School or academy
R. C. Williams Warehouse
259 10 AVENUE · BIN 1012384
💬 Discuss this project
1928Year Built
10Stories
W3Building Class
C6-3Zoning
214,780 sfGross Floor Area
1Units
LL97 Covered3 Open Violations ▸FISP: SWARMP
School or academy · Owner of record: 1026 REAL ESTATE INVESTORS LLC · 19,760 sf lot · 10.87 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction17p · 3 filings · 20 docs
Floor 111p · 1 filing · 9 docs
Floor 103p · 2 filings · 20 docs
Floor 9
Floor 83p · 2 filings · 19 docs
Floor 7
Floor 6Under Construction16p · 6 filings · 20 docs
Floor 510p · 2 filings · 20 docs
Floor 4
Floor 3
Floor 26p · 3 filings · 20 docs
Floor 15p · 1 filing · 12 docs
1 job · most recent 08/13/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/13/2026Permit IssuedINTEGRATED HVAC SYS & SVCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Lg ZRUM096BTE6 8 tons · Condensing Unit ×1
ZRUN024GSS0 2 tons · Condensing Unit ×1
Ventilation
Lg ZRNU243SKSA 537 CFM · Vrf Outdoor ×1
ZRNU963B8AA 2,542 CFM · Vrf Outdoor ×1
10 jobs · most recent 12/23/2024
General Wiring
FiledStatusContractorScope
12/23/2024CompleteTOP SHELF ELECTRIC CORP—
06/28/2023CompleteA.S.K. ELECTRICAL CORPGeneral Wiring
02/28/2023CompleteLIPPOLIS ELECTRIC, INC.3 meters
01/26/2023CompleteA.S.K. ELECTRICAL CORPGeneral Wiring
06/20/2022CompleteA.S.K. ELECTRICAL CORP—
06/17/2021CompleteA.S.K. ELECTRICAL CORP—
06/17/2021CompleteA.S.K. ELECTRICAL CORPGeneral Wiring
08/29/2020Complete5 J'S ELECTL CONTS CORP—
08/13/2020CompleteTOP SHELF ELECTRIC CORP—
02/01/2019CompleteTOP SHELF ELECTRIC CORP—
Building Lifecycle
All (234)Filed (30)Permit Issued (30)Signed Off (20)Facade (FISP) (18)Violation (60)Inspection (12)Objection (34)Special Inspection (30)
08/19/2026
Permit issued — Mechanical Systems
M01432133-I1-MS
08/19/2026
Permit issued — General Construction
M01432133-I1-GC
08/13/2026
Filed — Alteration
REPLACE TWO (2) SPLIT AC SYSTEMS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01432133-I1
08/13/2026
Special inspection requirement — HVAC-R and service water heating equipment
Joseph Bazini
08/04/2026
Cycle 10 facade report signed — SAFE
07/16/2026
Special inspection requirement — Mechanical Systems
Joseph Bazini
07/16/2026
Special inspection requirement — Final
Joseph Bazini
07/07/2026
Signed off — Alteration
Modification to existing plumbing fixtures and sprinkler system as per plans filed herewith. NO change in use, egress or occupancy.
M01189498-I1
06/25/2026
Cycle 10 facade report submitted
06/11/2026
Cycle 10 facade inspection completed
06/05/2026
Special inspection requirement — Sprinkler Systems
Howard Bader
05/22/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT
M01060448-I1
05/11/2026
Filed — Alteration
Modification to existing plumbing fixtures and sprinkler system as per plans filed herewith. NO change in use, egress or occupancy.
M01189498-P2
05/06/2026
Special inspection requirement — Sprinkler Systems
Howard Bader
12/23/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/17/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/10/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/24/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/21/2025
Signed off — Alteration
M01189494-I1
10/21/2025
Signed off — Alteration
Removal and installation of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy.
