← Back
Public elementary, junior or senior high
P.S. 189
2580 AMSTERDAM AVENUE · BIN 1076750
💬 Discuss this project
1922Year Built
5Stories
W1Building Class
R7-2Zoning
131,863 sfGross Floor Area
3Units
LL97 Covered18 Open Violations 0 unresolved · 18 paperwork only ▸
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 54,000 sf lot · 2.44 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
Floor 51p · 1 filing · 15 docs
Floor 41p · 1 filing · 15 docs
Floor 31p · 1 filing · 15 docs
Floor 21p · 1 filing · 15 docs
Floor 11p · 1 filing · 15 docs
CellarUnder Construction8p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYCSCA4609/01/2026
NYC DEPARTMENT OF EDUCATION103/22/2026
DEPARTMENT OF EDUCATION603/22/2026
DEPARTMENT OF EDUCATION 0303/22/2026
D.O.E. P.S.189 0703/22/2026
DOE PS 189 040603/22/2026
DOE 040103/22/2026
DEPT OF EDUCATION P.S. 18203/22/2026
051619CDOEMD01103/22/2026
P.S. 189 D.O.E.1803/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STANTEC206/02/2026
NYC SCHOOL CONSTRUCTION AUTHORITY101/29/2026
NYC SCA101/29/2026
NYCSCA101/29/2026
STANTEC ARCHITECTURE INC.210/29/2025
GERI GOLDMAN ENGINEERING302/05/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC SCHOOL CONSTRUCTION AUTHORITY303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
VARSITY PLBG AND HTG INCPlumbing507/08/2026
RIZVI BUILDERSGeneral Contractor307/08/2026
LASER ELEC'L CONTR'G INCElectrical103/22/2026
LOUIS CORREAElectrical103/21/2026
HAL OZKURTElectrical103/21/2026
STANCO SYSTEM ELEC'L CONTElectrical103/22/2026
ON GUK TSEElectrical103/21/2026
JOSHUA ANDERSONElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
20/20 INSPECTIONS INC1471510/29/2025
Building Lifecycle
All (112)Filed (10)Permit Issued (8)Violation (60)Objection (7)Special Inspection (27)
08/11/2026
Objection resolved — Resolved
06/05/2026
Objection raised — Other
06/02/2026
Filed — Alteration
Remove existing vct floor in playrooms #110 & #111, provide new resilient athletic flooring assembly. Provide ADA transitions, provide ADA, bi-level drinking fountain, standard drinking fountain, and water filler. Remove and replace 4 existing basketball
M00614448-S3
06/02/2026
Special inspection requirement — Structural Steel - Details
06/02/2026
Special inspection requirement — Structural Steel - High Strength Bolting
05/28/2026
Special inspection requirement — Final
03/26/2026
Objection resolved — Addressed
03/25/2026
Special inspection requirement — HVAC-R and service water heating system controls
03/25/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
03/25/2026
Special inspection requirement — Post-installed Anchors
03/25/2026
Special inspection requirement — HVAC-R and service water heating equipment
03/25/2026
Special inspection requirement — Duct leakage testing, insulation and design
03/25/2026
Special inspection requirement — Electrical motors and elevators
03/25/2026
Special inspection requirement — Maintenance information
03/23/2026
Objection resolved — Addressed
03/23/2026
Special inspection requirement — Fenestration air leakage
03/10/2026
Violation issued (ECB, open)
Construction
03/10/2026
Violation issued (ECB, open)
Construction
03/04/2026
Special inspection requirement — Energy Code Compliance Inspections
02/19/2026
Special inspection requirement — Masonry
02/19/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
02/19/2026
Special inspection requirement — Concrete - Cast-In-Place
02/06/2026
Objection raised — Other
02/06/2026
Objection raised — Other
01/29/2026
Filed — Alteration
Removal and reinstallation of radiators; replace pneumatic control valves and steam traps, install one (1) new duplex air compressor and motorized damper for blowers.
M01323856-I1
01/29/2026
Filed — Alteration
Removal and reinstallation of radiators; replace pneumatic control valves and steam traps, install one (1) new duplex air compressor and motorized damper for blowers.
M01323856-S2
01/29/2026
Filed — Alteration
Removal and reinstallation of radiators; replace pneumatic control valves and steam traps, install one (1) new duplex air compressor and motorized damper for blowers.
