259 HALSEY STREET
BROOKLYN · BIN 3052856
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
0 Open ViolationsFDNY Report ↗
Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Roof4p · 1 filing · 20 docs
Penthouse3p · 1 filing · 20 docs
Floor 46p · 1 filing · 20 docs
Floor 34p · 1 filing · 20 docs
Floor 22p · 1 filing · 20 docs
Floor 14p · 1 filing · 20 docs
Cellar6p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TRIERA CONTRACTING407/08/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
INFOCUS DESIGN AND PLANNING PC603/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GREENWOOD MONITORING LLCGeneral Contractor1607/08/2026
HP BUILDING MANAGEMENT INGeneral Contractor407/08/2026
BRUCHE MECHANICAL NY LLCFire Protection207/08/2026
PLBG P & H INCPlumbing207/08/2026
TRIERA CONTRACTING INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CENTURY TESTING & CONSULT4081909/09/2025
Building Lifecycle
All (61)Filed (10)Permit Issued (4)Signed Off (1)Violation (3)Objection (13)Special Inspection (30)
10/02/2025
Special inspection requirement — Lighting controls
ALDO BRAVO
10/02/2025
Special inspection requirement — Fenestration air leakage
ALDO BRAVO
10/02/2025
Special inspection requirement — Fenestration areas
ALDO BRAVO
10/02/2025
Special inspection requirement — Concrete - Cast-In-Place
ALDO BRAVO
10/02/2025
Special inspection requirement — Fire-Resistance Rated Construction
ALDO BRAVO
10/02/2025
Special inspection requirement — Energy Code Compliance Inspections
ALDO BRAVO
10/02/2025
Special inspection requirement — Air barrier - visual inspection
ALDO BRAVO
10/02/2025
Special inspection requirement — Interior lighting power
ALDO BRAVO
10/02/2025
Special inspection requirement — Preliminary
ALDO BRAVO
10/02/2025
Special inspection requirement — Insulation placement and R values
ALDO BRAVO
10/02/2025
Special inspection requirement — Protection of exposed foundation insulation
ALDO BRAVO
10/02/2025
Special inspection requirement — Subgrade Inspections
ALDO BRAVO
10/02/2025
Special inspection requirement — Exterior lighting power
ALDO BRAVO
10/02/2025
Special inspection requirement — Metering
ALDO BRAVO
10/02/2025
Special inspection requirement — Masonry
ALDO BRAVO
10/02/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
ALDO BRAVO
10/02/2025
Special inspection requirement — Lighting in dwelling units
ALDO BRAVO
10/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALDO BRAVO
10/02/2025
Special inspection requirement — Maintenance information
ALDO BRAVO
09/29/2025
Objection resolved — Addressed
09/17/2025
Objection resolved — Addressed
09/15/2025
Objection raised — Structural
09/11/2025
Objection resolved — Addressed
09/09/2025
Filed — New Building
THIS APPLICATION IS FILED TO BUILD 8 8-FAMILY RESIDENCE, A 4-STORY BUILDING WITH A PENTHOUSE.
B00948397-A2
09/08/2025
Special inspection requirement — HVAC-R and service water heating equipment
FRANZ SEBORGA
09/08/2025
Special inspection requirement — Sprinkler Systems
FRANZ SEBORGA
09/08/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FRANZ SEBORGA
09/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FRANZ SEBORGA
09/08/2025
Special inspection requirement — HVAC-R and service water heating system controls
FRANZ SEBORGA
09/08/2025
Special inspection requirement — Energy Code Compliance Inspections
FRANZ SEBORGA
09/08/2025
Special inspection requirement — Post-installed Anchors
FRANZ SEBORGA
09/08/2025
Special inspection requirement — Maintenance information
FRANZ SEBORGA
09/05/2025
Objection raised — Scope
09/05/2025
Objection raised — Scope
08/26/2025
Filed — New Building
THIS APPLICATION IS FILED TO BUILD 8 8-FAMILY RESIDENCE, A 4-STORY BUILDING WITH A PENTHOUSE.
