← Back
Two family frame
258 WOODBINE STREET
BROOKLYN · Bushwick (East) · BIN 3076800
💬 Discuss this project
1920Year Built
3Stories
B2Building Class
R6Zoning
2,541 sfGross Floor Area
2Units
Two family frame · 1,883 sf lot · 1.35 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 211p · 2 filings · 20 docs
Floor 111p · 2 filings · 20 docs
Cellar10p · 2 filings · 20 docs
Sub-Basement10p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PARK SLOPE ASSOCIATES103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/16/2021$1.8M—PSA BROOKLYN LLC → Private party$724/sf building
01/21/2021$800K—— → —$315/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
L & C ASSOCIATES610/08/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
L&C ASSOCIATES603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EAST ENDERS NYC INCGeneral Contractor603/21/2026
ROYAL ELEC'L CONTR'G CORPElectrical103/22/2026
SUPERIOR PLUMBING & HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL ENGINEERING P.C.6781610/08/2021
Building Lifecycle
All (34)Filed (6)Permit Issued (3)Signed Off (2)Special Inspection (23)
10/22/2021
Signed off — Alteration
INTERIOR RENOVATION WITH PARTITIONS. AS PER PLANS. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00472594-I1
10/22/2021
Signed off — Alteration
EXISTING TWO STORY. CELLAR TO 2ND FLOOR BUILDING. PLUMBING WORK. AS PER PLANS. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00472867-I1
10/08/2021
Filed — Alteration
INTERIOR RENOVATION WITH PARTITIONS. AS PER PLANS. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00472594-P2
10/08/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
RONNY LAM
10/08/2021
Special inspection requirement — Air barrier - visual inspection
RONNY LAM
10/08/2021
Special inspection requirement — Fenestration air leakage
RONNY LAM
10/08/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
10/08/2021
Special inspection requirement — Energy Code Compliance Inspections
RONNY LAM
10/08/2021
Special inspection requirement — Air barrier — testing
RONNY LAM
10/08/2021
Special inspection requirement — Fenestration areas
RONNY LAM
10/08/2021
Special inspection requirement — Interior lighting power
RONNY LAM
10/08/2021
Special inspection requirement — Insulation placement and R values
RONNY LAM
10/08/2021
Special inspection requirement — Fenestration air leakage
RONNY LAM
10/08/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
RONNY LAM
10/08/2021
Special inspection requirement — Fenestration areas
RONNY LAM
10/08/2021
Special inspection requirement — Air barrier — testing
RONNY LAM
10/08/2021
Special inspection requirement — Air barrier - visual inspection
RONNY LAM
10/08/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
10/08/2021
Special inspection requirement — Energy Code Compliance Inspections
RONNY LAM
10/08/2021
Special inspection requirement — Interior lighting power
RONNY LAM
10/08/2021
Special inspection requirement — Insulation placement and R values
RONNY LAM
10/05/2021
Filed — Alteration
EXISTING TWO STORY. CELLAR TO 2ND FLOOR BUILDING. PLUMBING WORK. AS PER PLANS. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00472867-P2
10/05/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
10/05/2021
Special inspection requirement — Energy Code Compliance Inspections
RONNY LAM
10/05/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
RONNY LAM
10/05/2021
Special inspection requirement — HVAC-R and service water heating equipment
RONNY LAM
10/05/2021
Special inspection requirement — HVAC-R and service water heating system controls
RONNY LAM
10/04/2021
Permit issued — General Construction
B00472594-I1-GC
07/27/2021
Filed — Alteration
EXISTING TWO STORY. CELLAR TO 2ND FLOOR BUILDING. PLUMBING WORK. AS PER PLANS. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00472867-P1
07/27/2021
Filed — Alteration
INTERIOR RENOVATION WITH PARTITIONS. AS PER PLANS. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00472594-P1
04/30/2021
Permit issued — Plumbing
B00472867-I1-PL
04/30/2021
Permit issued — General Construction
B00472594-I1-GC
04/26/2021
Filed — Alteration
INTERIOR RENOVATION WITH PARTITIONS. AS PER PLANS. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00472594-I1
04/26/2021
Filed — Alteration
EXISTING TWO STORY. CELLAR TO 2ND FLOOR BUILDING. PLUMBING WORK. AS PER PLANS. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00472867-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offEAST ENDERS NYC INC10/04/2021
DOB NOWPlumbingSigned-offSUPERIOR PLUMBING & HEATI04/30/2021
DOB NOWGeneral ConstructionSigned-offEAST ENDERS NYC INC04/30/2021
1 project · most recent 03/08/2021
General Wiring
FiledStatusContractorScope
03/08/2021CompleteROYAL ELEC'L CONTR'G CORPGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
10/08/2021Fenestration and door U-factor and product ratingsRONNY LAMenergy_progress
10/08/2021Air barrier - visual inspectionRONNY LAMenergy_progress
10/08/2021Fenestration air leakageRONNY LAMenergy_progress
10/08/2021Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
10/08/2021Energy Code Compliance InspectionsRONNY LAMprogress
10/08/2021Air barrier — testing RONNY LAMenergy_progress
10/08/2021Fenestration areasRONNY LAMenergy_progress
10/08/2021Interior lighting powerRONNY LAMenergy_progress
10/08/2021Insulation placement and R valuesRONNY LAMenergy_progress
10/08/2021Fenestration air leakageRONNY LAMenergy_progress
10/08/2021Fenestration and door U-factor and product ratingsRONNY LAMenergy_progress
10/08/2021Fenestration areasRONNY LAMenergy_progress
10/08/2021Air barrier — testing RONNY LAMenergy_progress
10/08/2021Air barrier - visual inspectionRONNY LAMenergy_progress
10/08/2021Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
10/08/2021Energy Code Compliance InspectionsRONNY LAMprogress
10/08/2021Interior lighting powerRONNY LAMenergy_progress
10/08/2021Insulation placement and R valuesRONNY LAMenergy_progress
10/05/2021Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
10/05/2021Energy Code Compliance InspectionsRONNY LAMprogress
10/05/2021HVAC-R and service water piping design and insulationRONNY LAMenergy_progress
10/05/2021HVAC-R and service water heating equipmentRONNY LAMenergy_progress
10/05/2021HVAC-R and service water heating system controlsRONNY LAMenergy_progress
▾Documents — 43 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch - Plumbing3
09/01/2026B00472867-I1Request digital key ↗
09/01/2026B00472867-P1Request digital key ↗
08/15/2026B00472867-P2Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction3
09/01/2026B00472594-P1Request digital key ↗
09/01/2026B00472594-I1Request digital key ↗
09/01/2026B00472594-P2Request digital key ↗
▸Seals & Professional Certifications29
▸DOB NOWProgress Inspector Seal & Signature20
09/01/2026B00472594-P2Open ↗
09/01/2026B00472594-P2Open ↗
09/01/2026B00472594-P2Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/13/2026B00472867-P1Open ↗
08/13/2026B00472867-I1Open ↗
08/13/2026B00472594-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026B00472594-P2Open ↗
08/28/2026B00472594-I1Open ↗
08/26/2026B00472867-P2Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/13/2026B00472867-P1Open ↗
08/13/2026B00472867-I1Open ↗
08/13/2026B00472594-P2Open ↗
Showing 3 of 6 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00472594-I1Open ↗
08/13/2026B00472867-I1Open ↗