← Back
Two family converted from one family
257-08 148 AVENUE
QUEENS · Rosedale · BIN 4290563
💬 Discuss this project
1930Year Built
2Stories
B3Building Class
R3XZoning
3,261 sfGross Floor Area
2Units
12 Open Violations ▸FDNY Report ↗
Two family converted from one family · 5,500 sf lot · 0.59 FAR built · Flood zone X500
Locations of Work
StructuralMechanical
Floor 23p · 1 filing · 20 docs
Floor 12p · 1 filing · 20 docs
Cellar2p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
135-223 STREET2607/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/22/2024$1.6M—MPAM CONSULTING LLC → Private party$485/sf building
05/30/2023$475K—Private party → MPAM CONSULTING LLC$146/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SION CONSULTING ENGINEERING PC906/05/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SION CONSULTING ENGINEERING P C1803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
B36 SERVICES INCGeneral Contractor903/21/2026
NOPHIER PLUMBING & HTG INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SION CONSULTING ENG. PC1108806/05/2024
BIG APPLE GROUP NY A RMA9168302/05/2024
Building Lifecycle
All (70)Filed (9)Permit Issued (4)Signed Off (2)Violation (7)Inspection (6)Objection (12)Special Inspection (30)
05/22/2026
Violation issued (HPD, open)
B
05/22/2026
Violation issued (HPD, open)
B
05/22/2026
Violation issued (HPD, open)
B
05/22/2026
Violation issued (HPD, open)
A
05/22/2026
Violation issued (HPD, open)
B
05/22/2026
Violation issued (HPD, open)
A
05/22/2026
Violation issued (HPD, open)
A
06/27/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
sion hourizadeh
06/27/2024
Special inspection requirement — Metering
sion hourizadeh
06/27/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
sion hourizadeh
06/27/2024
Special inspection requirement — Air barrier - visual inspection
sion hourizadeh
06/27/2024
Special inspection requirement — Heating Systems
sion hourizadeh
06/27/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
sion hourizadeh
06/27/2024
Special inspection requirement — Fenestration air leakage
sion hourizadeh
06/27/2024
Special inspection requirement — Insulation placement and R values
sion hourizadeh
06/27/2024
Special inspection requirement — HVAC-R and service water heating system controls
sion hourizadeh
06/27/2024
Special inspection requirement — Interior lighting power
sion hourizadeh
06/27/2024
Special inspection requirement — Concrete - Cast-In-Place
sion hourizadeh
06/27/2024
Special inspection requirement — Mechanical Systems
sion hourizadeh
06/27/2024
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
sion hourizadeh
06/27/2024
Special inspection requirement — Final
sion hourizadeh
06/27/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
sion hourizadeh
06/27/2024
Special inspection requirement — Footing and Foundation
sion hourizadeh
06/27/2024
Special inspection requirement — Lighting in dwelling units
sion hourizadeh
06/27/2024
Special inspection requirement — Protection of exposed foundation insulation
sion hourizadeh
06/27/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
sion hourizadeh
06/27/2024
Special inspection requirement — Fenestration areas
sion hourizadeh
06/27/2024
Special inspection requirement — HVAC-R and service water heating equipment
sion hourizadeh
06/05/2024
Filed — Alteration CO
THIS APPLICATION IS FILED TO CONVERT EXISTING 1 FAMILY INTO 2 FAMILY AND EXTENSION IN SIDE , FRONT AND REAR AR FIRST AND SECOND FLOOR
Q00895218-P6
04/26/2024
Filed — Alteration CO
THIS APPLICATION IS FILED TO CONVERT EXISTING 1 FAMILY INTO 2 FAMILY AND EXTENSION IN SIDE , FRONT AND REAR AR FIRST AND SECOND FLOOR
Q00895218-P5
04/26/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
sion hourizadeh
04/26/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
sion hourizadeh
04/26/2024
Special inspection requirement — Air barrier - visual inspection
