← Back
Walk-up apt, over six families with stores
258 WEST 15 STREET
MANHATTAN · Chelsea-Hudson Yards · BIN 1013751
💬 Discuss this project
1901Year Built
6Stories
C7Building Class
R8BZoning
11,730 sfGross Floor Area
23Units
Rent Stabilized11 Open Violations 10 unresolved · 1 paperwork only ▸
Walk-up apt, over six families with stores · Owner of record: ROSAR REALTY CORP C/O · 2,581 sf lot · 4.54 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingLandscape
Floor 64p · 1 filing · 8 docs
Floor 54p · 1 filing · 8 docs
Floor 47p · 3 filings · 20 docs
Floor 35p · 2 filings · 11 docs
Floor 24p · 1 filing · 8 docs
Floor 14p · 1 filing · 8 docs
Cellar2p · 2 filings · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SANZ PROPERTY MANAGEMENT2407/08/2026
ROSAR REALTY3703/22/2026
ROSAR REALTY CORP C10103/22/2026
ROSER REALTY103/22/2026
THE OWNER OF103/22/2026
GADFLY LOUNGE LLC103/22/2026
56 MAC D403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NICHOLAS C PAPPAS ARCHITECT PC1009/19/2024
ROJAS ENGINEERING, PLLC112/02/2022
BAZINI ENGINEERING, P.C.312/07/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
R CONSULTING903/21/2026
A E C CONSULTING EXPEDITING203/21/2026
TBC & ASSOC.203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JACK RABBIT NETWORKS INCGeneral Contractor707/08/2026
MASTER FIRE MECH CORPGeneral Contractor303/21/2026
DEDE K CONTRACTING GRP LLGeneral Contractor203/21/2026
R&L CONCRETE INCGeneral Contractor107/08/2026
CAM ENERGY HTG&MECH CORPPlumbing107/08/2026
ABE HIMELFARBElectrical103/21/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
ELPO ELECTRICAL CONTG INCElectrical103/22/2026
VICTOR LONDONOElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NICHOLAS C PAPPAS ARCHITE5552403/09/2023
NS ENGINEERING & CONSULTI3652112/02/2022
SY ENGINEERING PLLC5149112/02/2022
BAZINI ENGINEERING, P.C.1808212/07/2020
Building Lifecycle
All (85)Filed (14)Permit Issued (9)Signed Off (4)Violation (30)Inspection (3)Special Inspection (25)
09/26/2024
Special inspection requirement — Energy Code Compliance Inspections
Nicholas Pappas
09/23/2024
Signed off — Alteration
We respectfully wish to combine Apartments 3FE and 3FW into one Apartment on the third floor. We are creating new janitor's closet . New Partition Work, New Flooring as per plans .
M00837768-I1
09/19/2024
Filed — Alteration
We respectfully wish to combine apartments 3fe and 3fw into one apartment on the third floor. Create janitor's closet
M00837805-P2
09/16/2024
Special inspection requirement — Energy Code Compliance Inspections
Nicholas Pappas
08/30/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/25/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/11/2024
Filed — Alteration
We respectfully wish to combine apartments 3fe and 3fw into one apartment on the third floor. Create janitor's closet
M00837805-P1
07/03/2024
Special inspection requirement — Energy Code Compliance Inspections
Nicholas Pappas
07/01/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/28/2024
Permit issued — Plumbing
M00837805-I1-PL
06/28/2024
Special inspection requirement — Energy Code Compliance Inspections
Nicholas Pappas
06/28/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Nicholas Pappas
06/20/2024
Filed — Alteration
M00512988-P2
06/14/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Nicholas Pappas
06/14/2024
Special inspection requirement — Lighting in dwelling units
Nicholas Pappas
06/14/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicholas Pappas
06/14/2024
Special inspection requirement — Final
Nicholas Pappas
04/19/2024
Permit issued — General Construction
M00837768-I1-GC
05/10/2023
Permit issued — General Construction
M00837768-I1-GC
04/28/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Nicholas Pappas
04/28/2023
Special inspection requirement — Energy Code Compliance Inspections
Nicholas Pappas
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/23/2023
Permit issued — General Construction
M00837768-I1-GC
03/09/2023
Filed — Alteration
We respectfully wish to combine Apartments 3FE and 3FW into one Apartment on the third floor. We are creating new janitor's closet . New Partition Work, New Flooring as per plans .
