← Back
Two family brick
257 HOLLYWOOD AVENUE
BRONX · Throgs Neck-Schuylerville · BIN 2077379
💬 Discuss this project
1930Year Built
2Stories
B1Building Class
R4-1Zoning
1,600 sfGross Floor Area
2Units
Two family brick · 2,638 sf lot · 0.61 FAR built · Flood zone X
Locations of Work
Plumbing
Sub-Basement4p · 1 filing · 4 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/23/2021$745K—— → —$466/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NYRON HALL ENGINEERING LLC210/08/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KC EXPEDITING INC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BEST PBG HTG & COOL INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IP CONCRETE TESTING AND I6252109/07/2022
Building Lifecycle
All (9)Filed (2)Permit Issued (2)Inspection (2)Objection (2)Special Inspection (1)
08/26/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/10/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/26/2025
Permit issued — Plumbing
X00792021-I1-PL
01/08/2025
Permit issued — Plumbing
X00792021-I1-PL
10/08/2024
Filed — Alteration
CONVERSION OF EXISTING OIL BOILER TO GAS BOILER, AND INSTALL A NEW GAS LINE CONNECTED TO EXISTING GAS METER LINE.
X00792021-P1
10/02/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/09/2022
Objection raised — Scope
09/09/2022
Objection resolved — Addressed
09/07/2022
Filed — Alteration
CONVERSION OF EXISTING OIL BOILER TO GAS BOILER, AND INSTALL A NEW GAS LINE CONNECTED TO EXISTING GAS METER LINE.
X00792021-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedBEST PBG HTG & COOL INC06/26/2025
DOB NOWPlumbingPermit IssuedBEST PBG HTG & COOL INC01/08/2025
1 project · most recent 10/08/2024
Gas
FiledStatusContractorScope
10/08/2024Permit IssuedPA MECHANICAL SVCS LLCGas
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
08/26/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/10/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
10/02/2024Fire-Resistant Penetrations and Joints—special
▾Documents — 4 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/20/2026X00792021-P1Request digital key ↗
08/15/2026X00792021-I1Request digital key ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/20/2026X00792021-I1Open ↗
08/13/2026X00792021-P1Open ↗