M01188804-I1
10/07/2025
Signed off — Alteration
M01054926-I1
09/30/2025
Objection resolved — Addressed
09/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Howard Bader
09/12/2025
Special inspection requirement — Fire-Resistance Rated Construction
Howard Bader
09/12/2025
Special inspection requirement — Final
Howard Bader
09/05/2025
Objection resolved — Addressed
09/04/2025
Objection raised — Scope
09/04/2025
Objection raised — Admin
09/02/2025
Signed off — Alteration
M01176181-I1
08/25/2025
Objection resolved — Addressed
08/22/2025
Objection raised — Admin
08/12/2025
Filed — Alteration
Removal and installation of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy.
M01188804-P1
08/12/2025
Filed — Alteration
Modification to existing plumbing fixtures and sprinkler system as per plans filed herewith. NO change in use, egress or occupancy.
M01189498-P1
08/12/2025
Permit issued — General Construction
M01054926-I1-GC
08/12/2025
Permit issued — Suspended Scaffold
M01060448-I1-SC
08/07/2025
Special inspection requirement — Final
Howard Bader
08/07/2025
Special inspection requirement — Fire-Resistance Rated Construction
Howard Bader
08/07/2025
Special inspection requirement — Sprinkler Systems
Howard Bader
08/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Howard Bader
06/18/2025
Permit issued — Sprinklers
M01189498-I1-EW-SP
06/11/2025
Permit issued — Suspended Scaffold
M01060448-I1-SC
06/09/2025
Permit issued — Plumbing
M01189498-I1-PL
05/06/2025
Permit issued — Mechanical Systems
M01189494-I1-MS
05/05/2025
Permit issued — General Construction
M01188804-I1-GC
04/15/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
George Xerakias
04/14/2025
Filed — Alteration
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT
M01060448-P1
04/04/2025
Objection raised — Admin
04/04/2025
Objection resolved — Addressed
04/04/2025
Objection raised — Cost
04/04/2025
Objection resolved — Addressed
03/27/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
George Xerakias
03/26/2025
Permit issued — General Construction
M01054926-I1-GC
03/25/2025
Filed — Alteration
Removal and installation of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy.
M01188804-I1
03/24/2025
Filed — Alteration
Modification to existing plumbing fixtures and sprinkler system as per plans filed herewith. NO change in use, egress or occupancy.
M01189498-I1
03/24/2025
Filed — Alteration
M01189494-I1
03/04/2025
Special inspection requirement — Mechanical Systems
Howard Bader
03/04/2025
Special inspection requirement — Final
Howard Bader
02/20/2025
Permit issued — Sidewalk Shed
M01176181-I1-SH
02/19/2025
Filed — Alteration
M01176181-I1
12/01/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 234 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AVENUES THE WORLD SCHOOL6607/08/2026
SPRING SCAFFOLDING LLC903/22/2026
HENSEL PHELPS CONSTRUCTION CO.503/22/2026
1026 REAL ESTATE INVESTORS LLC103/22/2026
PILKU CONSTRUCTION203/22/2026
RELATED CONSTRUCTION103/22/2026