sion hourizadeh
04/26/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
sion hourizadeh
04/26/2024
Special inspection requirement — Mechanical Systems
sion hourizadeh
04/26/2024
Special inspection requirement — Interior lighting power
sion hourizadeh
04/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
sion hourizadeh
04/26/2024
Special inspection requirement — Heating Systems
sion hourizadeh
04/26/2024
Special inspection requirement — HVAC-R and service water heating equipment
sion hourizadeh
04/09/2024
Permit issued — Foundation
Q00895218-I1-MS
03/27/2024
Signed off — Alteration CO
THIS APPLICATION IS FILED TO CONVERT EXISTING 1 FAMILY INTO 2 FAMILY AND EXTENSION IN SIDE , FRONT AND REAR AR FIRST AND SECOND FLOOR
Q00895218-S1
03/27/2024
Signed off — Alteration
THIS APPLICATION IS FILED FOR 8'hHt CONSTRUCTION FENCE
Q00885757-I1
03/12/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/11/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/14/2024
Filed — Alteration CO
THIS APPLICATION IS FILED TO CONVERT EXISTING 1 FAMILY INTO 2 FAMILY AND EXTENSION IN SIDE , FRONT AND REAR AR FIRST AND SECOND FLOOR
Q00895218-P4
02/09/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/05/2024
Filed — Alteration CO
THIS APPLICATION IS FILED TO CONVERT EXISTING 1 FAMILY INTO 2 FAMILY AND EXTENSION IN SIDE , FRONT AND REAR AR FIRST AND SECOND FLOOR
Q00895218-P3
01/11/2024
Objection resolved — Addressed
01/10/2024
Objection raised — Scope
12/29/2023
Filed — Alteration CO
THIS APPLICATION IS FILED TO CONVERT EXISTING 1 FAMILY INTO 2 FAMILY AND EXTENSION IN SIDE , FRONT AND REAR AR FIRST AND SECOND FLOOR
Q00895218-P2
12/29/2023
Filed — Alteration CO
THIS APPLICATION IS FILED TO CONVERT EXISTING 1 FAMILY INTO 2 FAMILY AND EXTENSION IN SIDE , FRONT AND REAR AR FIRST AND SECOND FLOOR
Q00895218-P1
10/12/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/12/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/06/2023
Permit issued — Plumbing
Q00895218-S1-PL
09/22/2023
Objection resolved — Addressed
09/14/2023
Objection raised — Admin
09/14/2023
Objection resolved — Addressed
09/06/2023
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
08/30/2023
Objection raised — Scope
08/23/2023
Filed — Alteration CO
THIS APPLICATION IS FILED TO CONVERT EXISTING 1 FAMILY INTO 2 FAMILY AND EXTENSION IN SIDE , FRONT AND REAR AR FIRST AND SECOND FLOOR
Q00895218-S1
Latest 60 of 70 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationSigned-offB36 SERVICES INC04/09/2024
DOB NOWPlumbingSigned-offNOPHIER PLUMBING & HTG IN10/06/2023
DOB NOWStructuralPermit IssuedB36 SERVICES INC08/22/2023
DOB NOWConstruction FenceSigned-offB36 SERVICES INC06/12/2023
1 project · most recent 06/05/2024
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/05/2024Signed-offB36 SERVICES INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Goodman GM 3 tons ×3
— GM 3 tons ×2
Ventilation
Panasonic Model #FV-0811RQC1 150 CFM · Exhaust Fan ×30
1 project · most recent 06/05/2024
Gas Water/Sanitary
FiledStatusContractorScope
06/05/2024Signed-offNOPHIER PLUMBING & HTG INGas, Water/Sanitary
1 project · most recent 09/01/2023
General Wiring
FiledStatusContractorScope
09/01/2023CompleteSUPREME ELECTRIC CORPGeneral Wiring
1 project · most recent 06/05/2024
Wood
FiledStatusContractorScope
06/05/2024Signed-offB36 SERVICES INCWood
1 project · most recent 06/05/2024
Earthwork
FiledStatusContractorScope
06/05/2024Signed-offB36 SERVICES INCEarthwork
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
03/12/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/11/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/09/2024Pass-Final CND-Occupancy InspectionPassView ↗
10/12/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/12/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/06/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 94
