2574 RADCLIFF AVENUE
BRONX · Allerton · BIN 2051648
💬 Discuss this project
1930Year Built
2Stories
C0Building Class
R5Zoning
2,745 sfGross Floor Area
3Units
Rent Stabilized7 Open Violations ▸
Three families · Owner of record: 924 PRESTIGE REALTY LLC · 2,502 sf lot · 1.1 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Permit Issued — active, not yet Signed-off
Floor 2Under Construction6p · 4 filings · 20 docs
Floor 1Under Construction4p · 4 filings · 20 docs
BasementUnder Construction5p · 1 filing · 20 docs
Sub-BasementUnder Construction2p · 3 filings · 14 docs
Site & exteriorUnder Construction2p · 1 filing · 20 docs
Filed — no permit issued1p · 2 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
924 PRESTIGE REALTY LLC2508/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/15/2019$775K—2574 RADCLIFF LLC → 924 PRESTIGE REALTY LLC$282/sf building
12/28/2017$560K—Private party → 2574 RADCLIFF LLC$204/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BL CONSULTANT908/17/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
F1CAD403/21/2026
PROFESSIONAL SOLUTIONS503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A P PLUMBING&HEATING INCPlumbing308/22/2026
ANM CONSTRUCTION CORPGeneral Contractor203/21/2026
SYMMETRICAL CONSTRUC CORPGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RAMIREZ ENGINEERING PLLC8679205/20/2026
Building Lifecycle
All (150)Filed (9)Permit Issued (5)Signed Off (1)Violation (22)Inspection (3)Objection (80)Special Inspection (30)
08/21/2026
Permit issued — Plumbing
X01440349-I1-PL
08/17/2026
Filed — Alteration
plumbing work to cap and remove stove, bath tub and sink in basement and first floor, install new non residential sink in basement and replace the fixtures in the second floor and Cap and remove the gas stove and replace with electrical unit
X01440349-I1
07/09/2026
Special inspection requirement — Tenant Protection Plan Compliance
Amauris Ramirez
07/09/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Amauris Ramirez
07/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Amauris Ramirez
07/09/2026
Special inspection requirement — Lighting controls
BALDEMIRO LEON
07/09/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
BALDEMIRO LEON
07/09/2026
Special inspection requirement — Insulation placement and R values
BALDEMIRO LEON
07/09/2026
Special inspection requirement — Fenestration air leakage
BALDEMIRO LEON
07/09/2026
Special inspection requirement — Interior lighting power
BALDEMIRO LEON
07/09/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
BALDEMIRO LEON
07/09/2026
Special inspection requirement — HVAC-R and service water heating equipment
BALDEMIRO LEON
06/29/2026
Objection resolved — Addressed
06/25/2026
Objection raised — C/O of existing property requi
06/10/2026
Objection resolved — Addressed
06/05/2026
Objection raised — Scope
05/20/2026
Filed — Alteration CO
CHANGE OF USE IN BASEMENT AND FIRST FLOOR OF EXISTING BUILDING FROM RESIDENTIAL TO COMMERCIAL, PROPOSED OFFICES FOR A TAXI COMPANY. The second floor will remain residential Proposed 5 Accessory Parking for commercial. Entrances Renovation. Site Work.
X01179175-P1
05/13/2026
Special inspection requirement — Lighting controls
BALDEMIRO LEON
05/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Amauris Ramirez
05/13/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Amauris Ramirez
05/13/2026
Special inspection requirement — Tenant Protection Plan Compliance
Amauris Ramirez
05/13/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
BALDEMIRO LEON
05/13/2026
Special inspection requirement — Fenestration air leakage
BALDEMIRO LEON
05/13/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
BALDEMIRO LEON
05/13/2026
Special inspection requirement — HVAC-R and service water heating equipment
BALDEMIRO LEON
05/13/2026
Special inspection requirement — Interior lighting power
BALDEMIRO LEON
05/13/2026
Special inspection requirement — Insulation placement and R values
BALDEMIRO LEON
04/30/2026
Violation issued (HPD, open)
A
04/30/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/20/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/06/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
11/21/2025
Permit issued — General Construction
X01179175-I1-GC
10/15/2025
Objection resolved — Addressed
10/14/2025
Objection raised — C/O of existing property requi
10/09/2025
Objection resolved — Addressed
10/06/2025
Objection raised — C/O of existing property requi
09/29/2025
Objection resolved — Addressed
09/23/2025
Objection raised — Other
09/08/2025
Objection resolved — Addressed
09/06/2025
Filed — Alteration
PROPOSED ELECTRIC VEHICLE CHARGING STATIONS FOR A TAXI CAR SERVICE COMPANY IN OPEN ACCESSORY PARKING FOR EXISTING BUILDING. THIS APPLICATION IN CONJUNCTION WITH ELECTRIC APPLICATION #X0216826. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
X01282372-I1
09/04/2025
Special inspection requirement — Final
BALDEMIRO LEON
08/25/2025
Objection raised — C/O of existing property requi
08/12/2025
Filed — Alteration CO
CHANGE OF USE IN BASEMENT AND FIRST FLOOR OF EXISTING BUILDING FROM RESIDENTIAL TO COMMERCIAL, PROPOSED OFFICES FOR A TAXI COMPANY. The second floor will remain residential Proposed 5 Accessory Parking for commercial. Entrances Renovation. Site Work.