10-26 INVESTORS INVESTORS103/22/2026
STV CONSTRUCTION303/22/2026
TEN TWENTY-SIX INVESTORS LP13603/21/2026
TEN TWENTY SIX INVESTMENTS203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 EXPEDITING SERVICE CORP.2003/21/2026
UNITED SAFETY CONSULTANTS203/21/2026
SUPERSTRUCTURES ENG + ARCH103/21/2026
HS DESIGN STUDIO403/21/2026
PATUXENT ENGINEERING203/21/2026
AE DESIGN SOLUTION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TAURINO MANAGEMENT, INCGeneral Contractor1107/08/2026
SPRING SCAFFOLDING LLCGeneral Contractor903/21/2026
LAWRENCE J. LEVINEFire Protection703/21/2026
WOLF CONSTRUCTION CORP 20General Contractor407/08/2026
THE GRENADIER CORPORATIONGeneral Contractor404/08/2026
MANHATTAN D ENTERPRISESGeneral Contractor303/21/2026
INTEGRATED HVAC SYS & SVCGeneral Contractor308/20/2026
SKINNER PLUMBING & HEATINGPlumbing207/08/2026
AJC SPRINKLER CORPFire Protection207/08/2026
METROCITY GROUPGeneral Contractor103/21/2026
JARAMILLO CARLOSGeneral Contractor103/21/2026
SKINNER PLMNG & HTG CORPFire Protection107/08/2026
PAR FIRE PROTECTION LLCFire Protection106/07/2026
VAN VASSELLElectrical103/21/2026
METROCITY GROUP,INCPlumbing107/08/2026
PAR PLUMBING CO., INCPlumbing106/07/2026
A.S.K. ELECTRICAL CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BAZINI ENGINEERING, P.C.1808108/13/2026
H. A. BADER CONSULTANTS23321605/11/2026
VINCENT J. LIOTTA P. E.1974109/28/2022
BLACK BOX ENGINEERING7196208/19/2022
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedINTEGRATED HVAC SYS & SVC08/19/2026
DOB NOWGeneral ConstructionPermit IssuedINTEGRATED HVAC SYS & SVC08/19/2026
DOB NOWGeneral ConstructionSigned-offTHE GRENADIER CORPORATION08/12/2025
DOB NOWSuspended ScaffoldPermit IssuedTHE GRENADIER CORP08/12/2025
DOB NOWSprinklersSigned-offLAWRENCE J. LEVINE06/18/2025
DOB NOWSuspended ScaffoldPermit IssuedTHE GRENADIER CORP06/11/2025
DOB NOWPlumbingSigned-offPAR PLUMBING CO., INC06/09/2025
DOB NOWMechanical SystemsSigned-offWOLF CONSTRUCTION CORP 2005/06/2025
DOB NOWGeneral ConstructionSigned-offWOLF CONSTRUCTION CORP 2005/05/2025
DOB NOWGeneral ConstructionSigned-offTHE GRENADIER CORPORATION03/26/2025
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC02/20/2025
DOB NOWGeneral ConstructionSigned-offTHE GRENADIER CORPORATION06/17/2024
DOB NOWSuspended ScaffoldPermit IssuedTHE GRENADIER CORP06/05/2024
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC05/30/2024
DOB NOWPlumbingSigned-offSKINNER PLUMBING & HEATIN06/16/2023
DOB NOWGeneral ConstructionSigned-offTAURINO MANAGEMENT, INC06/15/2023
DOB NOWMechanical SystemsSigned-offTAURINO MANAGEMENT, INC05/04/2023
DOB NOWMechanical SystemsSigned-offINTEGRATED HVAC SYS SVC10/10/2022
DOB NOWStructuralSigned-offTAURINO MANAGEMENT, INC06/21/2022
DOB NOWPlumbingSigned-offSKINNER PLMNG & HTG CORP06/08/2022
DOB NOWGeneral ConstructionSigned-offTAURINO MANAGEMENT, INC05/27/2022
DOB NOWSprinklersSigned-offSKINNER PLUMBING & HEATIN05/25/2022
DOB NOWGeneral ConstructionSigned-offTAURINO MANAGEMENT, INC05/24/2022
