← Back
Three families
26-02 DITMARS BOULEVARD
QUEENS · BIN 4018242
💬 Discuss this project
1931Year Built
2Stories
C0Building Class
R5DZoning
3,127 sfGross Floor Area
3Units
14 Open Violations 8 unresolved · 6 paperwork only ▸
Three families · 2,000 sf lot · 1.56 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingFire Protection
Roof1p · 1 filing · 3 docs
Floor 233p · 1 filing · 20 docs
Floor 135p · 1 filing · 20 docs
Basement35p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/27/2023$1.6M—2602 DITMARS BLVD REALTY LLC → Private party$496/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ENVIRONMENTAL MANAGEMENT SERVICES,806/19/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CELATECH CONSTRUCTION CORGeneral Contractor907/08/2026
M&D FIRE SPRINKLER INCFire Protection107/08/2026
DPH PLUMBING & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ENVIRONMENTAL MANAGEMENT1375602/27/2025
Building Lifecycle
All (75)Filed (8)Permit Issued (8)Signed Off (1)Violation (20)Inspection (8)Special Inspection (30)
07/29/2025
Permit issued — Curb Cut
Q00961361-S4-CC
06/19/2025
Filed — Alteration CO
PLUMBING AND SPRINKLER WORK IN CONJUCTION W/ ALT 1 APPLICATION
Q00961361-S4
05/21/2025
Violation issued (ECB, open)
Construction
04/25/2025
Signed off — Alteration
Q00953855-I1
04/23/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/16/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/14/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/21/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/14/2025
Special inspection requirement — Air barrier - visual inspection
Kosta Kamberis
03/14/2025
Special inspection requirement — Interior lighting power
Kosta Kamberis
03/14/2025
Special inspection requirement — Electric vehicle service equipment requirements
Kosta Kamberis
03/14/2025
Special inspection requirement — Insulation placement and R values
Kosta Kamberis
03/14/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Kosta Kamberis
03/14/2025
Special inspection requirement — Masonry
Kosta Kamberis
03/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kosta Kamberis
03/14/2025
Special inspection requirement — Energy Code Compliance Inspections
Kosta Kamberis
03/14/2025
Special inspection requirement — Fire-Resistance Rated Construction
Kosta Kamberis
03/14/2025
Special inspection requirement — Air barrier — testing
Kosta Kamberis
03/14/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Kosta Kamberis
03/14/2025
Special inspection requirement — Fenestration areas
Kosta Kamberis
03/14/2025
Special inspection requirement — Permanent certificate
Kosta Kamberis
03/14/2025
Special inspection requirement — Metering
Kosta Kamberis
03/14/2025
Special inspection requirement — Fenestration air leakage
Kosta Kamberis
03/14/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Kosta Kamberis
03/12/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
02/27/2025
Filed — Alteration CO
PLUMBING AND SPRINKLER WORK IN CONJUCTION W/ ALT 1 APPLICATION
Q00961361-P3
11/08/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/08/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/05/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/31/2024
Filed — Alteration CO
PLUMBING AND SPRINKLER WORK IN CONJUCTION W/ ALT 1 APPLICATION
Q00961361-P2
10/31/2024
Permit issued — Plumbing
Q00961361-S1-EW-SP
10/31/2024
Permit issued — Plumbing
Q00961361-S1-PL
10/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kosta Kamberis
10/24/2024
Special inspection requirement — Energy Code Compliance Inspections
Kosta Kamberis
10/24/2024
Special inspection requirement — Maintenance information
Kosta Kamberis
10/24/2024
Special inspection requirement — HVAC-R and service water heating system controls
Kosta Kamberis
10/24/2024
Special inspection requirement — HVAC-R and service water heating equipment
Kosta Kamberis
10/24/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Kosta Kamberis
10/24/2024
Special inspection requirement — Sprinkler Systems
Kosta Kamberis
10/16/2024
Filed — Alteration CO
PLUMBING AND SPRINKLER WORK IN CONJUCTION W/ ALT 1 APPLICATION
Q00961361-P1
10/15/2024
Special inspection requirement — Sprinkler Systems
Kosta Kamberis
10/15/2024
Special inspection requirement — Energy Code Compliance Inspections
Kosta Kamberis
10/15/2024
Special inspection requirement — HVAC-R and service water heating system controls
Kosta Kamberis
10/15/2024
Special inspection requirement — Maintenance information
Kosta Kamberis
10/15/2024
Special inspection requirement — HVAC-R and service water heating equipment
Kosta Kamberis
10/15/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Kosta Kamberis
10/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kosta Kamberis
10/01/2024
Violation issued (ECB, closed)
Unknown
10/01/2024
Violation issued (ECB, closed)
Construction
06/12/2024
Filed — Alteration CO
PLUMBING AND SPRINKLER WORK IN CONJUCTION W/ ALT 1 APPLICATION
Q00961361-S1
05/21/2024
Permit issued — General Construction
Q00961361-I1-GC
05/20/2024
Permit issued — General Construction
Q00961361-I1-GC
04/22/2024
Permit issued — Construction Fence
Q00996800-I1-FN
02/13/2024
Permit issued — Construction Fence
Q00996800-I1-FN
01/29/2024
Filed — Alteration
Q00996800-I1
01/09/2024
