← Back
Elevator cooperative
Mitchell Gardens 3
26-10 UNION STREET · BIN 4443552
💬 Discuss this project
1957Year Built
6Stories
D4Building Class
R5Zoning
500,710 sfGross Floor Area
504Units
LL97 CoveredRent Stabilized68 Open Violations 45 unresolved · 23 paperwork only ▸FISP: SAFEFDNY Report ↗
Elevator cooperative · Owner of record: MITCHELL GARDENS #3 COOPERATIVE · 431,000 sf lot · 1.16 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof1p · 1 filing · 13 docs
Bulkhead1p · 1 filing · 13 docs
Cellar7p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FIRSTSERVICE RESIDENTIAL607/08/2026
KINGS GROUP NY1407/08/2026
MICHELL GARDENS #3 COOPER203/22/2026
MITCHELL GARDENS #3 COOPE703/22/2026
MITCHELL GARDENS SEC 3103/21/2026
MITCHELL GARDENS NO 3 COOP803/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOSEPH K. BLUM CO. LLP206/29/2026
ROBERT GERMAIN JR. PE608/26/2025
AG ENGINEERING PLLC111/15/2023
SYED ENGINEERING, P.C.106/30/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARSENAL BUILDING CONSULTANTS LLC203/21/2026
D D EXPEDITORS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KINGS GROUP NY CORPGeneral Contractor1207/08/2026
SKYLINE BUILDERS GROUP LLGeneral Contractor1107/08/2026
AGGRESSIVE HEATING INCGeneral Contractor203/21/2026
CAM ENERGY HTG&MECH CORPPlumbing207/08/2026
CUOMO, FElectrical103/21/2026
KANHAI, ONEILElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JOSEPH K. BLUM CO. LLP1741206/29/2026
ROBERT F. GERMAIN JR. PE5100608/26/2025
Building Lifecycle
All (118)Filed (10)Permit Issued (16)Signed Off (2)Facade (FISP) (18)Violation (48)Inspection (4)Special Inspection (20)
07/21/2026
Special inspection requirement — Final
Dane Barnes
07/21/2026
Special inspection requirement — Masonry
Dane Barnes
07/21/2026
Special inspection requirement — Energy Code Compliance Inspections
Dane Barnes
07/21/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Dane Barnes
07/21/2026
Special inspection requirement — Air barrier - visual inspection
Dane Barnes
07/21/2026
Special inspection requirement — Fenestration air leakage
Dane Barnes
06/29/2026
Filed — Alteration
Repair/replace all facades to include masonry, pointing, lintels, sills, scrape and paint fire escapes
Q00480055-P1
06/14/2026
Special inspection requirement — Masonry
Dane Barnes
06/14/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Dane Barnes
06/14/2026
Special inspection requirement — Energy Code Compliance Inspections
Dane Barnes
06/14/2026
Special inspection requirement — Fenestration air leakage
Dane Barnes
06/14/2026
Special inspection requirement — Final
Dane Barnes
06/14/2026
Special inspection requirement — Air barrier - visual inspection
Dane Barnes
12/19/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/08/2025
Inspection — Fail-Final Boiler Equipment Inspection
Fail
View inspection ↗
12/06/2025
Violation issued (HPD, open)
C
12/06/2025
Violation issued (HPD, open)
B
12/06/2025
Violation issued (HPD, open)
B
12/06/2025
Violation issued (HPD, open)
C
12/06/2025
Violation issued (HPD, open)
C
11/27/2025
Violation issued (HPD, open)
C
11/27/2025
Violation issued (HPD, open)
C
11/27/2025
Violation issued (HPD, open)
C
11/27/2025
Violation issued (HPD, open)
A
11/27/2025
Violation issued (HPD, open)
B
11/27/2025
Violation issued (HPD, open)
C
11/27/2025
Violation issued (HPD, open)
C
10/08/2025
Permit issued — Plumbing
Q00975821-S1-PL
08/28/2025
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
Robert Germain Jr.
08/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Germain Jr.
08/27/2025
Special inspection requirement — Chimneys and vents
Robert Germain Jr.
08/27/2025
Special inspection requirement — Final
Robert Germain Jr.
08/26/2025
Filed — Alteration
Q00975821-P3
08/26/2025
Filed — Alteration
Q00975821-P1
08/26/2025
Filed — Alteration
Q00975821-P2
08/21/2025
Violation issued (HPD, closed)
C
08/13/2025
Violation issued (FDNY_NOV, closed)
08/04/2025
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
Robert Germain Jr.
08/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Germain Jr.
08/04/2025
Special inspection requirement — Final
Robert Germain Jr.
08/04/2025
Special inspection requirement — Chimneys and vents
Robert Germain Jr.
07/14/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/15/2025
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF NYCC.