M00837768-I1
03/09/2023
Filed — Alteration
We respectfully wish to combine apartments 3fe and 3fw into one apartment on the third floor. Create janitor's closet
M00837805-I1
01/13/2023
Permit issued — Mechanical Systems
M08040953-I1-MS
12/02/2022
Filed — Alteration
M08040953-I1
11/22/2022
Special inspection requirement — Tenant Protection Plan Compliance
SUNGBOM YI
11/16/2022
Special inspection requirement — Energy Code Compliance Inspections
DAVIDSON CHRISTMAS
11/16/2022
Special inspection requirement — Final
DAVIDSON CHRISTMAS
11/16/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARI MOTWANI
11/16/2022
Special inspection requirement — Mechanical Systems
NARI MOTWANI
10/05/2022
Signed off — Alteration
This application is being filed for General Construction work for removal of interior non-load bearing partition on the 1st floor at the subject premises. There is no change in use, egress or occupancy.
M00701432-I1
08/29/2022
Permit issued — General Construction
M00701432-I1-GC
08/05/2022
Filed — Alteration
This application is being filed for General Construction work for removal of interior non-load bearing partition on the 1st floor at the subject premises. There is no change in use, egress or occupancy.
M00701432-I1
05/23/2022
Signed off — Alteration
INSTALL NEW GAS PIPING AND GAS METER FOR REPLACEMENT GAS/OIL BURNER ON EXISTING LOW PRESSURE BOILER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00304154-I1
05/11/2022
Violation issued (ECB, closed)
Construction
04/28/2022
Signed off — Alteration
REPLACE OIL BURNER WITH GAS/OIL BURNER ON EXISTING LOW PRESSURE BOILER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00304139-I1
04/07/2022
Filed — Alteration
M00512944-P1
04/07/2022
Filed — Alteration
M00512988-P1
04/01/2022
Special inspection requirement — Lighting in dwelling units
Nicholas Pappas
04/01/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicholas Pappas
04/01/2022
Special inspection requirement — Final
Nicholas Pappas
04/01/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Nicholas Pappas
03/23/2022
Special inspection requirement — Final
Nicholas Pappas
03/18/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicholas Pappas
10/06/2021
Permit issued — General Construction
M00512944-I1-GC
09/09/2021
Filed — Alteration
M00512944-I1
08/30/2021
Filed — Alteration
M00512988-I1
06/30/2021
Violation issued (ECB, closed)
Construction
02/22/2021
Permit issued — Plumbing
M91588941-I1-PL
12/07/2020
Filed — Alteration
INSTALL NEW GAS PIPING AND GAS METER FOR REPLACEMENT GAS/OIL BURNER ON EXISTING LOW PRESSURE BOILER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00304154-P1
12/07/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Bazini
11/06/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Bazini
09/18/2020
Filed — Alteration
INSTALL NEW GAS PIPING AND GAS METER FOR REPLACEMENT GAS/OIL BURNER ON EXISTING LOW PRESSURE BOILER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00304154-I1
09/18/2020
Filed — Alteration
REPLACE OIL BURNER WITH GAS/OIL BURNER ON EXISTING LOW PRESSURE BOILER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00304139-I1
09/18/2020
Permit issued — Boiler Equipment
M00304139-I1-BE
01/27/2020
Special inspection requirement — HVAC and service water heating equipment
Joseph Bazini
01/25/2017
Violation issued (HPD, closed)
C
04/13/2016
Violation issued (HPD, open)
B
Latest 60 of 85 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR06/28/2024
DOB NOWGeneral ConstructionSigned-offDEDE K CONTRACTING GRP LL04/19/2024
DOB NOWGeneral ConstructionSigned-offJACK RABBIT NETWORKS INC05/10/2023