M01323856-S1
01/29/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
01/29/2026
Special inspection requirement — Post-installed Anchors
01/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
01/29/2026
Special inspection requirement — Shutoff dampers
01/29/2026
Special inspection requirement — Air barrier - visual inspection
01/09/2026
Permit issued — Plumbing
M00614448-S1-PL
11/24/2025
Special inspection requirement — Final
11/24/2025
Special inspection requirement — Final
11/24/2025
Special inspection requirement — Mechanical Systems
11/07/2025
Objection raised — Admin
10/29/2025
Filed — Alteration
Remove existing vct floor in playrooms #110 & #111, provide new resilient athletic flooring assembly. Provide ADA transitions, provide ADA, bi-level drinking fountain, standard drinking fountain, and water filler. Remove and replace 4 existing basketball
M00614448-P4
10/16/2025
Permit issued — General Construction
M00614448-I1-GC
03/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACOB HAAS
02/19/2025
Violation issued (ECB, open)
Construction
02/05/2025
Filed — Alteration
Remove existing vct floor in playrooms #110 & #111, provide new resilient athletic flooring assembly. Provide ADA transitions, provide ADA, bi-level drinking fountain, standard drinking fountain, and water filler. Remove and replace 4 existing basketball
M00614448-P3
02/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACOB HAAS
01/10/2025
Permit issued — Plumbing
M00614448-S1-PL
03/26/2024
Violation issued (ECB, open)
Construction
03/26/2024
Violation issued (ECB, closed)
Construction
01/04/2024
Permit issued — Plumbing
M00614448-S1-PL
07/07/2023
Violation issued (ECB, closed)
Construction
07/07/2023
Violation issued (ECB, open)
Construction
07/07/2023
Violation issued (ECB, open)
Construction
05/01/2023
Permit issued — General Construction
M00614448-I1-GC
01/05/2023
Permit issued — Plumbing
M00614448-S1-PL
01/04/2023
Permit issued — Plumbing
M00614448-S1-PL
12/20/2022
Filed — Alteration
Remove existing vct floor in playrooms #110 & #111, provide new resilient athletic flooring assembly. Provide ADA transitions, provide ADA, bi-level drinking fountain, standard drinking fountain, and water filler. Remove and replace 4 existing basketball
M00614448-P2
12/20/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACOB HAAS
11/23/2022
Permit issued — General Construction
M00614448-I1-GC
11/07/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACOB HAAS
11/04/2022
Filed — Alteration
Remove existing vct floor in playrooms #110 & #111, provide new resilient athletic flooring assembly. Provide ADA transitions, provide ADA, bi-level drinking fountain, standard drinking fountain, and water filler. Remove and replace 4 existing basketball
M00614448-P1
06/09/2022
Violation issued (ECB, closed)
Construction
06/09/2022
Violation issued (ECB, open)
Construction
Latest 60 of 112 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedVARSITY PLBG AND HTG INC01/09/2026
DOB NOWGeneral ConstructionPermit IssuedRIZVI BUILDERS10/16/2025
DOB NOWPlumbingPermit IssuedVARSITY PLBG AND HTG INC01/10/2025
DOB NOWPlumbingPermit IssuedVARSITY PLBG AND HTG INC01/04/2024
DOB NOWGeneral ConstructionPermit IssuedRIZVI BUILDERS05/01/2023
DOB NOWPlumbingPermit IssuedVARSITY PLBG AND HTG INC01/05/2023
DOB NOWPlumbingPermit IssuedVARSITY PLBG AND HTG INC01/04/2023
DOB NOWGeneral ConstructionPermit IssuedRIZVI BUILDERS11/23/2022
BISPLISSUEDVARSITY PLBG AND HTG INC01/20/2026
BISOTISSUEDKEL-TECH CONSTRUCTION INC12/02/2025
BISOTISSUEDKEL-TECH CONSTRUCTION INC12/02/2025
BISMHISSUEDTAMEER INC11/04/2025
BISPLISSUEDVARSITY PLBG AND HTG INC01/22/2025
BISMHISSUEDTAMEER INC08/12/2024
BISEQISSUEDRICI CORP02/07/2024
BISOTISSUEDRICI CORP02/06/2024
BISEQISSUEDRICI CORP02/06/2024
BISEQISSUEDRICI CORP02/06/2024
BISOTISSUEDRICI CORP02/06/2024
BISPLISSUEDVARSITY PLBG AND HTG INC01/26/2024
BISMHISSUEDTAMEER INC06/07/2023
BISEQISSUEDRICI CORP02/13/2023
BISOTISSUEDRICI CORP02/13/2023
BISEQISSUEDRICI CORP02/13/2023
BISEQISSUEDRICI CORP02/13/2023
BISOTISSUEDRICI CORP02/13/2023
BISPLISSUEDVARSITY PLBG AND HTG INC01/30/2023
BISMHISSUEDTAMEER INC07/22/2022
BISPLISSUEDVARSITY PLBG AND HTG INC02/02/2022
BISOTISSUEDRICI CORP01/28/2022
BISOTISSUEDRICI CORP01/28/2022
BISEQISSUEDRICI CORP01/27/2022
BISEQISSUEDRICI CORP01/27/2022
BISEQISSUEDRICI CORP01/27/2022
BISMHISSUEDTAMEER INC01/18/2022
BISEQISSUEDRICI CORP02/03/2021
BISPLISSUEDVARSITY PLBG AND HTG INC02/03/2021
