Elevator apt, fireproof with stores
Ebenezer Plaza Phase 2 Condominium
257 HEGEMAN AVENUE · BIN 3428616
💬 Discuss this project
2023Year Built
11Stories
D6Building Class
R7DZoning
204,369 sfGross Floor Area
209Units
Rent Stabilized10 Open Violations ▸FDNY Report ↗
Elevator apt, fireproof with stores · Owner of record: HP EBENEZER 2 HOUSING DEVELOPMENT FUND C OMPANY INC · 36,833 sf lot · 5.55 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
Roof21p · 5 filings · 20 docs
Bulkhead10p · 2 filings · 20 docs
Floor 115p · 2 filings · 20 docs
Floor 107p · 3 filings · 20 docs
Floor 98p · 2 filings · 20 docs
Floor 89p · 2 filings · 20 docs
Floor 717p · 3 filings · 20 docs
Floor 617p · 3 filings · 20 docs
Floor 517p · 3 filings · 20 docs
Floor 417p · 3 filings · 20 docs
Floor 317p · 3 filings · 20 docs
Floor 213p · 3 filings · 20 docs
Floor 1Under Construction19p · 4 filings · 20 docs
Cellar16p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PROCIDA CONSTRUCTION10509/15/2026
HP MJM HOUSING DEVELOPMEN403/22/2026
HP EBENEZER 2 HOUSING DEV103/22/2026
ROCIDA CONSTRUCTION CORP103/22/2026
EBENEZER PLAZA OWNER PHASE II L1403/21/2026
EBANEZER PLAZA OWNER203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/22/2018$4.4M—HP MJM HOUSING DEVELOPMENT FUND COMPANY, INC. → HP EBENEZER 2 HOUSING DEVELOPMENT FUND COMPANY INC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SKYPEAK LLC205/12/2026
.203/17/2026
ANDREW FREDMAN ARCHITECT LLC103/17/2026
SYNERGIC DESIGN ARCHITECTS107/28/2025
MOROZOV1705/01/2025
TOHFAZ UDDIN PE PC808/09/2023
IKRA CONSULTING LLC104/14/2023
HOWARD I SHAPIRO & ASSOCIATES307/13/2022
MCNAMARA SALVIA205/04/2022
BECKER ENGINEERING, P.C.109/15/2021
AKRF, INC.108/20/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HOWARD I SHAPIRO ASSOCIATES803/21/2026
JM ZONING, LLC.3603/21/2026
A1 EXPEDITING SERVICE1203/21/2026
AK CONSULTING SERVICES203/21/2026
SYNERGY BUILDING CONSULTANTS103/21/2026
SPRING SCAFFOLDING LLC203/21/2026
INSHA BUILDING CONSULTANTS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PROCIDA CONSTRUCTION CORP.General Contractor1409/13/2026
MILLER PLUMBING & HTG INCFire Protection1009/07/2026
MILLER PLBG & HTG INCPlumbing707/08/2026
JASON DATTOLOElectrical603/21/2026
XTREME ELECTRIC INC 005223General Contractor603/22/2026
SPRING SCAFFOLDING LLCGeneral Contractor604/09/2026
NORTHEAST MASONRY & RESTOGeneral Contractor507/08/2026
COLGATE ENTERPRISE CORPGeneral Contractor304/09/2026
ACCORD POWER INCGeneral Contractor203/21/2026
TOTAL ELECTRIC SOLUTIONS 005349General Contractor203/22/2026
ACCORD POWER ELECTRIC LLCElectrical103/22/2026
URBAN CONSTR & DESIGN LLCGeneral Contractor104/09/2026
BRADFORD MECH. CONTR INCPlumbing107/08/2026
TOTAL ELECTRIC SOLUTIONSElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BUILDTECH ENGINEERING6369205/12/2026
AMERICAN CONSTRUCTION TES9731303/17/2026
SYNERGIC DESIGN LLC8561107/28/2025
BIG APPLE GROUP NY A RMA91681805/01/2025
IKRA CONSULTING LLC7032104/14/2023
Building Lifecycle
All (196)Filed (39)Permit Issued (43)Signed Off (16)Violation (29)Inspection (15)Objection (24)Special Inspection (30)
09/11/2026
Permit issued — Mechanical Systems
B01366019-S1-MS
09/01/2026
Permit issued — Sprinklers
B01366019-S2-EW-SP
08/28/2026
Violation issued (HPD, open)
C
08/28/2026
Violation issued (HPD, open)
A
08/28/2026
Violation issued (HPD, open)
B
08/28/2026
Violation issued (HPD, open)
B
08/28/2026
Violation issued (HPD, open)
B
08/28/2026
Violation issued (HPD, open)
A
08/28/2026
Violation issued (HPD, open)
A
08/27/2026
Permit issued — General Construction
B01366019-I1-GC
08/13/2026
Objection resolved — Resolved
08/13/2026
Objection resolved — Resolved
07/29/2026
Objection resolved — Addressed
07/15/2026
Objection resolved — Addressed
07/15/2026
Objection resolved — Addressed
07/15/2026
Objection resolved — Addressed
06/25/2026
Violation issued (HPD, open)
C
06/25/2026
Violation issued (HPD, open)
C
06/10/2026
Permit issued — Plumbing
B01395090-I1-PL
05/12/2026
Filed — Alteration
Filing to add plumbing work type in conjunction with GC/MS DOB now job# B01331931, install (1) three compartment sink, and (2) hand-wash sinks, and (1) grease trap inside 1st commercial space (DELI) as per plans.
