Two family frame
259-40 149 ROAD
QUEENS · BIN 4291187
💬 Discuss this project
1960Year Built
2Stories
B2Building Class
R3XZoning
2,712 sfGross Floor Area
2Units
Two family frame · 4,976 sf lot · 0.55 FAR built · Flood zone X500
Locations of Work
Architecture
Roof1p · 1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
M-CON ENGINEERING, PC105/16/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUSTAINABLE STRATEGIESGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
M-CON ENGINEERING7341105/16/2025
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
12/08/2025
Signed off — Alteration
INSTALLATION OF SOLAR ELECTRIC GENERATION SYSTEM FOR UTILITY INTERCONNECTION
Q01227377-I1
05/30/2025
Permit issued — Solar
Q01227377-I1-SL
05/16/2025
Filed — Alteration
INSTALLATION OF SOLAR ELECTRIC GENERATION SYSTEM FOR UTILITY INTERCONNECTION
Q01227377-I1
05/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michelle Contri
05/16/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Michelle Contri
05/16/2025
Special inspection requirement — Energy Code Compliance Inspections
Michelle Contri
05/16/2025
Special inspection requirement — Final
Michelle Contri
05/16/2025
Special inspection requirement — Air barrier - visual inspection
Michelle Contri
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUSTAINABLE STRATEGIES05/30/2025
1 project · most recent 05/16/2025
FiledStatusContractorScope
05/16/2025CompleteSOURCE ELECTRIC INC1 meters
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
05/16/2025Fire-Resistant Penetrations and JointsMichelle Contrispecial
05/16/2025Structural Stability – Alterations of existing buildingsMichelle Contrispecial
05/16/2025Energy Code Compliance InspectionsMichelle Contriprogress
05/16/2025FinalMichelle Contriprogress
05/16/2025Air barrier - visual inspectionMichelle Contrienergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/20/2026Q01227377-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026Q01227377-I1Open ↗
09/01/2026Q01227377-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026Q01227377-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026Q01227377-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q01227377-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01227377-I1Open ↗