← Back
Church, synagogue, chapel
257 MACON STREET
BROOKLYN · BIN 3053112
💬 Discuss this project
1910Year Built
2Stories
M1Building Class
R6BZoning
9,300 sfGross Floor Area
0Units
2 Open Violations ▸FDNY Report ↗
Church, synagogue, chapel · 10,000 sf lot · 0.93 FAR built · Flood zone X
Locations of Work
Architecture
Roof6p · 2 filings · 10 docs
Cellar2p · 2 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEWMAN MEMORIAL UNITED METHODIST CH1207/08/2026
RELIABLE ENTERPRISES407/08/2026
NEWMAN MEMORIAL METHODIST CHURCH103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RS DESIGN ASSOCIATES, INC.612/18/2024
EMPIRE DESIGN CORP109/30/2021
ENTHINK ENGINEERS LLC109/22/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ALL CITY EXPEDITING203/21/2026
RS DESIGN ASSOCIATES1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
D.W.P. MAINTENANCE CORPGeneral Contractor303/21/2026
WILLDAN ELECTRICAL OF NYElectrical103/22/2026
RELIABLE ENTERPRISES INCGeneral Contractor107/08/2026
SHAHID CHOUDHARYGeneral Contractor107/08/2026
A & M WARSHAW PLBG & HTGPlumbing107/08/2026
XPRESS PLBG AND HTG LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ADS SPECIAL INSPECTIONS1270212/16/2024
EMPIRE DESIGN CORP5474109/30/2021
Building Lifecycle
All (40)Filed (8)Permit Issued (5)Signed Off (2)Violation (14)Inspection (8)Special Inspection (3)
05/22/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
05/16/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
05/09/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/24/2025
Signed off — Alteration
2" gas service for Boiler only, and 1" gas line from meter to (1)10 burner stove, (1) food warmer(1) hot water heater. Shut off valve for cooking equipment
B01148737-I1
04/15/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/10/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/18/2025
Violation issued (FDNY_ORDER, closed)
12/24/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
12/24/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/23/2024
Permit issued — General Construction
B01149329-I1-GC
12/18/2024
Filed — Alteration
REPLACE EXISTING BOILER WITH NEW GAS BOILER with in put of 19050000 bthu
B01149191-P1
12/16/2024
Filed — Alteration
B01149329-I1
12/16/2024
Permit issued — Boiler Equipment
B01149191-I1-BE
12/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
NISCHAL ARJUNE
12/16/2024
Special inspection requirement — Fire-Resistance Rated Construction
ERROL CRAWFORD
12/15/2024
Filed — Alteration
2" gas service for Boiler only, and 1" gas line from meter to (1)10 burner stove, (1) food warmer(1) hot water heater. Shut off valve for cooking equipment
B01148737-P1
12/12/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/05/2024
Permit issued — Plumbing
B01148737-I1-PL
12/02/2024
Filed — Alteration
B01147676-I1
12/02/2024
Filed — Alteration
REPLACE EXISTING BOILER WITH NEW GAS BOILER with in put of 19050000 bthu
B01149191-I1
12/02/2024
Special inspection requirement — Chimneys and vents
NISCHAL ARJUNE
12/01/2024
Filed — Alteration
2" gas service for Boiler only, and 1" gas line from meter to (1)10 burner stove, (1) food warmer(1) hot water heater. Shut off valve for cooking equipment
B01148737-I1
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/16/2022
Signed off — Alteration
B00598285-I1
10/04/2021
Permit issued — General Construction
B00604034-I1-GC
09/30/2021
Filed — Alteration
B00604034-I1
09/23/2021
Permit issued — Sidewalk Shed
B00598285-I1-SH
09/22/2021
Filed — Alteration
B00598285-I1
11/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/12/2011
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/02/2008
Violation issued (ECB, closed)
Construction
01/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/26/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/07/2000
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/16/1999
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/04/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/16/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/01/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/01/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedD.W.P. MAINTENANCE CORP12/23/2024
DOB NOWBoiler EquipmentSigned-offXPRESS PLBG AND HTG LLC12/16/2024
DOB NOWPlumbingSigned-offA & M WARSHAW PLBG & HTG12/05/2024
DOB NOWGeneral ConstructionPermit IssuedSHAHID CHOUDHARY10/04/2021
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC09/23/2021
BISPLISSUEDA & M WARSHAW PLBG & HTG09/03/2024
BISPLISSUEDXPRESS PLBG AND HTG LLC07/11/2024
BISBLISSUEDXPRESS PLBG AND HTG LLC07/11/2024
BISFPISSUEDWILLIAM HIRD & CO INC02/22/2011
BISBLISSUEDOJ PLBG & HTG INC06/08/1998
BISPLISSUEDOJ PLBG & HTG INC06/08/1998
BISFPISSUEDALL BORO FIRE AND SAFETY EQUIP.09/16/1991
2 projects · most recent 03/23/2022
General Wiring
FiledStatusContractorScope
03/23/2022Permit IssuedWILLDAN ELECTRICAL OF NYGeneral Wiring
09/23/2021Permit IssuedRICHARD NEU—
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
05/22/2025Fail-Final General Construction Non-Directive 14FailView ↗
05/16/2025Fail-Final General Construction Non-Directive 14FailView ↗
05/09/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/15/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/10/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/24/2024Pass-Final Boiler Equipment InspectionPassView ↗
12/24/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/12/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
12/16/2024Fire-Resistant Penetrations and JointsNISCHAL ARJUNEspecial
12/16/2024Fire-Resistance Rated ConstructionERROL CRAWFORDprogress
12/02/2024Chimneys and ventsNISCHAL ARJUNEspecial
▾Documents — 48 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
09/01/2026B00598285-I1Request digital key ↗
09/01/2026B00604034-I1Request digital key ↗
08/23/2026B01148737-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits10
▸BISPLAN / WORK APPROVAL APPLICATION6
11/06/2024320269794Open ↗
11/06/2024300731233Open ↗
04/19/2024300731233Open ↗
Showing 3 of 6 on file for this type
▸BISWORK PERMIT APPLICATION4
09/03/2024320269794Open ↗
07/12/2024300731233Open ↗
07/12/2024300731233Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications13
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/01/2026B00598285-I1Open ↗
09/01/2026B00604034-I1Open ↗
08/23/2026B01148737-P1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
02/16/2011320269794Open ↗
02/16/2011320269794Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026B01149329-I1Open ↗
09/01/2026B01149329-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/01/2026B01149329-I1Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
02/16/2011320269794Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
02/16/2011320269794Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
09/01/2026B00604034-I1Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
11/18/2024320269794Open ↗
11/15/2024300731233Open ↗
11/15/2024300731233Open ↗
▸Approvals, Objections & Sign-offs9
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter8
09/01/2026B00598285-I1Open ↗
09/01/2026B00604034-I1Open ↗
08/23/2026B01149191-I1Open ↗
Showing 3 of 8 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
02/16/2011320269794Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
02/16/2011320269794Open ↗
▸Filing & Intake Forms1
▸BISADDITIONAL INFORMATION1
11/21/2024320269794Open ↗