B00948397-A1
08/25/2025
Special inspection requirement — Exterior lighting power
ALDO BRAVO
08/25/2025
Special inspection requirement — Metering
ALDO BRAVO
08/25/2025
Special inspection requirement — Lighting controls
ALDO BRAVO
07/30/2025
Filed — New Building
THIS APPLICATION IS FILED TO BUILD 8 8-FAMILY RESIDENCE, A 4-STORY BUILDING WITH A PENTHOUSE.
B00948397-P9
07/17/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B01059991-I1
06/04/2025
Objection raised — Scope
05/27/2025
Filed — New Building
THIS APPLICATION IS FILED TO BUILD 8 8-FAMILY RESIDENCE, A 4-STORY BUILDING WITH A PENTHOUSE.
B00948397-P8
04/28/2025
Filed — New Building
THIS APPLICATION IS FILED TO BUILD 8 8-FAMILY RESIDENCE, A 4-STORY BUILDING WITH A PENTHOUSE.
B00948397-P7
10/25/2024
Objection resolved — Addressed
10/25/2024
Objection resolved — Addressed
10/24/2024
Objection raised — Admin
10/24/2024
Objection raised — Scope
10/21/2024
Objection resolved — Addressed
10/18/2024
Objection raised — Other
10/10/2024
Filed — New Building
THIS APPLICATION IS FILED TO BUILD 8 8-FAMILY RESIDENCE, A 4-STORY BUILDING WITH A PENTHOUSE.
B00948397-P5
08/22/2024
Permit issued — Supported Scaffold
B01096276-I1-SF
06/07/2024
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B01059991-I1
06/07/2024
Permit issued — Sidewalk Shed
B01059991-I1-SH
03/28/2024
Filed — New Building
THIS APPLICATION IS FILED TO BUILD 8 8-FAMILY RESIDENCE, A 4-STORY BUILDING WITH A PENTHOUSE.
B00948397-P2
03/28/2024
Filed — New Building
THIS APPLICATION IS FILED TO BUILD 8 8-FAMILY RESIDENCE, A 4-STORY BUILDING WITH A PENTHOUSE.
B00948397-P3
03/28/2024
Filed — New Building
THIS APPLICATION IS FILED TO BUILD 8 8-FAMILY RESIDENCE, A 4-STORY BUILDING WITH A PENTHOUSE.
B00948397-P1
01/22/2024
Permit issued — Full Demolition
B00915304-I1-FD
12/13/2023
Permit issued — Full Demolition
B00915304-I1-FD
10/21/2004
Violation issued (HPD, closed)
B
10/21/2004
Violation issued (HPD, closed)
B
Latest 60 of 61 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldSigned-offGREENWOOD MONITORING LLC08/22/2024
DOB NOWSidewalk ShedSigned-offTRIERA CONTRACTING INC06/07/2024
DOB NOWFull DemolitionSigned-offANGELINE PENA-LEVI01/22/2024
DOB NOWFull DemolitionSigned-offANGELINE PENA-LEVI12/13/2023
1 project · most recent 09/09/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/09/2025Permit IssuedGREENWOOD MONITORING LLCHeating and Air Conditioning Systems
Heat / Cool
Cooper & Hunter CH-HYP36MSPH230VO 28,000 BTU · Heat Pump Outdoor ×12
CH-HPR24-230VO 24,000 BTU · Heat Pump Outdoor ×2
CH-HPR48M-230VO 48,000 BTU · Heat Pump Outdoor ×2
1 project · most recent 09/09/2025
Sprinkler System
FiledStatusContractorScope
09/09/2025Signed-offPLBG P & H INCSprinkler System
1 project · most recent 09/09/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/09/2025Signed-offPLBG P & H INCGas, Storm, Water/Sanitary
1 project · most recent 09/09/2025
Steel Concrete Masonry
FiledStatusContractorScope
09/09/2025Signed-offPLBG P & H INCSteel, Concrete, Masonry
1 project · most recent 09/09/2025
Fence
FiledStatusContractorScope
09/09/2025Signed-offPLBG P & H INCFence
▾Special Inspection Requirements (DOB NOW) — 79
DateRequirementInspectorRole
10/02/2025MeteringALDO BRAVOenergy_progress
10/02/2025Interior lighting powerALDO BRAVOenergy_progress