DOB NOWMechanical SystemsSigned-offTAURINO MANAGEMENT, INC05/19/2022
DOB NOWSprinklersSigned-offAJC SPRINKLER CORP08/23/2021
DOB NOWPlumbingSigned-offMETROCITY GROUP,INC07/14/2021
DOB NOWMechanical SystemsSigned-offTAURINO MANAGEMENT, INC04/26/2021
DOB NOWSidewalk ShedSigned-offMANHATTAN D ENTERPRISES08/27/2020
DOB NOWPlumbingSigned-offAJC SPRINKLER CORP05/14/2020
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC02/01/2019
BISOTISSUEDTAURINO MANAGEMENT, INC04/22/2021
BISPLISSUEDMETROCITY GROUP,INC04/12/2021
BISSPISSUEDAJC SPRINKLER CORP04/12/2021
BISPLISSUEDTRISTATE PLBG SVCS CORP06/17/2019
BISOTISSUEDTAURINO MANAGEMENT, INC06/13/2019
BISOTISSUEDSKYLINE RESTORATION INC02/28/2019
BISEQISSUEDCORE SCAFFOLD SYSTEMS INC.01/17/2019
BISSPISSUEDTRISTATE PLBG SVCS CORP09/05/2018
BISPLISSUEDTRISTATE PLBG SVCS CORP07/02/2018
BISOTISSUEDSKYLINE RESTORATION INC06/28/2018
+ 40 more permits on file
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
12/23/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/17/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/10/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/19/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/16/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/12/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/12/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/10/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/08/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/05/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/05/2022Certified Sprinkler - SP - RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 40
DateRequirementInspectorRole
08/13/2026HVAC-R and service water heating equipmentJoseph Bazinienergy_progress
07/16/2026Mechanical SystemsJoseph Bazinispecial
07/16/2026FinalJoseph Baziniprogress
06/05/2026Sprinkler SystemsHoward Baderspecial
05/06/2026Sprinkler SystemsHoward Baderspecial
09/12/2025Fire-Resistant Penetrations and JointsHoward Baderspecial
09/12/2025Fire-Resistance Rated ConstructionHoward Baderprogress
09/12/2025FinalHoward Baderprogress
08/07/2025FinalHoward Baderprogress
08/07/2025Fire-Resistance Rated ConstructionHoward Baderprogress
08/07/2025Sprinkler SystemsHoward Baderspecial
08/07/2025Fire-Resistant Penetrations and JointsHoward Baderspecial
04/15/2025Alternative Materials - OTCR Buildings Bulletin NumberGeorge Xerakiasspecial
03/27/2025Alternative Materials - OTCR Buildings Bulletin NumberGeorge Xerakiasspecial
03/04/2025Mechanical SystemsHoward Baderspecial
03/04/2025FinalHoward Baderprogress
03/29/2023Fire-Resistance Rated ConstructionHoward Baderprogress
03/29/2023Fire-Resistant Penetrations and JointsHoward Baderspecial
03/06/2023FinalHoward Baderprogress
03/06/2023FinalHoward Baderprogress
03/06/2023Mechanical SystemsHoward Baderspecial
08/23/2022FinalHoward Baderprogress
08/21/2022Structural Steel - WeldingDavid Buenospecial
08/21/2022FinalDavid Buenoprogress
08/21/2022Structural Steel - DetailsDavid Buenospecial
Latest 25 of 40.
