← Back
Predominantly retail with other uses
257 SCHENECTADY AVENUE
BROOKLYN · BIN 3037316
💬 Discuss this project
1920Year Built
2Stories
K4Building Class
R6Zoning
1,700 sfGross Floor Area
1Units
Predominantly retail with other uses · Owner of record: RANDAZZO ENTERPRISES,LLC · 1,780 sf lot · 0.96 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FACTORY ENGINEERING WORKS PLLC111/25/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GZ NC CODE PLANNING ENGINEERING103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CEPHEUS.CONSTRUCTIONGeneral Contractor108/06/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GZ & NC CODE CONSULTING P7492111/25/2024
Building Lifecycle
All (11)Filed (1)Permit Issued (1)Special Inspection (9)
08/05/2026
Permit issued — Structural
B01124774-I1-GC-CX
11/25/2024
Filed — Alteration
Miscellaneous facade repairs. Work to include removal & reconstruction of second floor front facade, masonry repairs, and new lintels. No change in use, egress nor occupancy.
B01124774-I1
11/20/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Nazzareno Callipo
11/20/2024
Special inspection requirement — Fenestration areas
Nazzareno Callipo
11/20/2024
Special inspection requirement — Masonry
Nazzareno Callipo
11/20/2024
Special inspection requirement — Post-installed Anchors
Nazzareno Callipo
11/20/2024
Special inspection requirement — Structural Steel - Details
Nazzareno Callipo
11/20/2024
Special inspection requirement — Fenestration air leakage
Nazzareno Callipo
11/20/2024
Special inspection requirement — Insulation placement and R values
Nazzareno Callipo
10/09/2024
Special inspection requirement — Final
Nazzareno Callipo
10/09/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Nazzareno Callipo
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedCEPHEUS.CONSTRUCTION08/05/2026
1 project · most recent 08/22/2018
FiledStatusContractorScope
08/22/2018CompleteWILLDAN ELECTRICAL OF NY—
1 project · most recent 11/25/2024
Steel Masonry
FiledStatusContractorScope
11/25/2024Permit IssuedCEPHEUS.CONSTRUCTIONSteel, Masonry
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
11/20/2024Fenestration and door U-factor and product ratingsNazzareno Callipoenergy_progress
11/20/2024Fenestration areasNazzareno Callipoenergy_progress
11/20/2024MasonryNazzareno Callipospecial
11/20/2024Post-installed AnchorsNazzareno Callipospecial
11/20/2024Structural Steel - DetailsNazzareno Callipospecial
11/20/2024Fenestration air leakageNazzareno Callipoenergy_progress
11/20/2024Insulation placement and R valuesNazzareno Callipoenergy_progress
10/09/2024FinalNazzareno Callipoprogress
10/09/2024Structural Stability – Alterations of existing buildingsNazzareno Callipospecial
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/23/2026B01124774-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/23/2026B01124774-I1Open ↗
08/23/2026B01124774-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026B01124774-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026B01124774-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B01124774-I1Open ↗
▸Other Documents1
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/23/2026B01124774-I1Open ↗