X01179175-S1
07/28/2025
Objection resolved — Addressed
07/28/2025
Objection resolved — Addressed
07/28/2025
Objection resolved — Addressed
07/24/2025
Objection resolved — Addressed
06/05/2025
Violation issued (HPD, open)
A
03/26/2025
Objection raised — Energy
03/26/2025
Objection raised — C/O of existing property requi
03/26/2025
Objection raised — Admin
03/26/2025
Objection raised — Cost
03/17/2025
Filed — Alteration CO
CHANGE OF USE IN BASEMENT AND FIRST FLOOR OF EXISTING BUILDING FROM RESIDENTIAL TO COMMERCIAL, PROPOSED OFFICES FOR A TAXI COMPANY. The second floor will remain residential Proposed 5 Accessory Parking for commercial. Entrances Renovation. Site Work.
X01179175-I1
02/11/2025
Special inspection requirement — Air barrier — testing
02/11/2025
Special inspection requirement — Air barrier - visual inspection
11/25/2024
Violation issued (HPD, closed)
I
04/17/2024
Permit issued — General Construction
X01034988-I1-GC
04/15/2024
Filed — Alteration
PROPOSED INTERIOR RENOVATION OF EXISTING BUILDING, FLOORS , WALLS, CEILINGS AND BATHROOM /KITCHEN , NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X01034988-I1
04/08/2024
Objection raised — Admin
04/08/2024
Objection resolved — Resolved
Latest 60 of 150 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedA P PLUMBING&HEATING INC08/21/2026
DOB NOWGeneral ConstructionPermit IssuedANM CONSTRUCTION11/21/2025
DOB NOWGeneral ConstructionPermit IssuedSYMMETRICAL CONSTRUC CORP04/17/2024
DOB NOWPlumbingSigned-offA P PLUMBING&HEATING INC06/07/2023
DOB NOWPlumbingSigned-offA P PLUMBING&HEATING INC09/28/2020
1 project · most recent 08/17/2026
Gas Water/Sanitary
FiledStatusContractorScope
08/17/2026Permit IssuedA P PLUMBING&HEATING INCGas, Water/Sanitary
2 projects · most recent 08/08/2025
General Wiring
FiledStatusContractorScope
08/08/2025Permit IssuedL J ELEC'L SERV. INC.General Wiring
10/21/2024Permit IssuedL J ELEC'L SERV. INC.General Wiring
1 project · most recent 11/09/2021
Wood
FiledStatusContractorScope
11/09/2021——Wood
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
04/30/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/20/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/06/2026Fail-Final CND-Occupancy InspectionFailView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
07/09/2026Tenant Protection Plan ComplianceAmauris Ramirezspecial
07/09/2026Structural Stability – Alterations of existing buildingsAmauris Ramirezspecial
07/09/2026Fire-Resistant Penetrations and JointsAmauris Ramirezspecial
07/09/2026Lighting controlsBALDEMIRO LEONenergy_progress
07/09/2026HVAC-R and service water piping design and insulationBALDEMIRO LEONenergy_progress
07/09/2026Insulation placement and R valuesBALDEMIRO LEONenergy_progress
07/09/2026Fenestration air leakageBALDEMIRO LEONenergy_progress
07/09/2026Interior lighting powerBALDEMIRO LEONenergy_progress
07/09/2026Fenestration and door U-factor and product ratingsBALDEMIRO LEONenergy_progress
07/09/2026HVAC-R and service water heating equipmentBALDEMIRO LEONenergy_progress
05/13/2026Lighting controlsBALDEMIRO LEONenergy_progress
05/13/2026Fire-Resistant Penetrations and JointsAmauris Ramirezspecial
05/13/2026Structural Stability – Alterations of existing buildingsAmauris Ramirezspecial
05/13/2026Tenant Protection Plan ComplianceAmauris Ramirezspecial
05/13/2026Fenestration and door U-factor and product ratingsBALDEMIRO LEONenergy_progress
05/13/2026Fenestration air leakageBALDEMIRO LEONenergy_progress
05/13/2026HVAC-R and service water piping design and insulationBALDEMIRO LEONenergy_progress
05/13/2026HVAC-R and service water heating equipmentBALDEMIRO LEONenergy_progress
05/13/2026Interior lighting powerBALDEMIRO LEONenergy_progress
05/13/2026Insulation placement and R valuesBALDEMIRO LEONenergy_progress
09/04/2025FinalBALDEMIRO LEONprogress
02/11/2025Air barrier — testing —energy_progress
02/11/2025Air barrier - visual inspection—energy_progress
10/20/2023Permanent certificateBALDEMIRO LEONenergy_progress
10/18/2023Permanent certificateBALDEMIRO LEONenergy_progress
Latest 25 of 30.
▾Documents — 48 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch6
08/21/2026X01034988-I1Request digital key ↗
08/18/2026X01440349-I1Request digital key ↗
08/18/2026X01282372-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
08/26/2026X00395932-I1Request digital key ↗
08/26/2026X00395932-P1Request digital key ↗
▸Seals & Professional Certifications29
▸DOB NOWProgress Inspector Seal & Signature15
08/23/2026X00395932-I1Open ↗
08/23/2026X01179175-I1Open ↗
08/23/2026X01179175-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/26/2026X00395932-P1Open ↗
08/26/2026X00395932-I1Open ↗
08/21/2026X01034988-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/23/2026X01179175-I1Open ↗
08/23/2026X01179175-I1Open ↗
08/23/2026X01179175-I1Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWTenant Protection Plan2
08/13/2026X00395932-P1Open ↗
08/13/2026X00395932-I1Open ↗
▸DOB NOWStreet Tree Checklist2
08/14/2026X01179175-I1Open ↗
08/14/2026X01179175-P1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/26/2026X00395932-P1Open ↗
08/26/2026X00395932-I1Open ↗
08/14/2026X01179175-I1Open ↗
Showing 3 of 4 on file for this type
▸Other Documents3
▸DOB NOWProperty Ownership Certification2
08/14/2026X01179175-I1Open ↗
08/14/2026X01179175-P1Open ↗
▸DOB NOWFinal Survey1
08/13/2026X01179175-I1Open ↗