Two stories - detached, small or mid-size
2593 FLINT AVENUE
BRONX · BIN 2083014
💬 Discuss this project
1945Year Built
1.5Stories
A1Building Class
R3-2Zoning
2,256 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 3,700 sf lot · 0.61 FAR built · Flood zone X
Locations of Work
Architecture
Floor 22p · 1 filing · 20 docs
Floor 12p · 1 filing · 20 docs
Cellar2p · 1 filing · 20 docs
1 job · most recent 01/08/2026
Gas Water/Sanitary
FiledStatusContractorScope
01/08/2026Signed-offCAPE PLUMBING INCGas, Water/Sanitary
2 jobs · most recent 04/17/2026
General Wiring
FiledStatusContractorScope
04/17/2026CompleteSUPREME ELECTRIC CORPGeneral Wiring
08/22/2022CancelledINFINITI ELECTRIC CORPGeneral Wiring
Building Lifecycle
All (123)Filed (7)Permit Issued (2)Signed Off (2)Inspection (8)Objection (74)Special Inspection (30)
08/07/2026
Signed off — Alteration CO
APPLICATION FILING FOR PLUMBING WORKS IN CONJUNCTION WITH ALTERATION JOB X01007065-I1 INCLUDES REMOVE/CAP GAS OPERATED BOILER/HWH FROM BOILER ROOM, REPLACE EXIST & NEW INSTALL PLUMBING FIXTURES AS PER PLAN.
X01007065-I1
01/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Samy Abouzid
01/28/2026
Special inspection requirement — Fire-Resistance Rated Construction
MD SHAMIM AKOND
01/28/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
MD SHAMIM AKOND
01/28/2026
Special inspection requirement — Fenestration areas
MD SHAMIM AKOND
01/28/2026
Special inspection requirement — Lighting in dwelling units
MD SHAMIM AKOND
01/28/2026
Special inspection requirement — Interior lighting power
MD SHAMIM AKOND
01/28/2026
Special inspection requirement — Fenestration air leakage
MD SHAMIM AKOND
01/28/2026
Special inspection requirement — Metering
MD SHAMIM AKOND
01/28/2026
Special inspection requirement — Permanent certificate
MD SHAMIM AKOND
01/28/2026
Special inspection requirement — Insulation placement and R values
MD SHAMIM AKOND
01/28/2026
Special inspection requirement — Electric vehicle service equipment requirements
MD SHAMIM AKOND
01/28/2026
Special inspection requirement — Air barrier - visual inspection
MD SHAMIM AKOND
01/28/2026
Special inspection requirement — Maintenance information
MD SHAMIM AKOND
01/23/2026
Objection resolved — Addressed
01/20/2026
Objection raised — Admin
01/08/2026
Filed — Alteration CO
APPLICATION FILING FOR PLUMBING WORKS IN CONJUNCTION WITH ALTERATION JOB X01007065-I1 INCLUDES REMOVE/CAP GAS OPERATED BOILER/HWH FROM BOILER ROOM, REPLACE EXIST & NEW INSTALL PLUMBING FIXTURES AS PER PLAN.
X01007065-P4
12/19/2025
Special inspection requirement — Maintenance information
MD SHAMIM AKOND
12/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Samy Abouzid
12/19/2025
Special inspection requirement — Fire-Resistance Rated Construction
MD SHAMIM AKOND
12/19/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
MD SHAMIM AKOND
12/19/2025
Special inspection requirement — Insulation placement and R values
MD SHAMIM AKOND
12/19/2025
Special inspection requirement — Lighting in dwelling units
MD SHAMIM AKOND
12/19/2025
Special inspection requirement — Electric vehicle service equipment requirements
MD SHAMIM AKOND
12/19/2025
Special inspection requirement — Interior lighting power
MD SHAMIM AKOND
12/19/2025
Special inspection requirement — Permanent certificate
MD SHAMIM AKOND
12/19/2025
Special inspection requirement — Metering
MD SHAMIM AKOND
12/19/2025
Special inspection requirement — Fenestration air leakage
MD SHAMIM AKOND
12/19/2025
Special inspection requirement — Air barrier - visual inspection
MD SHAMIM AKOND
12/19/2025
Special inspection requirement — Fenestration areas
MD SHAMIM AKOND
12/08/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/16/2025
Filed — Alteration CO
APPLICATION FILING FOR PLUMBING WORKS IN CONJUNCTION WITH ALTERATION JOB X01007065-I1 INCLUDES REMOVE/CAP GAS OPERATED BOILER/HWH FROM BOILER ROOM, REPLACE EXIST & NEW INSTALL PLUMBING FIXTURES AS PER PLAN.
X01007065-P3
09/24/2025
Special inspection requirement — Permanent certificate
MD SHAMIM AKOND
09/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Samy Abouzid
09/24/2025
Special inspection requirement — Maintenance information
MD SHAMIM AKOND
09/24/2025
Special inspection requirement — Metering
MD SHAMIM AKOND
07/02/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/02/2025
Signed off — Alteration CO
APPLICATION FILING FOR PLUMBING WORKS IN CONJUNCTION WITH ALTERATION JOB X01007065-I1 INCLUDES REMOVE/CAP GAS OPERATED BOILER/HWH FROM BOILER ROOM, REPLACE EXIST & NEW INSTALL PLUMBING FIXTURES AS PER PLAN.
X01007065-S1
05/27/2025
Permit issued — General Construction
X01007065-I1-GC
03/07/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/13/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/23/2024
Filed — Alteration CO
APPLICATION FILING FOR PLUMBING WORKS IN CONJUNCTION WITH ALTERATION JOB X01007065-I1 INCLUDES REMOVE/CAP GAS OPERATED BOILER/HWH FROM BOILER ROOM, REPLACE EXIST & NEW INSTALL PLUMBING FIXTURES AS PER PLAN.
