← Back
Predominantly retail with other uses
257 7 AVENUE
MANHATTAN · BIN 1014999
💬 Discuss this project
1920Year Built
4Stories
K4Building Class
C6-3XZoning
3,780 sfGross Floor Area
4Units
2 Open Violations ▸
Predominantly retail with other uses · Owner of record: GUISAR REALTY CORP. · 1,260 sf lot · 3 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GUISAR REALTY2407/08/2026
SHALBRO CONSTRUCTION GROUP307/08/2026
VARDO CONSTRUCTION103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RAS PE CONSULTING ENGINEERS207/18/2022
ARQUITECTURA VARELA101/10/2022
JAMES H. FAHEY108/12/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONSTRUCTION PERMIT SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STATIC CONSTRUCTION INCGeneral Contractor603/21/2026
SHALBRO CONSTRUCTION GROUPGeneral Contractor107/08/2026
TELCOM ENGINEERING GP INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ABDUS SALAM C. ENGINEERS484207/18/2022
STRUCTURAL CONSULTING SER1919108/12/2019
Building Lifecycle
All (77)Filed (4)Permit Issued (4)Signed Off (2)Violation (50)Inspection (1)Objection (10)Special Inspection (6)
07/28/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/02/2022
Signed off — Alteration
HEREWITH FILING FOR FACADE REPAIR
M00682341-I1
08/01/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
07/27/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
IDRIS SALAM
07/27/2022
Special inspection requirement — Masonry
IDRIS SALAM
07/27/2022
Special inspection requirement — Final
Rizwan Salam
07/18/2022
Filed — Alteration
HEREWITH FILING FOR FACADE REPAIR
M00682341-P1
06/30/2022
Special inspection requirement — Masonry
IDRIS SALAM
06/30/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
IDRIS SALAM
06/30/2022
Special inspection requirement — Final
Rizwan Salam
06/29/2022
Permit issued — Structural
M00682341-I1-GC-CX
05/19/2022
Signed off — Alteration
Modification to existing Verizon telecommunications site. Replace 2 antennas on existing mounts on roof. All in conformance with TPPN 5/98. No change in use, egress, or occupancy.
M00167075-I1
05/09/2022
Permit issued — Structural
M00682341-I1-GC-CX
03/29/2022
Filed — Alteration
HEREWITH FILING FOR FACADE REPAIR
M00682341-I1
03/16/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/11/2022
Permit issued — Sidewalk Shed
M00657009-I1-SH
01/10/2022
Filed — Alteration
M00657009-I1
12/21/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/20/2021
Violation issued (ECB, closed)
Construction
10/11/2019
Permit issued — Antenna
M00167075-I1-AN
10/07/2019
Objection resolved — Addressed
10/07/2019
Objection resolved — Addressed
10/07/2019
Objection resolved — Addressed
10/07/2019
Objection resolved — Addressed
10/07/2019
Objection resolved — Addressed
08/12/2019
Filed — Alteration
Modification to existing Verizon telecommunications site. Replace 2 antennas on existing mounts on roof. All in conformance with TPPN 5/98. No change in use, egress, or occupancy.
M00167075-I1
08/12/2019
Objection raised — 2014-AN AC 28-104.7.1-Administ
08/12/2019
Objection raised — 2014-AN AC 28-104.11-Building
08/12/2019
Objection raised — 2014-AN AC 28-104.7-Building C
08/12/2019
Objection raised — 2014-AN AC 28-104.7.1-Administ
08/12/2019
Objection raised — 2014-AN AC 28-104.11-Building
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/01/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/01/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/01/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/31/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/31/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/31/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/01/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/01/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/01/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/19/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/19/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/19/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/02/2006
Violation issued (ECB, closed)
Construction
09/28/2006
Violation issued (ECB, closed)
Construction
01/06/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/06/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/06/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 77 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offSTATIC CONSTRUCTION INC06/29/2022
DOB NOWStructuralSigned-offSTATIC CONSTRUCTION INC05/09/2022
DOB NOWSidewalk ShedPermit IssuedSHALBRO CONSTRUCTION GROU01/11/2022
DOB NOWAntennaSigned-offLINED UP CONSTRUCTION10/11/2019
BISPLISSUEDJULIAN PLBG & HTG CORP10/04/2019
BIS—ISSUEDTEMPA GENERAL CONTRACTING CORP09/11/2019
BIS—ISSUEDTEMPA GENERAL CONTRACTING CORP06/28/2019
BISOTISSUEDBUILD TECH CONSTRUCTION CORP.04/05/2019
BISPLISSUEDAURA PLUMBING INC12/08/2017
BISMHISSUEDTELCOM ENGINEERING GP INC12/04/2017
BIS—ISSUEDTEMPA GENERAL CONTRACTING CORP09/21/2017
BIS—ISSUEDTEMPA GENERAL CONTRACTING CORP08/19/2016
BISPLISSUEDJD MASTERS PLBG & HTG05/05/2016
BIS—ISSUEDTEMPA GENERAL CONTRACTING CORP09/17/2015
