← Back
Two stories - detached, small or mid-size
259 EAST 240 STREET
BRONX · Wakefield-Woodlawn · BIN 2019320
💬 Discuss this project
1935Year Built
2.75Stories
A1Building Class
R4AZoning
1,920 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,000 sf lot · 0.48 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Attic8p · 2 filings · 18 docs
Floor 29p · 2 filings · 18 docs
Floor 110p · 2 filings · 18 docs
Cellar9p · 2 filings · 18 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/25/2019$470K—— → —$245/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BUILDTECH ENGINEERING DPC209/13/2022
URBAN TRANS ENGINEERING, LLC105/05/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GEORGE FEDERLINElectrical103/21/2026
REDLINE ELECTRIC INCElectrical103/22/2026
MAMC CONSULTING REPS LLCGeneral Contractor107/08/2026
DOVAL PLBG & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JOSE A SANTOS PE, PC3292309/13/2022
Building Lifecycle
All (17)Filed (3)Permit Issued (2)Signed Off (2)Inspection (2)Special Inspection (8)
11/22/2022
Signed off — Alteration
X00282394-I1
11/20/2022
Permit issued — Mechanical Systems
X00282394-I1-MS
09/22/2022
Signed off — Alteration
FILING TO RESTORE GAS SERVICE AT ONE FAMILY HOME. INSTALLING FIXTURES THROUGHOUT AS PER PLANS SUBMITTED HEREWITH. THERE WILL BE NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS UNDER THIS APPLICATION.
X00282191-I1
09/15/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/13/2022
Filed — Alteration
FILING TO RESTORE GAS SERVICE AT ONE FAMILY HOME. INSTALLING FIXTURES THROUGHOUT AS PER PLANS SUBMITTED HEREWITH. THERE WILL BE NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS UNDER THIS APPLICATION.
X00282191-P1
09/13/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jose Santos
09/13/2022
Special inspection requirement — Energy Code Compliance Inspections
Jose Santos
09/13/2022
Special inspection requirement — HVAC and service water heating system controls
Jose Santos
09/13/2022
Special inspection requirement — HVAC and service water heating equipment
Jose Santos
08/02/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jose Santos
08/02/2022
Special inspection requirement — Energy Code Compliance Inspections
Jose Santos
08/02/2022
Special inspection requirement — HVAC and service water heating equipment
Jose Santos
08/02/2022
Special inspection requirement — HVAC and service water heating system controls
Jose Santos
08/30/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/23/2021
Permit issued — Plumbing
X00282191-I1-PL
05/05/2020
Filed — Alteration
X00282394-I1
05/05/2020
Filed — Alteration
FILING TO RESTORE GAS SERVICE AT ONE FAMILY HOME. INSTALLING FIXTURES THROUGHOUT AS PER PLANS SUBMITTED HEREWITH. THERE WILL BE NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS UNDER THIS APPLICATION.
X00282191-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedMAMC CONSULTING REPS LLC11/20/2022
DOB NOWPlumbingSigned-offDOVAL PLBG & HTG CORP08/23/2021
BISOTISSUEDTRINITY SOLAR LLC12/02/2021
1 project · most recent 12/06/2021
FiledStatusContractorScope
12/06/2021CompleteREDLINE ELECTRIC INC—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
09/15/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/30/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
09/13/2022Fire-Resistant Penetrations and JointsJose Santosspecial
09/13/2022Energy Code Compliance InspectionsJose Santosprogress
09/13/2022HVAC and service water heating system controls Jose Santosenergy_progress
09/13/2022HVAC and service water heating equipment Jose Santosenergy_progress
08/02/2022Fire-Resistant Penetrations and JointsJose Santosspecial
08/02/2022Energy Code Compliance InspectionsJose Santosprogress
08/02/2022HVAC and service water heating equipment Jose Santosenergy_progress
08/02/2022HVAC and service water heating system controls Jose Santosenergy_progress
▾Documents — 51 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch - Plumbing3
08/26/2026X00282191-I1Request digital key ↗
08/26/2026X00282191-P1Request digital key ↗
08/15/2026X00282191-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/26/2026X00282394-I1Request digital key ↗
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION3
12/16/2022240312666Open ↗
12/07/2022240312666Open ↗
12/01/2021240312666Open ↗
▸BISWORK PERMIT APPLICATION1
12/02/2021240312666Open ↗
▸Seals & Professional Certifications14
▸DOB NOWProgress Inspector Seal & Signature6
09/05/2026X00282191-P1Open ↗
09/05/2026X00282191-P1Open ↗
09/05/2026X00282191-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/26/2026X00282191-I1Open ↗
08/26/2026X00282191-P1Open ↗
08/26/2026X00282394-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/05/2026X00282191-P1Open ↗
08/23/2026X00282191-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
12/01/2021240312666Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
12/01/2021240312666Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/01/2021240312666Open ↗
▸Safety & Tenant Protection1
▸BISTPP1: TENANT PROTECTION PLAN1
12/02/2021240312666Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/26/2026X00282191-I1Open ↗
08/26/2026X00282191-P1Open ↗
08/26/2026X00282394-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
12/01/2021240312666Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
02/14/2023240312666Open ↗
12/01/2021240312666Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
12/01/2021240312666Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
02/14/2023240312666Open ↗
▸BISNYCECC ANALYSIS1
12/01/2021240312666Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
12/01/2021240312666Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
02/14/2023240312666Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
02/14/2023240312666Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
02/14/2023240312666Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY4
02/14/2023240312666Open ↗
02/14/2023240312666Open ↗
12/02/2021240312666Open ↗
Showing 3 of 4 on file for this type
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
02/14/2023240312666Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
02/14/2023240312666Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
02/14/2023240312666Open ↗
▸Approvals, Objections & Sign-offs4
▸BISLETTERS - SUPPORTING DOCUMENTATION2
02/16/2023240312666Open ↗
02/16/2023240312666Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
02/16/2023240312666Open ↗
▸BISFINAL1
02/14/2023240312666Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
12/01/2021240312666Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
02/14/2023240312666Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
12/16/2022240312666Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
12/01/2021240312666Open ↗