← Back
BuildNYC
Over six families without stores
Los Sures Sip
258 GRAND STREET · BIN 3062814
💬 Discuss this project
1910Year Built
6Stories
C1Building Class
R6BZoning
25,839 sfGross Floor Area
23Units
LL97 CoveredRent Stabilized58 Active Violations 3 old, status unconfirmed ▸FDNY Report ↗
Over six families without stores · Owner of record: Los Sures Sip HDFC · 5,042 sf lot · 5.12 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofLos Sures RehabilitationUnder Construction25p · 5 filings · 20 docs
Floor 6Los Sures RehabilitationUnder Construction15p · 2 filings · 20 docs
Floor 5Los Sures RehabilitationUnder Construction15p · 2 filings · 20 docs
Floor 4Los Sures RehabilitationUnder Construction15p · 2 filings · 20 docs
Floor 3Los Sures RehabilitationUnder Construction15p · 2 filings · 20 docs
Floor 2Los Sures RehabilitationUnder Construction15p · 2 filings · 20 docs
Floor 1Heavy duty sidewalk shed installationUnder Construction22p · 3 filings · 20 docs
CellarLos Sures RehabilitationUnder Construction23p · 3 filings · 20 docs
Site & exteriorLos Sures RehabilitationUnder Construction20p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Southside United-Los Sures Management1808/29/2026
Los Sures Sip Housing Fund403/21/2026
Los Sures Sip HDFC303/22/2026
NYC Department of Housing Preservation and Development103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Synergic Design Architects105/28/2026
Mje Professional Services201/15/2026
Cta Architects311/14/2025
Collado Engineering208/09/2024
Cowley Engineering106/28/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SNR Expediting Design403/21/2026
Sandeep Kaur103/21/2026
Municipal Building Consultants503/21/2026
Theresa Voltaggio103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A.A.D. ConstructionGeneral Contractor607/08/2026
A & H InstallationScaffold610/16/2026
AJC Plumbing & HeatingPlumbing207/08/2026
Spectrum ElectricElectrical103/21/2026
Techno-Volt ElectricElectrical103/22/2026
Accord PowerGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Synergic Design8561105/28/2026
Metric Consulting and Ins1803611/14/2025
Cowley Engineering186106/28/2024
Building Lifecycle
10/15/2026
Permit renewed — Sidewalk Shed
Renewed without changes
B01206659-I1-SH
08/18/2026
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE NORTH WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED…
HPD violation · open
08/18/2026
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE PRIVATE HALLWAY LOCATED AT APT…
HPD violation · open
08/18/2026
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQUARE FEET AT 1ST WINDOW FRAME FROM EAST AT…
HPD violation · open
08/18/2026
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 2nd ROOM FROM NORTH AT EAST…
HPD violation · open
271 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedA & H Installation10/15/2026
DOB NOWSidewalk ShedPermit IssuedA & H Installation07/23/2026
DOB NOWSolarPermit IssuedAccord Power06/10/2026
DOB NOWStructuralPermit IssuedA.A.D. Construction03/03/2026
DOB NOWGeneral ConstructionPermit IssuedA.A.D. Construction03/03/2026
DOB NOWSupported ScaffoldPermit IssuedA H Installation01/22/2026
DOB NOWPlumbingPermit IssuedAJC Plumbing & Heating12/03/2025
DOB NOWSuspended ScaffoldPermit IssuedSSD Interior11/26/2025
DOB NOWGeneral ConstructionPermit IssuedA.A.D. Construction10/07/2025
DOB NOWSidewalk ShedPermit IssuedA H Installation04/08/2025
DOB NOWPlumbingPermit IssuedAJC Plumbing & Heating12/06/2024
DOB NOWGeneral ConstructionPermit IssuedA.A.D. Construction12/04/2024
DOB NOWGeneral ConstructionPermit IssuedA.A.D. Construction11/07/2024
BISOTISSUEDFG-PH11/09/2016
BISPLISSUEDCegf & G Plumbing05/28/2016
BISEQISSUEDColgate Enterprise04/07/2016
BISPLISSUEDOlympia Plbing & Heating03/24/2016
BISOTISSUEDFG-PH11/12/2015
BISEQISSUEDColgate Enterprise04/24/2015
BISPLISSUEDCegf & G Plumbing12/08/2014
BISOTISSUEDFG-PH12/08/2014
BISPLISSUEDBeta Plumbing & Heating03/21/2011
BISBLISSUEDBeta Plumbing & Heating03/21/2011
BISBLISSUEDParkset Plumbing12/18/1991
BISPLISSUEDParkset Plumbing12/18/1991
BISEQISSUEDEmd Construction04/05/1991
BISEQISSUEDEmd Construction10/18/1990
1 project · most recent 08/09/2024
Ventilation Systems
FiledStatusContractorScope
08/09/2024——Ventilation Systems
1 project · most recent 07/25/2024
Water/Sanitary
FiledStatusContractorScope
07/25/2024Permit IssuedAJC Plumbing & HeatingWater/Sanitary
4 projects · most recent 05/06/2026
General Wiring
FiledStatusContractorScope
05/06/2026Permit IssuedAccord Power Electric—
07/21/2025CompleteTechno-Volt ElectricGeneral Wiring
04/08/2025Permit IssuedRichard Neu—
03/25/2025CompleteTechno-Volt ElectricGeneral Wiring
1 project · most recent 06/28/2024
Steel
FiledStatusContractorScope
06/28/2024Permit IssuedA.A.D. ConstructionSteel
1 project · most recent 05/28/2026
FiledStatusContractorScope
05/28/2026Permit IssuedAccord Power—
1 project · most recent 01/15/2026
Scaffold
FiledStatusContractorScope
01/15/2026Permit IssuedA & H InstallationScaffold
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
06/24/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/22/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
12/05/2025Air barrier - visual inspectionSAMI HAJJAR P.Eenergy_progress
12/05/2025Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
12/05/2025MasonrySAMI HAJJAR P.Especial
12/05/2025Post-installed AnchorsSAMI HAJJAR P.Especial
12/05/2025Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
12/05/2025Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
12/05/2025FinalSAMI HAJJAR P.Eprogress
12/05/2025Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
11/04/2025Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
11/04/2025MasonrySAMI HAJJAR P.Especial
11/04/2025Post-installed AnchorsSAMI HAJJAR P.Especial
11/04/2025Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
11/04/2025Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
11/04/2025Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
11/04/2025FinalSAMI HAJJAR P.Eprogress
11/04/2025Air barrier - visual inspectionSAMI HAJJAR P.Eenergy_progress
03/27/2025FinalSAMI HAJJAR P.Eprogress
03/27/2025Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
03/27/2025MasonrySAMI HAJJAR P.Especial
03/27/2025Post-installed AnchorsSAMI HAJJAR P.Especial
03/27/2025Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
03/27/2025Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
03/27/2025Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
03/27/2025Air barrier - visual inspectionSAMI HAJJAR P.Eenergy_progress
06/12/2024Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
Latest 25 of 28.
104 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account