X01007065-P1
12/10/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/25/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/01/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/31/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/22/2024
Permit issued — Plumbing
X01007065-S1-PL
10/17/2024
Filed — Alteration CO
APPLICATION FILING FOR PLUMBING WORKS IN CONJUNCTION WITH ALTERATION JOB X01007065-I1 INCLUDES REMOVE/CAP GAS OPERATED BOILER/HWH FROM BOILER ROOM, REPLACE EXIST & NEW INSTALL PLUMBING FIXTURES AS PER PLAN.
X01007065-S1
04/25/2024
Objection resolved — Addressed
04/25/2024
Objection resolved — Addressed
04/25/2024
Objection resolved — Addressed
04/24/2024
Objection raised — Other
04/24/2024
Objection raised — Other
04/17/2024
Objection resolved — Addressed
04/17/2024
Objection resolved — Addressed
04/17/2024
Objection resolved — Addressed
04/04/2024
Objection resolved — Addressed
04/04/2024
Objection resolved — Addressed
04/04/2024
Objection resolved — Addressed
04/04/2024
Objection resolved — Addressed
Latest 60 of 123 events.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/26/2022$695K—— → —$308/sf building
10/13/2020$610K—— → —$270/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ST DESIGN & CONSULTING INC.501/08/2026
VERSAI LLC204/11/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEXTGENDESINGS103/21/2026
R H DRUMMOND EXP1003/21/2026
ZOE ANNE SINCLAIR103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LAL-ITA CONSTRUCTION INCGeneral Contractor303/21/2026
INFINITI ELECTRIC CORPElectrical103/22/2026
CAPE PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
INFINITY DESIGN CONSULTAN2760301/08/2026
VERSAI LLC8133204/11/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedLAL-ITA CONSTRUCTION INC05/27/2025
DOB NOWPlumbingSigned-offCAPE PLUMBING INC10/22/2024
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
12/08/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/02/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/07/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/13/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/10/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/25/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/01/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/31/2024Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 41
DateRequirementInspectorRole
01/28/2026Fire-Resistant Penetrations and JointsSamy Abouzidspecial
01/28/2026Fire-Resistance Rated ConstructionMD SHAMIM AKONDprogress
01/28/2026Fenestration and door U-factor and product ratingsMD SHAMIM AKONDenergy_progress
01/28/2026Fenestration areasMD SHAMIM AKONDenergy_progress
01/28/2026Lighting in dwelling unitsMD SHAMIM AKONDenergy_progress
01/28/2026Interior lighting powerMD SHAMIM AKONDenergy_progress
01/28/2026Fenestration air leakageMD SHAMIM AKONDenergy_progress
01/28/2026MeteringMD SHAMIM AKONDenergy_progress
01/28/2026Permanent certificateMD SHAMIM AKONDenergy_progress
01/28/2026Insulation placement and R valuesMD SHAMIM AKONDenergy_progress
01/28/2026Electric vehicle service equipment requirementsMD SHAMIM AKONDenergy_progress
01/28/2026Air barrier - visual inspectionMD SHAMIM AKONDenergy_progress
01/28/2026Maintenance informationMD SHAMIM AKONDenergy_progress
12/19/2025Maintenance informationMD SHAMIM AKONDenergy_progress
12/19/2025Fire-Resistant Penetrations and JointsSamy Abouzidspecial
12/19/2025Fire-Resistance Rated ConstructionMD SHAMIM AKONDprogress
12/19/2025Fenestration and door U-factor and product ratingsMD SHAMIM AKONDenergy_progress
12/19/2025Insulation placement and R valuesMD SHAMIM AKONDenergy_progress
12/19/2025Lighting in dwelling unitsMD SHAMIM AKONDenergy_progress
12/19/2025Electric vehicle service equipment requirementsMD SHAMIM AKONDenergy_progress
12/19/2025Interior lighting powerMD SHAMIM AKONDenergy_progress
12/19/2025Permanent certificateMD SHAMIM AKONDenergy_progress
12/19/2025MeteringMD SHAMIM AKONDenergy_progress
12/19/2025Fenestration air leakageMD SHAMIM AKONDenergy_progress
12/19/2025Air barrier - visual inspectionMD SHAMIM AKONDenergy_progress
Latest 25 of 41.
▾Documents — 68 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/23/2026X08048800-I1Request digital key ↗
08/20/2026X01007065-P1Request digital key ↗
08/20/2026X01007065-S1Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X01007065-I1Open ↗
▸Seals & Professional Certifications47
▸DOB NOWProgress Inspector Seal & Signature37
09/02/2026X01007065-I1Open ↗
09/02/2026X01007065-I1Open ↗
09/02/2026X01007065-I1Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/20/2026X01007065-P1Open ↗
08/20/2026X01007065-S1Open ↗
08/20/2026X01007065-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/02/2026X01007065-I1Open ↗
08/25/2026X01007065-P3Open ↗
08/23/2026X01007065-P4Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist3
08/13/2026X01007065-P4Open ↗
08/13/2026X01007065-I1Open ↗
08/13/2026X01007065-P3Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X01007065-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/20/2026X01007065-P1Open ↗
08/20/2026X01007065-S1Open ↗
08/20/2026X01007065-I1Open ↗
Showing 3 of 6 on file for this type
▸Other Documents4
▸DOB NOWProperty Ownership Certification3
08/20/2026X01007065-P3Open ↗
08/20/2026X01007065-I1Open ↗
08/20/2026X01007065-P4Open ↗
▸DOB NOWFinal Survey1
08/13/2026X01007065-I1Open ↗