B01395090-I1
05/12/2026
Special inspection requirement — Tenant Protection Plan Compliance
Luis Pichardo
04/29/2026
Violation issued (HPD, closed)
A
04/29/2026
Violation issued (HPD, closed)
A
04/29/2026
Violation issued (HPD, closed)
A
04/29/2026
Violation issued (HPD, closed)
A
04/25/2026
Violation issued (HPD, closed)
C
04/25/2026
Violation issued (HPD, closed)
A
04/25/2026
Violation issued (HPD, closed)
A
04/25/2026
Violation issued (HPD, open)
B
04/21/2026
Signed off — Alteration
B00373664-I1
04/03/2026
Objection raised — Scope
04/03/2026
Objection raised — Plumbing
04/03/2026
Objection raised — Scope
04/03/2026
Objection raised — Cost
04/03/2026
Objection raised — Scope
04/03/2026
Objection raised — Fire_Protection
04/01/2026
Objection raised — Cost
04/01/2026
Objection raised — Scope
03/17/2026
Filed — Alteration
INTERIOR PARTITION WORK WITH RELATED CEILING AND LIGHTING FOR RETAIL SPACES (9600 SF) AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B01366019-S1
03/17/2026
Filed — Alteration
INTERIOR PARTITION WORK WITH RELATED CEILING AND LIGHTING FOR RETAIL SPACES (9600 SF) AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B01366019-S2
03/17/2026
Filed — Alteration
INTERIOR PARTITION WORK WITH RELATED CEILING AND LIGHTING FOR RETAIL SPACES (9600 SF) AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B01366019-I1
03/17/2026
Special inspection requirement — HVAC-R and service water heating equipment
EDWIN HOPKINS
03/17/2026
Special inspection requirement — Maintenance information
EDWIN HOPKINS
03/17/2026
Special inspection requirement — Shutoff dampers
EDWIN HOPKINS
03/17/2026
Special inspection requirement — HVAC-R and service water heating system controls
EDWIN HOPKINS
03/17/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
EDWIN HOPKINS
03/17/2026
Special inspection requirement — Fire-Resistance Rated Construction
EDWIN HOPKINS
03/17/2026
Special inspection requirement — Energy Code Compliance Inspections
EDWIN HOPKINS
03/17/2026
Special inspection requirement — Heating Systems
EDWIN HOPKINS
03/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
EDWIN HOPKINS
03/03/2026
Special inspection requirement — Tenant Protection Plan Compliance
EDWIN HOPKINS
03/03/2026
Special inspection requirement — Tenant Protection Plan Compliance
EDWIN HOPKINS
03/03/2026
Special inspection requirement — Lighting controls
EDWIN HOPKINS
03/03/2026
Special inspection requirement — Interior lighting power
EDWIN HOPKINS
03/03/2026
Special inspection requirement — Final
EDWIN HOPKINS
03/03/2026
Special inspection requirement — Fire-Resistance Rated Construction
EDWIN HOPKINS
03/03/2026
Special inspection requirement — Energy Code Compliance Inspections
EDWIN HOPKINS
03/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
EDWIN HOPKINS
03/02/2026
Special inspection requirement — Final
EDWIN HOPKINS
03/02/2026
Special inspection requirement — Mechanical Systems
EDWIN HOPKINS
Latest 60 of 196 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedPROCIDA CONSTRUCTION CORP.09/11/2026
DOB NOWSprinklersPermit IssuedMILLER PLUMBING & HTG INC09/01/2026
DOB NOWGeneral ConstructionPermit IssuedPROCIDA CONSTRUCTION CORP.08/27/2026
