← Back
BuildNYC
Three families
2574 RADCLIFF AVENUE
BRONX · BIN 2051648
💬 Discuss this project
1930Year Built
2Stories
C0Building Class
R5Zoning
2,745 sfGross Floor Area
3Units
Rent Stabilized7 Active Violations ▸
Three families · Owner of record: 924 Prestige Realty · 2,502 sf lot · 1.1 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 2PRESTIGE CAR SERVICE INTERIOR RENOVATION8p · 4 filings · 20 docs
Floor 1PRESTIGE CAR SERVICE INTERIOR RENOVATION5p · 4 filings · 20 docs
BasementPRESTIGE CAR SERVICE INTERIOR RENOVATION7p · 2 filings · 20 docs
Sub-BasementPRESTIGE CAR SERVICE INTERIOR RENOVATION2p · 3 filings · 16 docs
Site & exterior3p · 1 filing · 20 docs
Filed — no permit issuedElectric vehicle charger installation1p · 2 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
924 Prestige Realty2810/13/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/15/2019$775K—2574 RADCLIFF LLC → 924 Prestige Realty$282/sf building
12/28/2017$560K—Private party → 2574 RADCLIFF LLC$204/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BL Consultant1109/22/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
F1CAD403/21/2026
Professional Solutions503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A P Plumbing & HeatingPlumbing308/22/2026
Anm ConstructionGeneral Contractor203/21/2026
Symmetrical ConstructionGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Ramirez Engineering8679205/20/2026
Building Lifecycle
11/04/2026
Signed off — Alteration
plumbing work to cap and remove stove, bath tub and sink in basement and first floor, install new non residential sink in basement and replace the fixtures in the second floor and Cap and remove the gas stove and replace with electrical unit
X01440349-I1
09/22/2026
Filed — Alteration
plumbing work to cap and remove stove, bath tub and sink in basement and first floor, install new non residential sink in basement and replace the fixtures in the second floor and Cap and remove the gas stove and replace with electrical unit
X01440349-P2
09/02/2026
Filed — Alteration
plumbing work to cap and remove stove, bath tub and sink in basement and first floor, install new non residential sink in basement and replace the fixtures in the second floor and Cap and remove the gas stove and replace with electrical unit
X01440349-P1
08/21/2026
Permit issued — Plumbing
X01440349-I1-PL
08/17/2026
Filed — Alteration
plumbing work to cap and remove stove, bath tub and sink in basement and first floor, install new non residential sink in basement and replace the fixtures in the second floor and Cap and remove the gas stove and replace with electrical unit
X01440349-I1
112 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offA P Plumbing & Heating08/21/2026
DOB NOWGeneral ConstructionPermit IssuedAnm Construction11/21/2025
DOB NOWGeneral ConstructionPermit IssuedSymmetrical Construction04/17/2024
DOB NOWPlumbingSigned-offA P Plumbing & Heating06/07/2023
DOB NOWPlumbingSigned-offA P Plumbing & Heating09/28/2020
1 project · most recent 09/22/2026
Gas Water/Sanitary
FiledStatusContractorScope
09/22/2026Signed-offA P Plumbing & HeatingGas, Water/Sanitary
2 projects · most recent 08/08/2025
General Wiring
FiledStatusContractorScope
08/08/2025Permit IssuedL J Electrical ServiceGeneral Wiring
10/21/2024Permit IssuedL J Electrical ServiceGeneral Wiring
1 project · most recent 11/09/2021
Wood
FiledStatusContractorScope
11/09/2021——Wood
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
04/30/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/20/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/06/2026Fail-Final CND-Occupancy InspectionFailView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
07/09/2026Structural Stability – Alterations of existing buildingsAmauris Ramirezspecial
07/09/2026Fire-Resistant Penetrations and JointsAmauris Ramirezspecial
07/09/2026Lighting controlsBALDEMIRO LEONenergy_progress
07/09/2026HVAC-R and service water piping design and insulationBALDEMIRO LEONenergy_progress
07/09/2026Insulation placement and R valuesBALDEMIRO LEONenergy_progress
07/09/2026Fenestration air leakageBALDEMIRO LEONenergy_progress
07/09/2026Interior lighting powerBALDEMIRO LEONenergy_progress
07/09/2026Fenestration and door U-factor and product ratingsBALDEMIRO LEONenergy_progress
07/09/2026HVAC-R and service water heating equipmentBALDEMIRO LEONenergy_progress
07/09/2026Tenant Protection Plan ComplianceAmauris Ramirezspecial
05/13/2026Fire-Resistant Penetrations and JointsAmauris Ramirezspecial
05/13/2026Lighting controlsBALDEMIRO LEONenergy_progress
05/13/2026Insulation placement and R valuesBALDEMIRO LEONenergy_progress
05/13/2026Interior lighting powerBALDEMIRO LEONenergy_progress
05/13/2026HVAC-R and service water heating equipmentBALDEMIRO LEONenergy_progress
05/13/2026HVAC-R and service water piping design and insulationBALDEMIRO LEONenergy_progress
05/13/2026Fenestration air leakageBALDEMIRO LEONenergy_progress
05/13/2026Fenestration and door U-factor and product ratingsBALDEMIRO LEONenergy_progress
05/13/2026Tenant Protection Plan ComplianceAmauris Ramirezspecial
05/13/2026Structural Stability – Alterations of existing buildingsAmauris Ramirezspecial
09/04/2025FinalBALDEMIRO LEONprogress
02/11/2025Air barrier — testing —energy_progress
02/11/2025Air barrier - visual inspection—energy_progress
10/20/2023Permanent certificateBALDEMIRO LEONenergy_progress
10/18/2023Permanent certificateBALDEMIRO LEONenergy_progress
Latest 25 of 30.
50 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account