DOB NOWGeneral ConstructionSigned-offJACK RABBIT NETWORKS INC03/23/2023
DOB NOWMechanical SystemsPermit IssuedMASTER FIRE MECH CORP01/13/2023
DOB NOWGeneral ConstructionSigned-offJACK RABBIT NETWORKS INC08/29/2022
DOB NOWGeneral ConstructionSigned-offR&L CONCRETE INC10/06/2021
DOB NOWPlumbingSigned-offCAM ENERGY HTG&MECH CORP02/22/2021
DOB NOWBoiler EquipmentSigned-offCAM ENERGY HTG AND MECH09/18/2020
BISOTISSUEDJACK RABBIT NETWORKS INC04/18/2018
BISPLISSUEDPRECISION PLBG SVCS., INC12/22/2016
BISFPISSUEDUNIQUE FIRE SYSTEMS INC08/08/2014
BISPLISSUEDALLIED PLBG & HTG CORP02/23/2012
BISOTISSUEDGEMROSON REALTY CORP02/15/2012
BISPLISSUEDALLIED PLBG & HTG CORP01/24/2012
BISOTISSUEDGEMROSON REALTY CORP06/02/2011
BISOTISSUEDGEMROSON REALTY CORP05/20/2011
BISPLISSUEDALLIED PLBG & HTG CORP02/16/2011
BISOTISSUED56 MAC D INC01/19/2011
BISOTISSUEDGEMROSON REALTY CORP02/02/2010
BISFPISSUEDIDEAL FIRE SAFETY SYS. IN09/08/2009
BISPLISSUEDDEMAR PLUMBING CORP04/12/2006
BISFPISSUEDIDEAL FIRE SYSTEMS INC02/06/2006
BISOTISSUEDGEMROSON REALTY01/10/2006
BISMHISSUEDFLACO CONSTR. CORP05/23/2005
BISOTISSUEDFLACO CONSTR. CORP.05/23/2005
BISEQISSUEDHI TECH BRIDG.04/08/2004
BISPLISSUEDARIANA CONTRACTING INC11/20/2003
BISPLISSUEDARIANA CONTRACTING INC11/20/2003
BISMHISSUEDROSAR REALTY10/30/2003
BISOTISSUEDROSAR REALTY10/23/2003
BISOTISSUEDROSAR REALTY05/20/2003
BISPLISSUEDARIANA CONTRACTING INC08/02/2002
BISPLISSUEDAVON PLBG & HTG INC03/20/2001
BISFBISSUEDSTEPHEN BRAUN02/07/2001
BISOTISSUEDROSAR REALTY CORP12/05/2000
BISPLISSUEDMAGOR PL AND HTGHTG INC04/26/2000
BISOTISSUEDROSAR REALTY01/19/2000
BISPLISSUEDTHEODORE WAGNER PLMB & HTNG02/23/1999
BISFPISSUEDIDEAL FIRE CONTROL INC12/23/1998
+ 9 more permits on file
1 project · most recent 09/19/2024
Gas Water/Sanitary
FiledStatusContractorScope
09/19/2024Signed-offINFINITI ESC PLUMBING CORGas, Water/Sanitary
3 projects · most recent 06/25/2024
General Wiring
FiledStatusContractorScope
06/25/2024CompleteEMPIRE LIC ELECL CONTRSGeneral Wiring
06/10/2022CompleteRAINBOW ELECTRIC CO., INCGeneral Wiring
05/12/2021Permit IssuedELPO ELECTRICAL CONTG INCGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
08/30/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/25/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/01/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
09/26/2024Energy Code Compliance InspectionsNicholas Pappasprogress
09/16/2024Energy Code Compliance InspectionsNicholas Pappasprogress
07/03/2024Energy Code Compliance InspectionsNicholas Pappasprogress
06/28/2024Energy Code Compliance InspectionsNicholas Pappasprogress
06/28/2024HVAC-R and service water piping design and insulationNicholas Pappasenergy_progress
06/14/2024HVAC-R and service water piping design and insulationNicholas Pappasenergy_progress
06/14/2024Lighting in dwelling unitsNicholas Pappasenergy_progress
06/14/2024Fire-Resistant Penetrations and JointsNicholas Pappasspecial
06/14/2024FinalNicholas Pappasprogress
04/28/2023HVAC-R and service water piping design and insulationNicholas Pappasenergy_progress
04/28/2023Energy Code Compliance InspectionsNicholas Pappasprogress
11/22/2022Tenant Protection Plan ComplianceSUNGBOM YIspecial
11/16/2022Energy Code Compliance InspectionsDAVIDSON CHRISTMASprogress
11/16/2022FinalDAVIDSON CHRISTMASprogress
11/16/2022Fire-Resistant Penetrations and JointsNARI MOTWANIspecial
11/16/2022Mechanical SystemsNARI MOTWANIspecial
04/01/2022Lighting in dwelling unitsNicholas Pappasenergy_progress
04/01/2022Fire-Resistant Penetrations and JointsNicholas Pappasspecial
04/01/2022FinalNicholas Pappasprogress
