← Back
Over six families without stores
2584 CRESTON AVENUE
BRONX · BIN 2013825
💬 Discuss this project
1917Year Built
5Stories
C1Building Class
R8Zoning
24,955 sfGross Floor Area
27Units
Rent Stabilized62 Open Violations ▸
Over six families without stores · Owner of record: GC 192 LLC · 6,599 sf lot · 3.78 FAR built · Flood zone X
Locations of Work
Electrical
Roof1p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DENALI MANAGEMENT1007/08/2026
GC 192 LLC203/22/2026
MANDY ASSOCIATES403/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JAMES A CLANCY106/15/2025
LEDER-LUIS ARCHITECTURAL DESIGN, PL404/19/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
XPDITE GROUP LLC (104)403/21/2026
ARC DESIGN AND CONSULTING LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NATIONWIDE MECHANICAL INCPlumbing207/08/2026
DVM ELECTRICAL SERVICES LElectrical103/22/2026
THE SCI CONSTRUCTIONGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JAMES A CLANCY9176106/15/2025
LEDER-LUIS ARCHITECTURAL1553110/19/2021
Building Lifecycle
All (77)Filed (5)Permit Issued (3)Violation (60)Inspection (1)Objection (2)Special Inspection (6)
02/18/2026
Violation issued (HPD, closed)
A
02/04/2026
Violation issued (HPD, closed)
B
02/04/2026
Violation issued (HPD, closed)
C
02/04/2026
Violation issued (HPD, closed)
B
02/04/2026
Violation issued (HPD, closed)
C
11/15/2025
Violation issued (HPD, open)
A
11/15/2025
Violation issued (HPD, closed)
C
11/15/2025
Violation issued (HPD, open)
C
11/15/2025
Violation issued (HPD, closed)
B
11/05/2025
Violation issued (HPD, open)
C
11/05/2025
Violation issued (HPD, closed)
C
10/26/2025
Violation issued (HPD, open)
C
10/26/2025
Violation issued (HPD, closed)
B
10/26/2025
Violation issued (HPD, closed)
B
10/26/2025
Violation issued (HPD, closed)
B
10/26/2025
Violation issued (HPD, closed)
C
10/26/2025
Violation issued (HPD, closed)
C
10/26/2025
Violation issued (HPD, open)
C
10/26/2025
Violation issued (HPD, open)
B
06/30/2025
Permit issued — Solar
X01236243-I1-SL
06/20/2025
Violation issued (HPD, open)
B
06/20/2025
Violation issued (HPD, closed)
C
06/15/2025
Filed — Alteration
INSTALLATION OF PV SYSTEM ON EXISTING ROOF TOP. NO CHANGES TO THE USE EGRESS OR OCCUPANCY.
X01236243-I1
06/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Clancy
06/04/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
James Clancy
06/04/2025
Special inspection requirement — Energy Code Compliance Inspections
James Clancy
06/04/2025
Special inspection requirement — Final
James Clancy
06/04/2025
Special inspection requirement — Air barrier - visual inspection
James Clancy
05/12/2025
Violation issued (HPD, closed)
B
05/12/2025
Violation issued (HPD, closed)
C
05/12/2025
Violation issued (HPD, open)
C
05/12/2025
Violation issued (HPD, open)
B
05/12/2025
Violation issued (HPD, open)
C
05/12/2025
Violation issued (HPD, closed)
B
11/17/2024
Violation issued (HPD, closed)
B
10/17/2024
Violation issued (HPD, closed)
C
10/17/2024
Violation issued (HPD, closed)
C
10/17/2024
Violation issued (HPD, closed)
C
10/17/2024
Violation issued (HPD, open)
B
10/17/2024
Violation issued (HPD, closed)
B
10/17/2024
Violation issued (HPD, closed)
B
10/17/2024
Violation issued (HPD, open)
B
10/17/2024
Violation issued (HPD, closed)
A
10/17/2024
Violation issued (HPD, closed)
B
07/23/2024
Violation issued (HPD, closed)
C
07/23/2024
Violation issued (HPD, closed)
C
07/10/2024
Violation issued (HPD, open)
B
07/10/2024
Violation issued (HPD, closed)
C
07/10/2024
Violation issued (HPD, closed)
C
07/10/2024
Violation issued (HPD, open)
B
07/10/2024
Violation issued (HPD, closed)
A
07/10/2024
Violation issued (HPD, closed)
C
07/08/2024
Violation issued (HPD, open)
B
07/08/2024
Violation issued (HPD, closed)
C
07/08/2024
Violation issued (HPD, open)
B
07/08/2024
Violation issued (HPD, open)
B
07/08/2024
Violation issued (HPD, open)
B
05/08/2024
Violation issued (HPD, closed)
B
05/08/2024
Violation issued (HPD, closed)
C
05/08/2024
Violation issued (HPD, open)
C
Latest 60 of 77 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedTHE SCI CONSTRUCTION06/30/2025
DOB NOWPlumbingSigned-offNATIONWIDE MECHANICAL INC01/07/2022
DOB NOWPlumbingSigned-offNATIONWIDE MECHANICAL INC12/09/2021
BISOTISSUEDJ. SIEBOLD CONSTRUCTION CORP03/25/2005
BISPLISSUEDGEORGE S. BATEMAN PLUMBING/HEATG08/11/2004
1 project · most recent 04/19/2022
Gas
FiledStatusContractorScope
04/19/2022Signed-offNATIONWIDE MECHANICAL INCGas
1 project · most recent 12/08/2025
FiledStatusContractorScope
12/08/2025CompleteDVM ELECTRICAL SERVICES L1 meters
1 project · most recent 06/15/2025
FiledStatusContractorScope
06/15/2025Permit IssuedTHE SCI CONSTRUCTION80 panels, 50.4 kw, 5,800 roof_area_sqft
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
04/13/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
06/04/2025Fire-Resistant Penetrations and JointsJames Clancyspecial
06/04/2025Structural Stability – Alterations of existing buildingsJames Clancyspecial
06/04/2025Energy Code Compliance InspectionsJames Clancyprogress
06/04/2025FinalJames Clancyprogress
06/04/2025Air barrier - visual inspectionJames Clancyenergy_progress
09/08/2021Fire-Resistant Penetrations and JointsJulio Leder-Luisspecial
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/24/2026X00590111-P1Request digital key ↗
08/24/2026X00590111-I1Request digital key ↗
08/24/2026X00590111-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/24/2026X00590111-I1Open ↗
08/24/2026X00590111-P1Open ↗
08/24/2026X00590111-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026X01236243-I1Open ↗
08/25/2026X01236243-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/26/2026X00590082-I1Open ↗
08/25/2026X01236243-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/24/2026X00590111-P1Open ↗
08/24/2026X00590111-I1Open ↗
08/24/2026X00590111-P2Open ↗
Showing 3 of 4 on file for this type