Permit issued — General Construction
Q00953855-I1-GC
12/18/2023
Filed — Alteration
Q00953855-I1
11/17/2023
Filed — Alteration CO
PLUMBING AND SPRINKLER WORK IN CONJUCTION W/ ALT 1 APPLICATION
Q00961361-I1
07/08/2006
Violation issued (HPD, open)
B
07/08/2006
Violation issued (HPD, open)
B
Latest 60 of 75 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutPermit IssuedCELATECH CONSTRUCTION COR07/29/2025
DOB NOWPlumbingSigned-offM&D FIRE SPRINKLER INC10/31/2024
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP10/31/2024
DOB NOWGeneral ConstructionPermit IssuedCELATECH CONSTRUCTION COR05/21/2024
DOB NOWGeneral ConstructionPermit IssuedCELATECH CONSTRUCTION COR05/20/2024
DOB NOWConstruction FencePermit IssuedCELATECH CONSTRUCTION COR04/22/2024
DOB NOWConstruction FencePermit IssuedCELATECH CONSTRUCTION COR02/13/2024
DOB NOWGeneral ConstructionSigned-offCELATECH CONSTRUCTION COR01/09/2024
1 project · most recent 06/19/2025
Sprinkler System
FiledStatusContractorScope
06/19/2025Signed-offM&D FIRE SPRINKLER INCSprinkler System
1 project · most recent 06/19/2025
Gas Water/Sanitary
FiledStatusContractorScope
06/19/2025Signed-offJMW PLUMBING, INCGas, Water/Sanitary
2 projects · most recent 10/09/2024
General Wiring
FiledStatusContractorScope
10/09/2024Permit IssuedQEC ELECTRICAL SVCE CORPGeneral Wiring
10/02/2024CompleteQEC ELECTRICAL SVCE CORP—
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
04/23/2025Pass-Final General Construction Non-Directive 14PassView ↗
04/16/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/14/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/21/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/12/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/08/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/08/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/05/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
03/14/2025Air barrier - visual inspectionKosta Kamberisenergy_progress
03/14/2025Interior lighting powerKosta Kamberisenergy_progress
03/14/2025Electric vehicle service equipment requirementsKosta Kamberisenergy_progress
03/14/2025Insulation placement and R valuesKosta Kamberisenergy_progress
03/14/2025Structural Stability – Alterations of existing buildingsKosta Kamberisspecial
03/14/2025MasonryKosta Kamberisspecial
03/14/2025Fire-Resistant Penetrations and JointsKosta Kamberisspecial
03/14/2025Energy Code Compliance InspectionsKosta Kamberisprogress
03/14/2025Fire-Resistance Rated ConstructionKosta Kamberisprogress
03/14/2025Air barrier — testing Kosta Kamberisenergy_progress
03/14/2025Fenestration and door U-factor and product ratingsKosta Kamberisenergy_progress
03/14/2025Fenestration areasKosta Kamberisenergy_progress
03/14/2025Permanent certificateKosta Kamberisenergy_progress
03/14/2025MeteringKosta Kamberisenergy_progress
03/14/2025Fenestration air leakageKosta Kamberisenergy_progress
03/14/2025Exterior Insulation and Finish Systems (EIFS)Kosta Kamberisspecial
10/24/2024Fire-Resistant Penetrations and JointsKosta Kamberisspecial
10/24/2024Energy Code Compliance InspectionsKosta Kamberisprogress
10/24/2024Maintenance informationKosta Kamberisenergy_progress
10/24/2024HVAC-R and service water heating system controlsKosta Kamberisenergy_progress
10/24/2024HVAC-R and service water heating equipmentKosta Kamberisenergy_progress
10/24/2024HVAC-R and service water piping design and insulationKosta Kamberisenergy_progress
10/24/2024Sprinkler SystemsKosta Kamberisspecial
10/15/2024Sprinkler SystemsKosta Kamberisspecial
10/15/2024Energy Code Compliance InspectionsKosta Kamberisprogress
Latest 25 of 30.
▾Documents — 49 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/23/2026Q00953855-I1Request digital key ↗
08/23/2026Q00996800-I1Request digital key ↗
08/19/2026Q00961361-S1Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026Q00961361-P3Open ↗
08/13/2026Q00961361-P2Open ↗
08/13/2026Q00961361-I1Open ↗
▸Seals & Professional Certifications18
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/23/2026Q00953855-I1Open ↗
08/23/2026Q00996800-I1Open ↗
08/19/2026Q00961361-S1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026Q00961361-I1Open ↗
09/01/2026Q00961361-I1Open ↗
08/30/2026Q00961361-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026Q00961361-I1Open ↗
09/01/2026Q00961361-I1Open ↗
08/30/2026Q00961361-P1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/19/2026Q00961361-I1Open ↗
08/19/2026Q00961361-P3Open ↗
08/19/2026Q00961361-P2Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/19/2026Q00961361-I1Open ↗
08/19/2026Q00961361-S4Open ↗
08/19/2026Q00961361-S1Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/23/2026Q00953855-I1Open ↗
▸Other Documents13
▸DOB NOWProperty Ownership Certification3
08/19/2026Q00961361-I1Open ↗
08/19/2026Q00961361-P3Open ↗
08/19/2026Q00961361-P2Open ↗
▸DOB NOWSite Survey: Initial3
08/13/2026Q00961361-I1Open ↗
08/13/2026Q00961361-P2Open ↗
08/13/2026Q00961361-P3Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q00961361-P3Open ↗
08/13/2026Q00961361-P2Open ↗
08/13/2026Q00961361-I1Open ↗
▸DOB NOWPlot Diagram3
08/13/2026Q00961361-I1Open ↗
08/13/2026Q00961361-P2Open ↗
08/13/2026Q00961361-P3Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00961361-I1Open ↗