▾Documents — 1,403 on file (BIS + DOB NOW)
▸Plans & Drawings33
▸DOB NOWPlans/Sketch23
09/02/2026M00734222-I1Request digital key ↗
09/02/2026M00734236-I1Request digital key ↗
09/02/2026M00733339-I1Request digital key ↗
Showing 3 of 23 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/04/2026M00307075-P2Request digital key ↗
09/04/2026M00307075-P1Request digital key ↗
08/15/2026M00307075-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler3
09/04/2026M00307075-P2Request digital key ↗
09/04/2026M00307075-P1Request digital key ↗
08/15/2026M00307075-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/05/2026M00125917-I1Request digital key ↗
09/04/2026M00390183-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/05/2026M00306998-P1Request digital key ↗
08/15/2026M00306998-I1Request digital key ↗
▸Applications & Permits295
▸BISPLAN / WORK APPROVAL APPLICATION153
05/09/2023120640093Open ↗
03/31/2023120640093Open ↗
03/27/2023120640093Open ↗
Showing 3 of 153 on file for this type
▸BISWORK PERMIT APPLICATION87
04/22/2021123830239Open ↗
04/12/2021122416750Open ↗
04/12/2021122416741Open ↗
Showing 3 of 87 on file for this type
▸BISPLACE OF ASSEMBLY24
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 24 on file for this type
▸DOB NOWLPC Approval/Permit24
09/05/2026M00306998-P1Open ↗
09/04/2026M00307075-P2Open ↗
09/04/2026M00307075-P1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWHPD Certification Letter or CPC Special Permit4
08/22/2026M01188804-I1Open ↗
08/13/2026M01188804-P1Open ↗
Showing 2 of 4 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Seals & Professional Certifications269
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION142
03/11/2020123830239Open ↗
03/11/2020123830239Open ↗
01/14/2020140764634Open ↗
Showing 3 of 142 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature30
09/05/2026M00306998-P1Open ↗
09/05/2026M00306998-I1Open ↗
09/04/2026M00307075-P1Open ↗
Showing 3 of 30 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST25
05/16/2019123761875Open ↗
05/10/2019123901518Open ↗
Showing 2 of 25 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature21
09/23/2026M01060448-P1Open ↗
09/01/2026M01189498-P2Open ↗
09/01/2026M01432133-I1Open ↗
Showing 3 of 21 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT17
05/16/2019123761875Open ↗
05/10/2019123901518Open ↗
05/10/2019123901518Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
09/01/2026M01432133-I1Open ↗
09/01/2026M01432133-I1Open ↗
09/01/2026M00839626-I1Open ↗
Showing 3 of 15 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISProfessional and Owner Certification (POC3)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment85
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE25
10/24/2019123901518Open ↗
05/16/2019123761875Open ↗
05/10/2019123901518Open ↗
Showing 3 of 25 on file for this type
▸BISSCHEDULE B - PLUMBING20
06/25/2021122416750Open ↗
10/13/2020122042869Open ↗
Showing 2 of 20 on file for this type
▸BISSELF-CERT PLUMBING NOTICE19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA9
01/11/2023122452274Open ↗
11/15/2022122108664Open ↗
12/15/2021121224031Open ↗
Showing 3 of 9 on file for this type
▸BISSIGN HANGER CERTIFICATE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTANDPIPE INSP REPORT : FP-842
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSPRINKLER INSP REPORT : FP-851
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection42
▸DOB NOWHPD-1: Anti-Harassment Area Checklist15
09/05/2026M00306998-P1Open ↗
09/04/2026M00307075-P2Open ↗
09/04/2026M00307075-P1Open ↗
Showing 3 of 15 on file for this type
▸BISANTI-HARASSMENT CHECKLIST11
05/11/2020123830239Open ↗
05/16/2019123761875Open ↗
05/10/2019123901518Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWCertificate of No Harassment10
09/05/2026M00306998-P1Open ↗
08/22/2026M01188804-I1Open ↗
08/16/2026M01432133-I1Open ↗
Showing 3 of 10 on file for this type
▸BISANTI-HARASSMENT CHECKLIST: CLINTON5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES1
11/05/2021122416750Open ↗
▸Environmental & Asbestos113
▸BISASBESTOS: CERTIFICATION (DEP ACP5)24
05/11/2020123830239Open ↗
05/08/2020123830239Open ↗
06/05/2019123901518Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report24
09/05/2026M00306998-P1Open ↗
09/04/2026M00307075-P1Open ↗
