Two stories - detached, small or mid-size
257 POTTER AVENUE
STATEN ISLAND · BIN 5009209
💬 Discuss this project
1915Year Built
2Stories
A1Building Class
R2Zoning
3,216 sfGross Floor Area
1Units
0 Active Violations
Two stories - detached, small or mid-size · 7,000 sf lot · 0.46 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1p · 1 filing · 20 docs
Floor 219p · 2 filings · 20 docs
Floor 119p · 3 filings · 20 docs
Cellar2p · 1 filing · 6 docs
Basement17p · 1 filing · 20 docs
Site & exteriorFence installations1p · 1 filing · 2 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Michael Deruvo & Associates Architects509/07/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Michael Deruvo & Associates1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Champion InternationalGeneral Contractor803/21/2026
Champion InternationalScaffold307/08/2026
MPC Plumbing & HeatingPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A Tech Engineering NYC, P6738104/25/2022
Building Lifecycle
03/01/2025
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
S00723922-I1-GC
09/08/2024
Permit expired, never signed off — Plumbing
The city's record still shows this permit as issued, with no sign-off on its filing
S00724735-I1-PL
07/02/2024
Permit renewed — General Construction
Renewed without changes
S00723922-I1-GC
06/28/2024
Permit renewed — General Construction
Renewed without changes
S00723922-I1-GC
06/05/2024
Signed off — Alteration
APPLICATION FILED HEREWITH TO ERECT CONSTRUCTION FENCE IN CONJUNCTION WITH ALT. 1 APPLICATION.
S00692044-I1
50 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedChampion International07/02/2024
DOB NOWGeneral ConstructionPermit IssuedChampion International06/28/2024
DOB NOWFoundationPermit IssuedChampion International04/01/2024
DOB NOWPlumbingPermit IssuedMPC Plumbing & Heating09/08/2023
DOB NOWGeneral ConstructionPermit IssuedChampion International04/02/2023
DOB NOWConstruction FenceSigned-offChampion International03/17/2023
DOB NOWPlumbingPermit IssuedMPC Plumbing & Heating10/04/2022
DOB NOWConstruction FenceSigned-offChampion International09/26/2022
1 project · most recent 09/07/2023
Gas Water/Sanitary
FiledStatusContractorScope
09/07/2023Permit IssuedMPC Plumbing & HeatingGas, Water/Sanitary
2 projects · most recent 04/10/2023
General Wiring
FiledStatusContractorScope
04/10/2023Permit IssuedStaten Island ElectricGeneral Wiring
11/12/2022Permit IssuedStaten Island ElectricGeneral Wiring
1 project · most recent 04/25/2022
FiledStatusContractorScope
04/25/2022Permit IssuedChampion International—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
04/18/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/09/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/08/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/11/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/02/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
06/21/2022FireplacesMICHAEL DERUVOenergy_progress
06/21/2022MeteringMICHAEL DERUVOenergy_progress
06/21/2022Electric vehicle service equipment requirementsMICHAEL DERUVOenergy_progress
04/22/2022Subgrade Inspectionsanthony santorospecial
04/22/2022Subsurface Investigations (Borings/Test Pits)MICHAEL DERUVOspecial
04/22/2022Energy Code Compliance InspectionsMICHAEL DERUVOprogress
04/22/2022Fire-Resistance Rated ConstructionMICHAEL DERUVOprogress
04/22/2022PreliminaryMICHAEL DERUVOprogress
04/22/2022FinalMICHAEL DERUVOprogress
04/22/2022Footing and FoundationMICHAEL DERUVOprogress
04/22/2022Fenestration and door U-factor and product ratingsMICHAEL DERUVOenergy_progress
04/22/2022Protection of exposed foundation insulationMICHAEL DERUVOenergy_progress
04/22/2022Fenestration areasMICHAEL DERUVOenergy_progress
04/22/2022Air barrier — testing anthony santoroenergy_progress
04/22/2022Interior lighting powerMICHAEL DERUVOenergy_progress
04/22/2022Insulation placement and R valuesMICHAEL DERUVOenergy_progress
04/22/2022Air barrier - visual inspectionanthony santoroenergy_progress
04/22/2022Maintenance informationMICHAEL DERUVOenergy_progress
04/22/2022Fenestration air leakageMICHAEL DERUVOenergy_progress
04/22/2022Concrete - Cast-In-Placeanthony santorospecial
04/22/2022Permanent certificateMICHAEL DERUVOenergy_progress
04/22/2022Fire-Resistant Penetrations and Jointsanthony santorospecial
04/22/2022Structural Stability – Alterations of existing buildingsanthony santorospecial
56 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account