← Back
Two stories - detached, small or mid-size
257 RUGBY ROAD
BROOKLYN · BIN 3118388
💬 Discuss this project
1897Year Built
2.5Stories
A1Building Class
R3XZoning
2,638 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · Owner of record: THE ERIK TAYE MARIKA-RICH EXEMPT TRUST · 5,000 sf lot · 0.53 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 7 docs
Basement1p · 1 filing · 7 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/29/2022$3.5M—Private party → THE ERIK TAYE MARIKA-RICH EXEMPT TRUST$1,327/sf building
04/26/2021$2.5M—— → —$960/sf building
08/22/2019$1.1M—Private party → 663 RUGBY REALTY CORP.$426/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SQUARE ARCH, LLC109/23/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUSTAINABLE STRATEGIESGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SQ. ARCH, LLC4802109/23/2025
Building Lifecycle
All (7)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (4)
02/05/2026
Signed off — Alteration
INSTALLATION OF SOLAR ELECTRIC GENERATION SYSTEM FOR UTILITY INTERCONNECTION
B01291586-I1
11/07/2025
Permit issued — Solar
B01291586-I1-SL
09/23/2025
Filed — Alteration
INSTALLATION OF SOLAR ELECTRIC GENERATION SYSTEM FOR UTILITY INTERCONNECTION
B01291586-I1
09/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chun Feng
09/23/2025
Special inspection requirement — Energy Code Compliance Inspections
Chun Feng
09/23/2025
Special inspection requirement — Final
Chun Feng
09/23/2025
Special inspection requirement — Air barrier - visual inspection
Chun Feng
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUSTAINABLE STRATEGIES11/07/2025
2 projects · most recent 09/23/2025
General Wiring
FiledStatusContractorScope
09/23/2025CompleteSOURCE ELECTRIC INC1 meters
10/22/2019CompleteACS ELECTRICAL CORPGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
09/23/2025Fire-Resistant Penetrations and JointsChun Fengspecial
09/23/2025Energy Code Compliance InspectionsChun Fengprogress
09/23/2025FinalChun Fengprogress
09/23/2025Air barrier - visual inspectionChun Fengenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/20/2026B01291586-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026B01291586-I1Open ↗
08/25/2026B01291586-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026B01291586-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/25/2026B01291586-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B01291586-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01291586-I1Open ↗