BISOTISSUEDRICI CORP02/03/2021
BISEQISSUEDRICI CORP02/03/2021
BISEQISSUEDRICI CORP02/03/2021
+ 18 more permits on file
1 project · most recent 01/29/2026
Others
FiledStatusContractorScopeMake / Model / Capacity
01/29/2026——Others
Other
Hankison HPR35 25 CFM ×1
2 projects · most recent 06/02/2026
Water/Sanitary Storm
FiledStatusContractorScope
06/02/2026Permit IssuedVARSITY PLBG AND HTG INCWater/Sanitary
01/29/2026——Storm
11 projects · most recent 09/16/2025
General Wiring
FiledStatusContractorScope
09/16/2025Permit IssuedLOUIS CORREAGeneral Wiring
01/07/2025CompleteANCO ELECTL CONTCTNG INC—
12/10/2024CompleteANCO ELECTL CONTCTNG INC—
08/11/2023CompleteGEMINI ELECTRIC CO., INC.—
05/20/2022CompleteGEMINI ELECTRIC CO., INC.General Wiring
04/06/2021Permit IssuedSTANCO SYSTEM ELEC'L CONT—
02/27/2020Permit IssuedSTANCO SYSTEM ELEC'L CONT—
12/15/2019CompleteLASER ELEC'L CONTR'G INC—
10/09/2019Permit IssuedLASER ELEC'L CONTR'G INCGeneral Wiring
09/24/2018CompleteLASER ELEC'L CONSTR'G INC—
04/17/2018CompleteLASER ELEC'L CONSTR'G INCGeneral Wiring
2 projects · most recent 06/02/2026
Steel
FiledStatusContractorScope
06/02/2026Permit IssuedVARSITY PLBG AND HTG INCSteel
01/29/2026——1 scope_items
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
06/02/2026Structural Steel - Details—special
06/02/2026Structural Steel - High Strength Bolting—special
05/28/2026Final—progress
03/25/2026HVAC-R and service water heating system controls—energy_progress
03/25/2026HVAC-R and service water piping design and insulation—energy_progress
03/25/2026Post-installed Anchors—special
03/25/2026HVAC-R and service water heating equipment—energy_progress
03/25/2026Duct leakage testing, insulation and design—energy_progress
03/25/2026Electrical motors and elevators—energy_progress
03/25/2026Maintenance information—energy_progress
03/23/2026Fenestration air leakage—energy_progress
03/04/2026Energy Code Compliance Inspections—progress
02/19/2026Masonry—special
02/19/2026Structural Stability – Alterations of existing buildings—special
02/19/2026Concrete - Cast-In-Place—special
01/29/2026Fenestration and door U-factor and product ratings—energy_progress
01/29/2026Post-installed Anchors—special
01/29/2026Fire-Resistant Penetrations and Joints—special
01/29/2026Shutoff dampers—energy_progress
01/29/2026Air barrier - visual inspection—energy_progress
11/24/2025Final—progress
11/24/2025Final—progress
11/24/2025Mechanical Systems—special
03/10/2025Fire-Resistant Penetrations and JointsJACOB HAASspecial
02/05/2025Fire-Resistant Penetrations and JointsJACOB HAASspecial
Latest 25 of 27.
▾Documents — 70 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
09/01/2026M00614448-P4Request digital key ↗
09/01/2026M00614448-S3Request digital key ↗
08/19/2026M01323856-S1Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
03/29/2017122400384Open ↗
▸BISWORK PERMIT APPLICATION1
03/29/2017122400384Open ↗
▸Seals & Professional Certifications17
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/19/2026M01323856-I1Open ↗
08/19/2026M01323856-S2Open ↗
08/19/2026M01323856-S1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/28/2026M00614448-P2Open ↗
08/28/2026M00614448-P3Open ↗
08/26/2026M00614448-S1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
03/29/2017122400384Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
03/29/2017122400384Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
03/29/2017122400384Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
03/29/2017122400384Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
03/29/2017122400384Open ↗
▸Approvals, Objections & Sign-offs22
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)10
08/15/2026M00614448-S3Open ↗
08/13/2026M01323856-I1Open ↗
08/13/2026M00614448-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter10
08/15/2026M00614448-S3Open ↗
08/13/2026M00614448-P3Open ↗
08/13/2026M00614448-P2Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDEP Variance (V5) letter2
08/13/2026M00614448-I1Open ↗
08/13/2026M00614448-S1Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
03/29/2017122400384Open ↗
▸Filing & Intake Forms3
▸DOB NOWAI1 Form2
08/13/2026M00614448-P4Open ↗
08/13/2026M00614448-I1Open ↗
▸BISEFILING COVER SHEET1
03/29/2017122400384Open ↗
▸Other Documents11
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal11
08/17/2026M00614448-P4Open ↗
08/15/2026M00614448-S3Open ↗
08/13/2026M00614448-S1Open ↗
Showing 3 of 11 on file for this type