DateRequirementInspectorRole
06/27/2024Air barrier - visual inspectionsion hourizadehenergy_progress
06/27/2024Interior lighting powersion hourizadehenergy_progress
06/27/2024Meteringsion hourizadehenergy_progress
06/27/2024HVAC-R and service water heating equipmentsion hourizadehenergy_progress
06/27/2024HVAC-R and service water heating system controlssion hourizadehenergy_progress
06/27/2024Fenestration areassion hourizadehenergy_progress
06/27/2024HVAC-R and service water piping design and insulationsion hourizadehenergy_progress
06/27/2024Fenestration and door U-factor and product ratingssion hourizadehenergy_progress
06/27/2024Insulation placement and R valuession hourizadehenergy_progress
06/27/2024Protection of exposed foundation insulationsion hourizadehenergy_progress
06/27/2024Lighting in dwelling unitssion hourizadehenergy_progress
06/27/2024Fenestration air leakagesion hourizadehenergy_progress
06/27/2024Footing and Foundationsion hourizadehprogress
06/27/2024Finalsion hourizadehprogress
06/27/2024Concrete - Cast-In-Placesion hourizadehspecial
06/27/2024Structural Stability – Alterations of existing buildingssion hourizadehspecial
06/27/2024Mechanical Systemssion hourizadehspecial
06/27/2024Fire-Resistant Penetrations and Jointssion hourizadehspecial
06/27/2024Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)sion hourizadehspecial
06/27/2024Heating Systemssion hourizadehspecial
06/27/2024Excavations - Sheeting, Shoring, and Bracingsion hourizadehspecial
04/26/2024Concrete - Cast-In-Placesion hourizadehspecial
04/26/2024Excavations - Sheeting, Shoring, and Bracingsion hourizadehspecial
04/26/2024Fire-Resistant Penetrations and Jointssion hourizadehspecial
04/26/2024Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)sion hourizadehspecial
Latest 25 of 94.
▾Documents — 84 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/24/2026Q00885757-I1Request digital key ↗
08/22/2026Q00895218-P6Request digital key ↗
08/22/2026Q00895218-P3Request digital key ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records11
▸DOB NOWZD1: DOB Zoning Diagram5
08/13/2026Q00895218-P4Open ↗
08/13/2026Q00895218-I1Open ↗
08/13/2026Q00895218-P6Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)5
08/13/2026Q00895218-I1Open ↗
08/13/2026Q00895218-P5Open ↗
08/13/2026Q00895218-P6Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00895218-I1Open ↗
▸Seals & Professional Certifications29
▸DOB NOWSpecial Inspector Seal & Signature10
09/01/2026Q00895218-P4Open ↗
09/01/2026Q00895218-P4Open ↗
09/01/2026Q00895218-P5Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/01/2026Q00895218-P4Open ↗
09/01/2026Q00895218-P4Open ↗
09/01/2026Q00895218-P5Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/22/2026Q00895218-P2Open ↗
08/22/2026Q00895218-P1Open ↗
08/22/2026Q00895218-I1Open ↗
Showing 3 of 9 on file for this type
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist5
08/13/2026Q00895218-P4Open ↗
08/13/2026Q00895218-P5Open ↗
08/13/2026Q00895218-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/22/2026Q00895218-P1Open ↗
08/22/2026Q00895218-I1Open ↗
08/22/2026Q00895218-S1Open ↗
Showing 3 of 8 on file for this type
▸Other Documents22
▸DOB NOWSite Survey: Initial5
08/13/2026Q00895218-P6Open ↗
08/13/2026Q00895218-I1Open ↗
08/13/2026Q00895218-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlot Diagram5
08/13/2026Q00895218-P5Open ↗
08/13/2026Q00895218-P6Open ↗
08/13/2026Q00895218-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/13/2026Q00895218-P1Open ↗
08/13/2026Q00895218-P5Open ↗
08/13/2026Q00895218-P6Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification5
08/22/2026Q00895218-P1Open ↗
08/22/2026Q00895218-I1Open ↗
08/22/2026Q00895218-P6Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWFinal Survey1
08/13/2026Q00895218-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00895218-I1Open ↗