10/02/2025Protection of exposed foundation insulationALDO BRAVOenergy_progress
10/02/2025Insulation placement and R valuesALDO BRAVOenergy_progress
10/02/2025Fenestration areasALDO BRAVOenergy_progress
10/02/2025Lighting controlsALDO BRAVOenergy_progress
10/02/2025Air barrier - visual inspectionALDO BRAVOenergy_progress
10/02/2025PreliminaryALDO BRAVOprogress
10/02/2025Energy Code Compliance InspectionsALDO BRAVOprogress
10/02/2025MasonryALDO BRAVOspecial
10/02/2025Fire-Resistant Penetrations and JointsALDO BRAVOspecial
10/02/2025Lighting in dwelling unitsALDO BRAVOenergy_progress
10/02/2025Fenestration and door U-factor and product ratingsALDO BRAVOenergy_progress
10/02/2025Fenestration air leakageALDO BRAVOenergy_progress
10/02/2025Maintenance informationALDO BRAVOenergy_progress
10/02/2025Fire-Resistance Rated ConstructionALDO BRAVOprogress
10/02/2025Exterior lighting powerALDO BRAVOenergy_progress
10/02/2025Subgrade InspectionsALDO BRAVOspecial
10/02/2025Concrete - Cast-In-PlaceALDO BRAVOspecial
09/08/2025Fire-Resistant Penetrations and JointsFRANZ SEBORGAspecial
09/08/2025HVAC-R and service water heating equipmentFRANZ SEBORGAenergy_progress
09/08/2025Maintenance informationFRANZ SEBORGAenergy_progress
09/08/2025Post-installed AnchorsFRANZ SEBORGAspecial
09/08/2025Sprinkler SystemsFRANZ SEBORGAspecial
09/08/2025Energy Code Compliance InspectionsFRANZ SEBORGAprogress
Latest 25 of 79.
▾Documents — 84 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch20
08/24/2026B01059991-I1Request digital key ↗
08/20/2026B00948397-S1Request digital key ↗
08/20/2026B00948397-P2Request digital key ↗
Showing 3 of 20 on file for this type
▸Zoning, Tax Lot & Property Records13
▸DOB NOWZD1: DOB Zoning Diagram6
08/13/2026B00948397-A1Open ↗
08/13/2026B00948397-P4Open ↗
08/13/2026B00948397-P6Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWZoning Exhibit form (1-5)6
08/13/2026B00948397-I1Open ↗
08/13/2026B00948397-P5Open ↗
08/13/2026B00948397-P8Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00948397-I1Open ↗
▸Seals & Professional Certifications20
▸DOB NOWDPL-1: Design Professional Seal & Signature20
08/20/2026B00948397-S1Open ↗
08/20/2026B00948397-I1Open ↗
08/20/2026B00948397-S2Open ↗
Showing 3 of 20 on file for this type
▸Trade Schedules & Equipment6
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)6
08/13/2026B00948397-P8Open ↗
08/13/2026B00948397-I1Open ↗
08/13/2026B00948397-A1Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist6
08/15/2026B00948397-P8Open ↗
08/15/2026B00948397-P6Open ↗
08/15/2026B00948397-P5Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00948397-I1Open ↗
▸Energy Compliance2
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026B00948397-S2Open ↗
08/13/2026B00948397-S1Open ↗
▸Other Documents16
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone6
08/13/2026B00948397-P4Open ↗
08/13/2026B00948397-I1Open ↗
08/13/2026B00948397-P5Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSite Survey: Initial5
08/13/2026B00948397-P4Open ↗
08/13/2026B00948397-P5Open ↗
08/13/2026B00948397-P6Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification4
08/15/2026B00948397-P8Open ↗
08/15/2026B00948397-P6Open ↗
08/15/2026B00948397-P5Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00948397-S7Open ↗