04/01/2022HVAC-R and service water piping design and insulationNicholas Pappasenergy_progress
03/23/2022FinalNicholas Pappasprogress
03/18/2022Fire-Resistant Penetrations and JointsNicholas Pappasspecial
12/07/2020Fire-Resistant Penetrations and JointsJoseph Bazinispecial
11/06/2020Fire-Resistant Penetrations and JointsJoseph Bazinispecial
01/27/2020HVAC and service water heating equipment Joseph Bazinienergy_progress
▾Documents — 140 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch11
09/03/2026M00512944-I1Request digital key ↗
09/03/2026M00512944-P1Request digital key ↗
09/02/2026M00512988-P2Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/04/2026M00304154-P1Request digital key ↗
09/04/2026M00304154-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment1
09/04/2026M00304139-I1Request digital key ↗
▸Applications & Permits23
▸BISWORK PERMIT APPLICATION13
04/19/2018123360674Open ↗
12/27/2016122958512Open ↗
08/22/2014122087375Open ↗
Showing 3 of 13 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION10
01/21/2022104098735Open ↗
02/14/2018123360674Open ↗
12/29/2016122958512Open ↗
Showing 3 of 10 on file for this type
▸Seals & Professional Certifications52
▸DOB NOWProgress Inspector Seal & Signature17
09/23/2026M00304139-I1Open ↗
08/30/2026M00512944-I1Open ↗
08/30/2026M00512944-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
09/04/2026M00304154-P1Open ↗
09/04/2026M00304154-I1Open ↗
09/03/2026M00512944-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
08/30/2026M00512944-I1Open ↗
08/28/2026M00512944-P1Open ↗
08/26/2026M08040953-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
02/14/2018123360674Open ↗
12/29/2016122958512Open ↗
12/29/2016122958512Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
02/14/2018123360674Open ↗
12/29/2016122958512Open ↗
08/04/2014122087375Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
02/14/2018123360674Open ↗
12/29/2016122958512Open ↗
08/04/2014122087375Open ↗
▸Trade Schedules & Equipment7
▸BISSCHEDULE B - PLUMBING3
11/25/2011120906813Open ↗
11/15/2010120529302Open ↗
09/22/2009120158943Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
02/14/2018123360674Open ↗
12/29/2016122958512Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
07/31/2012120906813Open ↗
06/21/2011120529302Open ↗
▸Safety & Tenant Protection6
▸DOB NOWTenant Protection Plan3
09/04/2026M00304154-I1Open ↗
09/04/2026M00304154-P1Open ↗
08/13/2026M00304139-I1Open ↗
▸BISTenant Protection Plan and Notes2
02/14/2018123360674Open ↗
12/27/2016122958512Open ↗
▸BISST-1 Street Tree Checklist1
11/25/2011120906813Open ↗
▸Environmental & Asbestos19
▸DOB NOWDEP ACP-5: Asbestos Assessment Report14
09/04/2026M00304154-P1Open ↗
09/04/2026M00304154-I1Open ↗
09/03/2026M00512944-P1Open ↗
Showing 3 of 14 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
09/22/2009120158943Open ↗
08/15/2009120128290Open ↗
11/25/2011120906813Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
02/14/2018123360674Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
02/14/2018123360674Open ↗
12/29/2016122958512Open ↗
12/29/2016122958512Open ↗
▸BISTR8: Energy Code Progress Inspections2
12/14/2011120906813Open ↗
11/25/2011120906813Open ↗
▸Approvals, Objections & Sign-offs2
▸BISADMINISTRATIVE OBJECTIONS2
09/22/2009120158943Open ↗
08/15/2009120128290Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT7
02/14/2018123360674Open ↗
12/29/2016122958512Open ↗
08/04/2014122087375Open ↗
Showing 3 of 7 on file for this type
▸Filing & Intake Forms5
▸BISEFILING COVER SHEET5
02/14/2018123360674Open ↗
12/29/2016122958512Open ↗
08/04/2014122087375Open ↗
Showing 3 of 5 on file for this type