Q00546034-I1
05/07/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/10/2025
Permit issued — Boiler Equipment
Q00975821-S2-BE
03/29/2025
Violation issued (FDNY_NOV, closed)
02/28/2025
Cycle 9 facade report signed — SAFE
02/19/2025
Violation issued (FDNY_NOV, closed)
01/14/2025
Permit issued — General Construction
Q00480055-I1-GC
11/21/2024
Cycle 9 facade report submitted
11/21/2024
Cycle 9 facade inspection completed
11/14/2024
Signed off — Alteration
installation of pipe scaffolding. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc.
Q00963315-I1
11/13/2024
Permit issued — Supported Scaffold
Q00963315-I1-SF
06/13/2024
Permit issued — Sidewalk Shed
Q00546034-I1-SH
04/15/2024
Violation issued (HPD, open)
B
04/15/2024
Violation issued (HPD, open)
B
04/15/2024
Violation issued (HPD, open)
C
04/15/2024
Violation issued (HPD, open)
B
04/12/2024
Violation issued (HPD, open)
B
03/24/2024
Violation issued (HPD, open)
B
Latest 60 of 118 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCAM ENERGY HTG&MECH CORP10/08/2025
DOB NOWBoiler EquipmentPermit IssuedRICHARD MORTMAN04/10/2025
DOB NOWGeneral ConstructionSigned-offSKYLINE BUILDERS GROUP LL01/14/2025
DOB NOWSupported ScaffoldSigned-offKINGS GROUP NY CORP11/13/2024
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP06/13/2024
DOB NOWPlumbingSigned-offCAM ENERGY HTG&MECH CORP01/31/2024
DOB NOWBoiler EquipmentPermit IssuedAGGRESSIVE HEATING INC01/29/2024
DOB NOWGeneral ConstructionSigned-offSKYLINE BUILDERS GROUP LL01/12/2024
DOB NOWGeneral ConstructionPermit IssuedAGGRESSIVE HEATING INC01/08/2024
DOB NOWSupported ScaffoldSigned-offKINGS GROUP NY CORP11/16/2023
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP06/15/2023
DOB NOWGeneral ConstructionSigned-offSKYLINE BUILDERS GROUP LL02/02/2023
DOB NOWGeneral ConstructionSigned-offSKYLINE BUILDERS GROUP LL09/07/2022
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP06/21/2022
DOB NOWGeneral ConstructionSigned-offSKYLINE BUILDERS GROUP LL09/09/2021
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP06/30/2021
BISSPISSUEDALKLEM PLUMBING INC.02/07/2005
BISOTISSUEDAPOGEE ENTERPRISED INC.04/18/2003
1 project · most recent 10/05/2021
FiledStatusContractorScope
10/05/2021CompleteHIGH QUALITY ELECTRIC OF—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
12/19/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/08/2025Fail-Final Boiler Equipment InspectionFailView ↗
07/14/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/07/2025Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
07/21/2026FinalDane Barnesprogress
07/21/2026MasonryDane Barnesspecial
07/21/2026Energy Code Compliance InspectionsDane Barnesprogress
07/21/2026Structural Stability – Alterations of existing buildingsDane Barnesspecial
07/21/2026Air barrier - visual inspectionDane Barnesenergy_progress
07/21/2026Fenestration air leakageDane Barnesenergy_progress
06/14/2026MasonryDane Barnesspecial
06/14/2026Structural Stability – Alterations of existing buildingsDane Barnesspecial
06/14/2026Energy Code Compliance InspectionsDane Barnesprogress
06/14/2026Fenestration air leakageDane Barnesenergy_progress
06/14/2026FinalDane Barnesprogress
06/14/2026Air barrier - visual inspectionDane Barnesenergy_progress
08/28/2025Fuel-Oil Storage and Fuel-Oil Piping SystemsRobert Germain Jr.special
08/27/2025Fire-Resistant Penetrations and JointsRobert Germain Jr.special
08/27/2025Chimneys and ventsRobert Germain Jr.special
08/27/2025FinalRobert Germain Jr.progress
08/04/2025Fuel-Oil Storage and Fuel-Oil Piping SystemsRobert Germain Jr.special
08/04/2025Fire-Resistant Penetrations and JointsRobert Germain Jr.special
08/04/2025FinalRobert Germain Jr.progress
08/04/2025Chimneys and ventsRobert Germain Jr.special
▾Documents — 43 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/27/2026Q00480055-I1Request digital key ↗
08/27/2026Q00480055-P1Request digital key ↗
08/27/2026Q00546034-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Seals & Professional Certifications24
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/27/2026Q00480055-P1Open ↗
08/23/2026Q00975821-I1Open ↗
08/23/2026Q00975821-S1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/23/2026Q00975821-P3Open ↗
08/28/2026Q00975821-I1Open ↗
08/28/2026Q00975821-S1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
08/28/2026Q00975821-I1Open ↗
08/25/2026Q00975821-P1Open ↗
08/24/2026Q00480055-I1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/27/2026Q00480055-P1Open ↗
08/23/2026Q00975821-S1Open ↗
08/23/2026Q00975821-I1Open ↗
Showing 3 of 8 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/27/2026Q00480055-I1Open ↗