DOB NOWPlumbingPermit IssuedMILLER PLBG & HTG INC06/10/2026
DOB NOWGeneral ConstructionPermit IssuedURBAN CONSTR & DESIGN LLC01/09/2026
DOB NOWSolarSigned-offACCORD POWER INC07/30/2025
DOB NOWBoiler EquipmentSigned-offMILLER PLBG & HTG INC03/20/2025
DOB NOWBoiler EquipmentSigned-offMILLER PLBG & HTG INC03/05/2025
DOB NOWStandpipeSigned-offMILLER PLUMBING & HTG INC09/16/2024
DOB NOWPlumbingSigned-offMILLER PLBG & HTG INC09/04/2024
DOB NOWSprinklersSigned-offMILLER PLUMBING & HTG INC09/04/2024
DOB NOWStandpipeSigned-offMILLER PLUMBING & HTG INC09/04/2024
DOB NOWBoiler EquipmentSigned-offBRADFORD MECH. CONTR INC05/30/2024
DOB NOWPlumbingSigned-offMILLER PLBG & HTG INC05/09/2024
DOB NOWProtection and Mechanical MethodsSigned-offSPRING SCAFFOLDING LLC05/07/2024
DOB NOWProtection and Mechanical MethodsSigned-offSPRING SCAFFOLDING LLC05/07/2024
DOB NOWConstruction FenceSigned-offPROCIDA CONSTRUCTION CORP.04/24/2024
DOB NOWSupported ScaffoldSigned-offCOLGATE ENTERPRISE CORP04/04/2024
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC02/15/2024
DOB NOWSupported ScaffoldSigned-offNORTHEAST MASONRY & RESTO12/21/2023
DOB NOWSupported ScaffoldSigned-offNORTHEAST MASONRY & RESTO11/08/2023
DOB NOWSprinklersSigned-offMILLER PLUMBING & HTG INC10/23/2023
DOB NOWSprinklersSigned-offMILLER PLUMBING & HTG INC10/23/2023
DOB NOWProtection and Mechanical MethodsSigned-offSPRING SCAFFOLDING LLC05/06/2023
DOB NOWProtection and Mechanical MethodsSigned-offSPRING SCAFFOLDING LLC05/06/2023
DOB NOWSupported ScaffoldSigned-offCOLGATE ENTERPRISE CORP04/25/2023
DOB NOWConstruction FenceSigned-offPROCIDA CONSTRUCTION CORP.04/18/2023
DOB NOWSupported ScaffoldSigned-offNORTHEAST MASONRY & RESTO04/15/2023
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC02/14/2023
DOB NOWPlumbingSigned-offMILLER PLBG & HTG INC01/06/2023
DOB NOWStandpipeSigned-offMILLER PLUMBING & HTG INC01/06/2023
DOB NOWPlumbingSigned-offMILLER PLBG & HTG INC12/02/2022
DOB NOWStandpipeSigned-offMILLER PLUMBING & HTG INC11/29/2022
DOB NOWStructuralSigned-offPROCIDA CONSTRUCTION CORP.10/26/2022
DOB NOWConstruction FenceSigned-offPROCIDA CONSTRUCTION CORP.07/14/2022
DOB NOWConstruction FenceSigned-offPROCIDA CONSTRUCTION CORP.04/21/2022
DOB NOWConstruction FenceSigned-offPROCIDA CONSTRUCTION CORP.09/22/2021
DOB NOWStandpipeSigned-offMILLER PLUMBING & HTG INC08/30/2021
DOB NOWConstruction FenceSigned-offPROCIDA CONSTRUCTION CORP.05/26/2021
DOB NOWStandpipeSigned-offMILLER PLUMBING & HTG INC05/07/2021
+ 21 more permits on file
1 project · most recent 12/24/2025
Ventilation Systems
FiledStatusContractorScope
12/24/2025Permit IssuedURBAN CONSTR & DESIGN LLCVentilation Systems
1 project · most recent 05/12/2026
Water/Sanitary
FiledStatusContractorScope
05/12/2026Permit IssuedMILLER PLBG & HTG INCWater/Sanitary
13 projects · most recent 08/27/2026
General Wiring Lighting
FiledStatusContractorScope
08/27/2026Permit IssuedBDS ELECTRIC CORP.General Wiring, Lighting
08/14/2026Permit IssuedACCORD POWER ELECTRIC LLC—
03/12/2026CompleteXTREME ELECTRIC INC—
09/09/2025CompleteTOTAL ELECTRIC SOLUTIONSGeneral Wiring
