← Back
Two stories - detached, small or mid-size
257-25 145 AVENUE
QUEENS · Rosedale · BIN 4288924
💬 Discuss this project
1915Year Built
2Stories
A1Building Class
R3XZoning
894 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 2,403 sf lot · 0.37 FAR built · Flood zone X500
Locations of Work
Electrical
Roof1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR101/16/2025
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281101/16/2025
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
08/06/2025
Signed off — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 18 Panels, 7.38 kW
Q01168012-I1
01/23/2025
Permit issued — Solar
Q01168012-I1-SL
01/16/2025
Filed — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 18 Panels, 7.38 kW
Q01168012-I1
01/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
01/16/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
01/16/2025
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
01/16/2025
Special inspection requirement — Final
Mina Makar
01/16/2025
Special inspection requirement — Air barrier - visual inspection
Mina Makar
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offMOMENTUM SOLAR01/23/2025
1 project · most recent 01/16/2025
FiledStatusContractorScope
01/16/2025CompleteISLAND ELECTRIC CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
01/16/2025Fire-Resistant Penetrations and JointsMina Makarspecial
01/16/2025Structural Stability – Alterations of existing buildingsMina Makarspecial
01/16/2025Energy Code Compliance InspectionsMina Makarprogress
01/16/2025FinalMina Makarprogress
01/16/2025Air barrier - visual inspectionMina Makarenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/21/2026Q01168012-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/27/2026Q01168012-I1Open ↗
08/27/2026Q01168012-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026Q01168012-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/27/2026Q01168012-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q01168012-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01168012-I1Open ↗