← Back
Miscellaneous one family
258 LINCOLN ROAD
BROOKLYN · BIN 3114749
💬 Discuss this project
1910Year Built
2Stories
A9Building Class
R2Zoning
2,600 sfGross Floor Area
1Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Miscellaneous one family · 2,100 sf lot · 1.24 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PORTER CLAPP ARCHITECTS311/19/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
TRIBECA CONST CONSULTING603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GARADICE BUILDERS INCGeneral Contractor207/08/2026
J&M PLUMBING OF WESTCHESTERPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JACK GREEN ASSOCIATES422111/19/2025
THE ORDERING FORCE9406107/10/2025
Building Lifecycle
All (27)Filed (3)Permit Issued (3)Signed Off (3)Violation (4)Inspection (2)Objection (8)Special Inspection (4)
03/17/2026
Signed off — Alteration
Install new HVAC.
B01319695-I1
03/17/2026
Signed off — Alteration
Add new powder room at 1st floor and renovate exist bathroom and add new bathroom at 2nd floor. Replace existing rear wood deck with a metal deck at 1st floor. Replace all existing windows and door at rear of the building. New skylight at roof level.
B01253472-I1
03/17/2026
Signed off — Alteration
Replace PL fixtures at Basement. New powder room PL fixtures at 1st floor. Replace exist. bathroom PL fixtures and add new bathroom PL fixtures at 2nd floor. All work in conjunction with GC_B01253472.
B01253530-I1
02/13/2026
Permit issued — Mechanical Systems
B01319695-I1-MS
01/19/2026
Objection resolved — Addressed
01/05/2026
Objection resolved — Addressed
01/05/2026
Objection resolved — Addressed
01/05/2026
Objection resolved — Addressed
12/17/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/04/2025
Objection raised — Admin
12/04/2025
Objection raised — Mechanical
12/04/2025
Objection raised — Inspections
12/04/2025
Objection raised — Structural
11/24/2025
Violation issued (HPD, open)
I
11/19/2025
Filed — Alteration
Install new HVAC.
B01319695-I1
11/15/2025
Special inspection requirement — Mechanical Systems
LAWRENCE GREEN
11/15/2025
Special inspection requirement — Final
P McClure Clapp
08/28/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/29/2025
Permit issued — Plumbing
B01253530-I1-PL
07/24/2025
Permit issued — General Construction
B01253472-I1-GC
07/10/2025
Filed — Alteration
Add new powder room at 1st floor and renovate exist bathroom and add new bathroom at 2nd floor. Replace existing rear wood deck with a metal deck at 1st floor. Replace all existing windows and door at rear of the building. New skylight at roof level.
B01253472-I1
07/10/2025
Filed — Alteration
Replace PL fixtures at Basement. New powder room PL fixtures at 1st floor. Replace exist. bathroom PL fixtures and add new bathroom PL fixtures at 2nd floor. All work in conjunction with GC_B01253472.
B01253530-I1
07/10/2025
Special inspection requirement — Concrete - Cast-In-Place
Khaled Mohamed
07/09/2025
Special inspection requirement — Final
P McClure Clapp
12/22/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/22/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/25/2008
Violation issued (DOB, closed)
VW*-VIOLATION - WORK W/O PERMIT DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offCR SAFETY GROUP02/13/2026
DOB NOWPlumbingSigned-offJ&M PLUMBING OF WESTCHEST07/29/2025
DOB NOWGeneral ConstructionSigned-offCR SAFETY GROUP07/24/2025
BISOTISSUEDBROOKLYN SOLARWORKS LLC05/04/2017
BIS—ISSUEDSR DELCO C.S.M., INC11/05/2008
1 project · most recent 03/13/2026
General Wiring
FiledStatusContractorScope
03/13/2026Permit IssuedFALCO ELEC'L SERVICES INCGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
12/17/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/28/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
11/15/2025Mechanical SystemsLAWRENCE GREENspecial
11/15/2025FinalP McClure Clappprogress
07/10/2025Concrete - Cast-In-PlaceKhaled Mohamedspecial
07/09/2025FinalP McClure Clappprogress
▾Documents — 65 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/21/2026B01253530-I1Request digital key ↗
08/21/2026B01253472-I1Request digital key ↗
08/19/2026B01319695-I1Request digital key ↗
▸Applications & Permits12
▸BISPLAN / WORK APPROVAL APPLICATION5
11/19/2024310143396Open ↗
08/21/2024310143396Open ↗
08/07/2024310143396Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLPC Approval/Permit3
08/13/2026B01253530-I1Open ↗
08/13/2026B01253472-I1Open ↗
08/13/2026B01319695-I1Open ↗
▸BISWORK PERMIT APPLICATION2
11/05/2008310143396Open ↗
11/05/2008310143396Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
09/25/2024310143396Open ↗
06/26/2009310143396Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
11/15/2024310143396Open ↗
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/21/2026B01253472-I1Open ↗
08/13/2026B01319695-I1Open ↗
08/13/2026B01253530-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/23/2026B01319695-I1Open ↗
08/30/2026B01253472-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/23/2026B01319695-I1Open ↗
08/30/2026B01253472-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
04/25/2017340489108Open ↗
▸Trade Schedules & Equipment4
▸BISSCHEDULE B - PLUMBING1
05/15/2008310143396Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
10/17/2024310143396Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
10/17/2024310143396Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
04/28/2009310143396Open ↗
▸Safety & Tenant Protection3
▸BISST-1: Street Tree Checklist2
10/29/2008310143396Open ↗
08/27/2024310143396Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES1
04/25/2017340489108Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/21/2026B01253472-I1Open ↗
08/13/2026B01253530-I1Open ↗
08/13/2026B01319695-I1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
06/26/2008310143396Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
04/25/2017340489108Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
03/22/2018340489108Open ↗
04/25/2017340489108Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
03/22/2018340489108Open ↗
▸BISSOLAR TAX ABATEMENT APPLICATION1
03/22/2018340489108Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
04/25/2017340489108Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
03/22/2018340489108Open ↗
04/25/2017340489108Open ↗
▸Approvals, Objections & Sign-offs9
▸BISLANDMARKS SIGNOFF2
08/27/2024310143396Open ↗
03/22/2018340489108Open ↗
▸BISLANDMARKS APPROVAL2
04/25/2017340489108Open ↗
06/25/2008310143396Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE2
08/21/2024310143396Open ↗
05/15/2008310143396Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
03/22/2018340489108Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
05/15/2008310143396Open ↗
▸BISUtility Company PV System Interconnection Acknowledgement Letter1
03/22/2018340489108Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT2
03/22/2018340489108Open ↗
04/25/2017340489108Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
10/23/2024310143396Open ↗
▸BISCIVIL PENALTY AFFADAVIT/REQUEST1
05/04/2017340489108Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION1
08/27/2024310143396Open ↗
▸BISEFILING COVER SHEET1
05/15/2008310143396Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
04/25/2017340489108Open ↗
▸Other Documents6
▸DOB NOWProof of Historic Building3
08/13/2026B01253530-I1Open ↗
08/13/2026B01253472-I1Open ↗
08/13/2026B01319695-I1Open ↗
▸BISPlot Diagram2
06/11/2008310143396Open ↗
08/20/2024310143396Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
08/27/2024310143396Open ↗