07/29/2025CompleteXTREME ELECTRIC INCGeneral Wiring
04/22/2024CompleteXTREME ELECTRIC INCGeneral Wiring
01/09/2024CompleteXTREME ELECTRIC INCGeneral Wiring
06/21/2023CompleteXTREME ELECTRIC INC—
05/01/2023CompleteXTREME ELECTRIC INC—
02/01/2023CompleteTOP SHELF ELECTRIC CORP—
10/19/2022CompleteXTREME ELECTRIC INCGeneral Wiring
08/29/2022CompleteRAINBOW ELECTRIC CO., INC1 meters, 1 new_meters
08/29/2022CompleteRAINBOW ELECTRIC CO., INC1 meters, 1 new_meters
1 project · most recent 07/28/2025
FiledStatusContractorScope
07/28/2025Signed-offACCORD POWER INC215 panels, 86 kw, 28,309.31 roof_area_sqft
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
03/21/2025Pass-Final Boiler Equipment InspectionPassView ↗
03/19/2025Pass-Final Boiler Equipment InspectionPassView ↗
12/18/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/13/2024Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
12/05/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/03/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/08/2024Fail-Final Boiler Equipment InspectionFailView ↗
09/19/2024Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
09/16/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
10/26/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/10/2023Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
10/10/2023Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
07/20/2023Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
07/20/2023Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
12/27/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 56
DateRequirementInspectorRole
05/12/2026Tenant Protection Plan ComplianceLuis Pichardospecial
03/17/2026HVAC-R and service water heating equipmentEDWIN HOPKINSenergy_progress
03/17/2026Maintenance informationEDWIN HOPKINSenergy_progress
03/17/2026Shutoff dampersEDWIN HOPKINSenergy_progress
03/17/2026HVAC-R and service water heating system controlsEDWIN HOPKINSenergy_progress
03/17/2026HVAC-R and service water piping design and insulationEDWIN HOPKINSenergy_progress
03/17/2026Fire-Resistance Rated ConstructionEDWIN HOPKINSprogress
03/17/2026Energy Code Compliance InspectionsEDWIN HOPKINSprogress
03/17/2026Heating SystemsEDWIN HOPKINSspecial
03/17/2026Fire-Resistant Penetrations and JointsEDWIN HOPKINSspecial
03/03/2026Tenant Protection Plan ComplianceEDWIN HOPKINSspecial
03/03/2026Tenant Protection Plan ComplianceEDWIN HOPKINSspecial
03/03/2026Lighting controlsEDWIN HOPKINSenergy_progress
03/03/2026Interior lighting powerEDWIN HOPKINSenergy_progress
03/03/2026FinalEDWIN HOPKINSprogress
03/03/2026Fire-Resistance Rated ConstructionEDWIN HOPKINSprogress
03/03/2026Energy Code Compliance InspectionsEDWIN HOPKINSprogress
03/03/2026Fire-Resistant Penetrations and JointsEDWIN HOPKINSspecial
03/02/2026FinalEDWIN HOPKINSprogress
03/02/2026Mechanical SystemsEDWIN HOPKINSspecial
12/19/2025Tenant Protection Plan ComplianceLuis Pichardospecial
12/10/2025FinalRONALD VILLANOprogress
12/10/2025Mechanical SystemsLuis Pichardospecial
05/14/2025Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
04/30/2025Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
Latest 25 of 56.
