recent 05/10/2025
General Wiring
FiledStatusContractorScope
05/10/2025Permit IssuedLENS ELECTRIC, INCGeneral Wiring
03/31/2025CompleteSOURCE ELECTRIC INC1 meters
01/24/2025CompleteSOURCE ELECTRIC INC1 meters
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
02/05/2025Fire-Resistant Penetrations and JointsMichelle Contrispecial
02/05/2025Structural Stability – Alterations of existing buildingsMichelle Contrispecial
02/05/2025Energy Code Compliance InspectionsMichelle Contriprogress
02/05/2025FinalMichelle Contriprogress
02/05/2025Air barrier - visual inspectionMichelle Contrienergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/20/2026X01176902-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
09/25/2026X01176902-I1Open ↗
09/25/2026X01176902-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/20/2026X01176902-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/25/2026X01176902-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/20/2026X01176902-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026X01176902-I1Open ↗