← Back
BuildNYC
One family attached or semi-detached
257-08 147TH AVENUE
QUEENS · Rosedale · BIN 4290287
💬 Discuss this project
1960Year Built
2Stories
A5Building Class
R3-1Zoning
1,440 sfGross Floor Area
1Units
0 Active Violations
One family attached or semi-detached · 4,600 sf lot · 0.31 FAR built · Flood zone X500
Locations of Work
Electrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofRooftop solar panel installation for residential use3p · 2 filings · 11 docs
Cellar1 filing · 4 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/24/2026$730K—Private party → Private party$507/sf building
09/12/2022$485K—— → —$337/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RR&R Associates209/30/2026
Parker and West Engineering107/23/2026
Momentum Solar107/13/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Sunrun Installation ServiceGeneral Contractor107/30/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Parker and West Engineering5272107/23/2026
MXV Sia9281107/13/2026
Building Lifecycle
All (25)Filed (4)Permit Issued (1)Violation (2)Objection (10)Special Inspection (8)
09/30/2026
Filed — Alteration
Propose to install yard drain as per plans
Q01419825-S1
08/11/2026
Objection raised — Fire_Protection
08/11/2026
Objection raised — Zoning
08/11/2026
Objection raised — Admin
08/11/2026
Objection raised — Inspections
08/11/2026
Objection raised — Fire_Protection
08/11/2026
Objection raised — Inspections
08/11/2026
Objection raised — Energy
08/11/2026
Objection raised — Cost
08/11/2026
Objection raised — Admin
08/11/2026
Objection raised — Structural
07/29/2026
Permit issued — Solar
Q01434849-I1-SL
07/23/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01434849-I1
07/23/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
07/23/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
07/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
07/22/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
07/22/2026
Special inspection requirement — Final
Walid Abdulla
07/13/2026
Filed — Alteration
INSTALLATION OF SOLAR PANELS, ROOFTOP, RAILED, GRID-TIED, 22 MODULES, 9.02KW
Q01428497-I1
06/25/2026
Filed — Alteration
Propose to install yard drain as per plans
Q01419825-I1
06/19/2026
Special inspection requirement — Footing and Foundation
06/19/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
06/19/2026
Special inspection requirement — Final
02/10/2026
Violation issued (ECB, closed)
Construction
02/10/2026
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSunrun Installation Service07/29/2026
1 project · most recent 09/30/2026
Storm
FiledStatusContractorScope
09/30/2026——Storm
3 projects · most recent 07/23/2026
HVAC Wiring
FiledStatusContractorScope
07/23/2026CompleteSunrun Solar Electl—
07/10/2026Permit IssuedIsland Electric—
04/14/2026CompleteVere ElectricHVAC Wiring
2 projects · most recent 07/23/2026
FiledStatusContractorScope
07/23/2026Signed-offSunrun Installation Service21 panels, 9.45 kw, 441.45 roof_area_sqft
07/13/2026——22 panels, 9.02 kw, 387 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
07/23/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
07/23/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
07/22/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
07/22/2026Energy Code Compliance InspectionsWalid Abdullaprogress
07/22/2026FinalWalid Abdullaprogress
06/19/2026Footing and Foundation—progress
06/19/2026Structural Stability – Alterations of existing buildings—special
06/19/2026Final—progress
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/16/2026Q01428497-I1Request digital key ↗
08/16/2026Q01434849-I1Request digital key ↗
08/14/2026Q01419825-I1Request digital key ↗
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature4
10/04/2026Q01419825-S1Open ↗
08/16/2026Q01419825-I1Open ↗
08/16/2026Q01428497-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026Q01434849-I1Open ↗
09/01/2026Q01434849-I1Open ↗
09/01/2026Q01434849-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026Q01434849-I1Open ↗
09/01/2026Q01434849-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
10/04/2026Q01419825-S1Open ↗
08/16/2026Q01428497-I1Open ↗
08/16/2026Q01434849-I1Open ↗