▾Documents — 239 on file (BIS + DOB NOW)
▸Plans & Drawings42
▸DOB NOWPlans/Sketch21
09/02/2026B00221009-S1Request digital key ↗
09/02/2026B00221009-P3Request digital key ↗
09/02/2026B00221009-P4Request digital key ↗
Showing 3 of 21 on file for this type
▸DOB NOWPlans/Sketch - Standpipe5
09/02/2026B00323382-I1Request digital key ↗
08/29/2026B00323347-P1Request digital key ↗
08/29/2026B00323347-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Plumbing5
09/02/2026B00221134-P4Request digital key ↗
09/01/2026B00221134-P3Request digital key ↗
09/01/2026B00221134-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler3
08/29/2026B00323347-P2Request digital key ↗
08/29/2026B00323347-I1Request digital key ↗
08/15/2026B00323347-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/02/2026B00221009-P1Request digital key ↗
09/02/2026B00221009-I1Request digital key ↗
09/02/2026B00221009-P6Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence2
09/01/2026B00412108-P1Request digital key ↗
09/01/2026B00412108-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural2
08/29/2026B00220806-P1Request digital key ↗
08/15/2026B00220806-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
09/02/2026B00373664-I1Request digital key ↗
▸Applications & Permits34
▸BISPLAN / WORK APPROVAL APPLICATION24
12/13/2024320688742Open ↗
12/13/2024320691621Open ↗
12/13/2024320688733Open ↗
Showing 3 of 24 on file for this type
▸BISWORK PERMIT APPLICATION8
07/13/2017321324072Open ↗
02/15/2013320748642Open ↗
02/15/2013320688742Open ↗
Showing 3 of 8 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
09/05/2024340724979Open ↗
04/21/2021340724979Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
06/20/2025321602191Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
06/20/2025321602191Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
06/20/2025321602191Open ↗
▸Seals & Professional Certifications75
▸DOB NOWDPL-1: Design Professional Seal & Signature39
09/01/2026B00412108-P1Open ↗
09/01/2026B00412108-I1Open ↗
09/01/2026B00590236-I1Open ↗
Showing 3 of 39 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
09/29/2026B01366019-I1Open ↗
09/27/2026B00221009-I1Open ↗
09/20/2026B00858383-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/29/2026B01366019-I1Open ↗
09/29/2026B01366019-I1Open ↗
09/27/2026B00221009-I1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
06/26/2017321324072Open ↗
01/24/2013320688733Open ↗
01/24/2013320688742Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
01/24/2013320688733Open ↗
01/24/2013320688742Open ↗
01/24/2013320748642Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
06/26/2017321324072Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
05/01/2020340724979Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
06/26/2017321324072Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREES SITE PLAN1
12/23/2020340724979Open ↗
▸BISSTREET TREE CHECKLIST1
10/26/2020340724979Open ↗
▸Environmental & Asbestos33
▸DOB NOWOER: Notice to Proceed19
09/01/2026B00412108-P1Open ↗
09/01/2026B00412108-I1Open ↗
08/13/2026B00323382-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWOER: Notice of Satisfaction6
08/13/2026B00221009-S2Open ↗
08/13/2026B00221009-S1Open ↗
08/13/2026B01366019-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
01/24/2013320688733Open ↗
01/24/2013320688742Open ↗
01/24/2013320748642Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
11/24/2009320088294Open ↗
11/24/2009320088301Open ↗
11/24/2009320088980Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
10/26/2020340724979Open ↗
▸Energy Compliance4
▸DOB NOWPreliminary Commissioning Report Certification3
08/13/2026B00221009-S2Open ↗
08/13/2026B00221009-S1Open ↗
08/13/2026B00221009-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
06/26/2017321324072Open ↗
▸Inspections & Test Reports1
▸DOB NOWConcrete Testing Exception Report1
08/13/2026B00220806-I1Open ↗
▸Approvals, Objections & Sign-offs9
▸BISADMINISTRATIVE OBJECTIONS7
01/24/2013320688733Open ↗
01/24/2013320688742Open ↗
01/24/2013320748642Open ↗
Showing 3 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
06/20/2025321602191Open ↗
06/20/2025321602191Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT8
06/26/2017321324072Open ↗
01/24/2013320688733Open ↗
01/24/2013320688742Open ↗
Showing 3 of 8 on file for this type
▸Filing & Intake Forms20
▸BISADDITIONAL INFORMATION8
06/29/2022340724979Open ↗
04/21/2021340724979Open ↗
04/08/2021340724979Open ↗
Showing 3 of 8 on file for this type
▸BISBOROUGH INTAKE FORM6
04/01/2020320748642Open ↗
04/01/2020320691621Open ↗
04/01/2020320688742Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING COVER SHEET5
06/30/2017321324072Open ↗
01/24/2013320688733Open ↗
01/24/2013320688742Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
05/01/2020340724979Open ↗
▸Other Documents8
▸BISBPP - SUPPORTING DOCUMENTATION4
06/29/2022340724979Open ↗
04/21/2021340724979Open ↗
11/09/2020340724979Open ↗
Showing 3 of 4 on file for this type
▸BISPLOT DIAGRAM1
06/20/2025321602191Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
06/29/2022340724979Open ↗
▸BISBPP-DOT: RELOCATE STREET LIGHT1
11/09/2020340724979Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
04/08/2021340724979Open ↗