BISOTISSUEDTELCOM ENGINEERING GP INC05/27/2015
BISPLISSUEDJD MASTERS PLBG & HTG04/08/2015
BIS—ISSUEDTEMPA GENERAL CONTRACTING CORP03/02/2015
BISPLISSUEDAURA PLUMBING INC03/06/2014
BISMHISSUEDTELCOM ENGINEERING GP INC07/23/2013
BISOTISSUEDTELCOM ENGINEERING GP INC07/23/2013
BISOTISSUEDFAST TRACK ELECTRIC CORP07/18/2013
BISMHISSUEDFAST TRACK ELECTRIC CORP07/18/2013
BISMHISSUEDALL ARCHITECT ART10/19/2006
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
08/01/2022Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
07/27/2022Structural Stability – Alterations of existing buildingsIDRIS SALAMspecial
07/27/2022MasonryIDRIS SALAMspecial
07/27/2022FinalRizwan Salamprogress
06/30/2022MasonryIDRIS SALAMspecial
06/30/2022Structural Stability – Alterations of existing buildingsIDRIS SALAMspecial
06/30/2022FinalRizwan Salamprogress
▾Documents — 146 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch3
09/03/2026M00657009-I1Request digital key ↗
09/02/2026M00682341-I1Request digital key ↗
09/02/2026M00682341-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Antenna1
08/14/2026M00167075-I1Request digital key ↗
▸Applications & Permits31
▸BISWORK PERMIT APPLICATION17
10/04/2019104585263Open ↗
09/12/2019122128893Open ↗
07/01/2019122128893Open ↗
Showing 3 of 17 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION13
03/23/2020122128893Open ↗
07/26/2019122128893Open ↗
06/10/2019122128893Open ↗
Showing 3 of 13 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
04/27/2016122128893Open ↗
▸Seals & Professional Certifications21
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
02/08/2018121690429Open ↗
10/11/2017122284982Open ↗
07/07/2015121690125Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/24/2026M00682341-I1Open ↗
08/24/2026M00682341-I1Open ↗
08/24/2026M00682341-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/05/2026M00167075-I1Open ↗
09/03/2026M00657009-I1Open ↗
09/02/2026M00682341-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/24/2026M00682341-I1Open ↗
08/23/2026M00682341-P1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
02/10/2015122128893Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
02/10/2015122128893Open ↗
▸Trade Schedules & Equipment9
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT5
04/26/2016122128893Open ↗
04/18/2016122128893Open ↗
04/08/2016122128893Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
10/11/2017121690429Open ↗
02/10/2015122128893Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
05/12/2015122128893Open ↗
▸BISSCHEDULE B - PLUMBING1
06/28/2013121690429Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST1
02/10/2015122128893Open ↗
▸BISSTREET TREE SIGNOFF1
07/19/2020122128893Open ↗
▸Environmental & Asbestos15
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
03/06/2015122284982Open ↗
02/10/2015122128893Open ↗
06/28/2013121690125Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/02/2026M00682341-P1Open ↗
09/02/2026M00682341-I1Open ↗
08/14/2026M00167075-I1Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED2
04/06/2015122284982Open ↗
02/04/2015122128893Open ↗
▸DOB NOWOER: Notice of Satisfaction2
09/02/2026M00682341-I1Open ↗
08/14/2026M00167075-I1Open ↗
▸DOB NOWOER: Notice to Proceed2
09/02/2026M00682341-I1Open ↗
08/14/2026M00167075-I1Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
06/28/2013121690429Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
10/23/2019122128893Open ↗
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
02/08/2018121690429Open ↗
10/11/2017122284982Open ↗
07/07/2015121690125Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
11/06/2019122128893Open ↗
10/03/2019122128893Open ↗
02/08/2018121690429Open ↗
Showing 3 of 5 on file for this type
▸BISTR8: Energy Code Progress Inspections1
02/10/2015122128893Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/14/2026M00167075-I1Open ↗
▸Inspections & Test Reports1
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
04/08/2019104585263Open ↗
▸Approvals, Objections & Sign-offs18
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST9
11/06/2019122128893Open ↗
11/06/2019122128893Open ↗
10/17/2019122128893Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE7
03/23/2020122128893Open ↗
03/23/2020122128893Open ↗
07/26/2019122128893Open ↗
Showing 3 of 7 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
06/28/2013121690125Open ↗
06/28/2013121690429Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT7
11/06/2019122128893Open ↗
02/08/2018121690429Open ↗
07/07/2015121690125Open ↗
Showing 3 of 7 on file for this type
▸Filing & Intake Forms23
▸BISBOROUGH INTAKE FORM13
03/23/2020122128893Open ↗
11/06/2019122128893Open ↗
11/06/2019122128893Open ↗
Showing 3 of 13 on file for this type
▸BISADDITIONAL INFORMATION6
07/26/2019122128893Open ↗
06/18/2019122128893Open ↗
02/01/2018121690429Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING COVER SHEET4
03/06/2015122284982Open ↗
02/10/2015122128893Open ↗
06/28/2013121690125Open ↗
Showing 3 of 4 on file for this type
▸Other Documents1
▸BISPLOT DIAGRAM1
02/10/2015122128893Open ↗