09/04/2026M00307075-P2Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWOER: Notice to Proceed21
09/04/2026M00307075-P2Open ↗
09/04/2026M00307075-P1Open ↗
09/02/2026M00734222-I1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWOER: Notice of Satisfaction17
09/02/2026M00734222-I1Open ↗
08/17/2026M01189498-I1Open ↗
08/15/2026M00307075-I1Open ↗
Showing 3 of 17 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION11
01/10/2023123349457Open ↗
12/30/2022122804180Open ↗
11/14/2022122108664Open ↗
Showing 3 of 11 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED8
05/11/2020123830239Open ↗
Showing 1 of 8 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Energy Compliance28
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS16
03/11/2020123830239Open ↗
Showing 1 of 16 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS7
08/12/2021123830239Open ↗
06/24/2020122423145Open ↗
06/22/2020122423145Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
07/19/2021122416741Open ↗
05/26/2020122804956Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
07/19/2021122416741Open ↗
▸Inspections & Test Reports13
▸BISTECHNICAL REPORT: RESPONSIBILITY11
02/16/2022122042869Open ↗
08/12/2021123830239Open ↗
08/12/2021123830239Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Approvals, Objections & Sign-offs215
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST77
01/25/2023123349457Open ↗
01/24/2023122804180Open ↗
01/17/2023122452274Open ↗
Showing 3 of 77 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION33
06/14/2023120640093Open ↗
05/11/2020123830239Open ↗
01/14/2020140764634Open ↗
Showing 3 of 33 on file for this type
▸BISADMINISTRATIVE OBJECTIONS29
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 29 on file for this type
▸BISLANDMARKS APPROVAL24
05/22/2020123830239Open ↗
01/14/2020140764634Open ↗
11/21/2019123901518Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWHigh Line Parks Approval22
09/05/2026M00306998-P1Open ↗
09/04/2026M00307075-P1Open ↗
09/04/2026M00307075-P2Open ↗
Showing 3 of 22 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE12
03/31/2023120640093Open ↗
03/22/2023120640093Open ↗
09/28/2022120640093Open ↗
Showing 3 of 12 on file for this type
▸BISLANDMARKS SIGNOFF7
05/03/2023120640093Open ↗
01/23/2023123349457Open ↗
01/09/2023122452274Open ↗
Showing 3 of 7 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSHED LETTER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSUPERSEDING LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Cost, Insurance & Ownership67
▸BISCOST AFFIDAVIT56
08/12/2021123830239Open ↗
06/24/2020122423145Open ↗
05/26/2020122804956Open ↗
Showing 3 of 56 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW38
03/10/2023120640093Open ↗
12/14/2022123349457Open ↗
12/14/2022122804180Open ↗
Showing 3 of 8 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Filing & Intake Forms151
▸BISADDITIONAL INFORMATION69
10/20/2022120640093Open ↗
07/26/2022120640093Open ↗
08/12/2021123830239Open ↗
Showing 3 of 69 on file for this type
▸BISEFILING COVER SHEET53
03/11/2020123830239Open ↗
05/16/2019123761875Open ↗
05/10/2019123901518Open ↗
Showing 3 of 53 on file for this type
▸BISBOROUGH INTAKE FORM27
04/22/2021123830239Open ↗
02/05/2020120640093Open ↗
01/14/2020140764634Open ↗
Showing 3 of 27 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Other Documents62
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION32
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 32 on file for this type
▸DOB NOWProof of Historic Building15
09/02/2026M00734222-I1Open ↗
08/22/2026M01188804-I1Open ↗
08/17/2026M01189498-P2Open ↗
Showing 3 of 15 on file for this type
▸BISSupporting Document: Fee Exempt4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISENVIRONMENTAL(E) DEP NOTICE TO PROCEED3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWManufacturer's Specifications2
08/13/2026M01060448-I1Open ↗
08/13/2026M01060448-P1Open ↗
▸DOB NOWCalculations2
08/13/2026M01060448-I1Open ↗
Showing 1 of 2 on file for this type
▸BISCORRECT ENTRIES AT PENTHOUSE ON SCHEDULE A1
06/14/2023120640093Open ↗
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWMultiple Dwelling Special District Feasibility of Government Funded Rehabilitation1
08/13/2026M00125917-I1Open ↗
▸DOB NOWMultiple Dwelling Special District Notice to Community Board1
08/13/2026M00125917-I1Open ↗