257-17 144 AVENUE
QUEENS · BIN 4288950
💬 Discuss this project
1960Year Built
2Stories
B2Building Class
R3XZoning
2,300 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family frame · 5,916 sf lot · 0.39 FAR built · Flood zone X500
Locations of Work
MechanicalPlumbing
Cellar7p · 3 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/11/2021$845K—Private party → Private party$367/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BAZINI ENGINEERING, P.C.501/22/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
L RICHARDS PLUMBING & HEAGeneral Contractor107/08/2026
L.RICHARDS PLBG & HTGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BAZINI ENGINEERING, P.C.1808401/22/2024
Building Lifecycle
All (21)Filed (5)Permit Issued (3)Violation (1)Inspection (6)Special Inspection (6)
02/22/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
01/30/2024
Special inspection requirement — Mechanical Systems
Joseph Bazini
01/30/2024
Special inspection requirement — Final
Joseph Bazini
01/22/2024
Filed — Alteration
REPLACE TWO (2) OIL-FIRED BOILERS WITH TWO (2) DIRECT VENT GAS-FIRED BOILERS AS PER PLANS. INSTALL NEW TWO-PIECE BATHROOM. INSTALL NEW GAS-FIRED DRYER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00862148-P1
01/22/2024
Filed — Alteration
Q00862157-P1
01/15/2024
Special inspection requirement — Mechanical Systems
Joseph Bazini
01/15/2024
Special inspection requirement — Final
Joseph Bazini
12/21/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Bazini
12/21/2023
Special inspection requirement — HVAC-R and service water heating equipment
Joseph Bazini
12/06/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
11/17/2023
Permit issued — Boiler Equipment
Q00862164-I1-BE
09/01/2023
Permit issued — Mechanical Systems
Q00862157-I1-MS
08/24/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/17/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/17/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/17/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/26/2023
Permit issued — Plumbing
Q00862148-I1-PL
06/05/2023
Filed — Alteration
REMOVE TWO (2) FUEL OIL STORAGE TANKS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00862164-I1
06/05/2023
Filed — Alteration
Q00862157-I1
06/05/2023
Filed — Alteration
REPLACE TWO (2) OIL-FIRED BOILERS WITH TWO (2) DIRECT VENT GAS-FIRED BOILERS AS PER PLANS. INSTALL NEW TWO-PIECE BATHROOM. INSTALL NEW GAS-FIRED DRYER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00862148-I1
01/07/2010
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offPACIFIC ENERGY CORP11/17/2023
DOB NOWMechanical SystemsPermit IssuedL RICHARDS PLUMBING & HEA09/01/2023
DOB NOWPlumbingSigned-offL.RICHARDS PLBG & HTG06/26/2023
1 project · most recent 01/22/2024
Gas Water/Sanitary
FiledStatusContractorScope
01/22/2024Signed-offL.RICHARDS PLBG & HTGGas, Water/Sanitary
1 project · most recent 04/04/2021
FiledStatusContractorScope
04/04/2021Permit IssuedBDS ELECTRIC CORP.3 meters, 3 new_meters
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
02/22/2024Pass-Final Boiler Equipment InspectionPassView ↗
12/06/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/24/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/17/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/17/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/17/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
01/30/2024Mechanical SystemsJoseph Bazinispecial
01/30/2024FinalJoseph Baziniprogress
01/15/2024Mechanical SystemsJoseph Bazinispecial
01/15/2024FinalJoseph Baziniprogress
12/21/2023Fire-Resistant Penetrations and JointsJoseph Bazinispecial
12/21/2023HVAC-R and service water heating equipmentJoseph Bazinienergy_progress
▾Documents — 21 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/24/2026Q00862148-P1Request digital key ↗
08/24/2026Q00862148-I1Request digital key ↗
08/24/2026Q00862164-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/24/2026Q00862148-P1Open ↗
08/24/2026Q00862148-I1Open ↗
08/23/2026Q00862157-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/02/2026Q00862148-P1Open ↗
08/29/2026Q00862157-P1Open ↗
08/27/2026Q00862157-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/02/2026Q00862148-P1Open ↗
08/29/2026Q00862157-P1Open ↗
08/27/2026Q00862157-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/24/2026Q00862148-P1Open ↗